Dear Members,
Your Directors are pleased to present the 25th Annual Report
of PNC Infratech Limited ("the Company" or "PNCIL") along with the
summary of the Audited Standalone and Consolidated Financial Statements for the financial
year ended March 31,2024.
1. RESULTS OF OUR OPERATIONS
The financial performance of the Company for the year ended March
31,2024, on a Standalone and Consolidated basis, is summarized below:
' in Lakhs (except EPS)
Particulars |
Standalone Results For the
year ended as at |
Consolidated Results For the
year ended as at |
|
March 31, 2024 |
March 31, 2023 |
March 31, 2024 |
March 31, 2023 |
Revenue from Operations |
7,69,919.53 |
7,06,083.99 |
8,64,989.78 |
7,95,608.29 |
Less: Total Expenses |
6,59,088.62 |
6,28,075.65 |
7,48,263.87 |
7,07,925.01 |
Add/(Less): Share in profit/ (loss) of Associates |
__ |
__ |
__ |
__ |
Profit/(Loss) before tax & prior period expenses |
1,13,607.19 |
81,835.72 |
1,24,874.29 |
95,746.16 |
Add/(less): Prior period expense (Net)/Exceptional Item |
.. |
.. |
.. |
.. |
Profit/(Loss) Before Tax |
1,13,607.19 |
81,835.72 |
1,24,874.29 |
95,746.16 |
Less: Tax Expense (Net) |
28,628.19 |
20,688.36 |
33,932.22 |
29,901.10 |
Profit /(Loss) After Tax |
84,979.00 |
61,147.36 |
90,942.07 |
65,845.06 |
Earnings Per Share (Basic & Diluted) |
33.13 |
23.84 |
35.45 |
25.67 |
2. FINANCIAL PERFORMANCE On Standalone Basis
On a standalone basis, revenue of the Company for FY 2023-24 is '
7,69,919.53 Lakhs as compared to ' 7,06,083.99 Lakhs in FY 2022-23. The Operating Profit
(i.e. Earnings before Interest, Tax, Depreciation and Amortization) for FY 2023-24 is '
127740.13 Lakhs as compared to ' 95388.26 Lakhs in FY 2022-23. The Profit before Tax for
FY 2023-24 is ' 1,13,607.19 Lakhs as compared to ' 81,835.72 Lakhs in FY 2022-23. The
Profit after Tax for FY 2023-24 is ' 84979.00 Lakhs as compared to ' 61147.36 Lakhs in FY
2022-23.
On Consolidated Basis
The Consolidated Revenue of the Company for FY 2023-24 is ' 8,64,989.78
Lakhs as compared to
' 7,95,608.29 Lakhs in FY 2022-23. The Consolidated Operating Profit
(i.e. Earnings before Interest, Tax, Depreciation and Amortization) for FY 2023-24 is '
2,00,452.84 Lakhs as compared to ' 1,60,004.82 Lakhs in FY 2022-23. The Consolidated
Profit before Tax for FY 2023-24 is ' 1,24,874.29 Lakhs as compared to ' 95,746.16 Lakhs
in FY 2022-23. The Consolidated Profit after Tax, Minority Interest and Share in Profit /
Loss of Associate for FY 2023-24 is ' 90,942.07 Lakhs as compared to ' 65,845.06 Lakhs in
FY 2022-23.
3. CHANGE IN NATURE OF BUSINESS
There was no change in the nature of the business during FY 2023-24.
4. STATE OF AFFAIRS & FUTURE OUTLOOK
During the year and up to the date of this Report, the Company has bid
for and has been awarded LOA/become L1 for the following projects:
"Construction of Western Bhopal Bypass as 4-lane with paved
shoulders along with service road starts from km 424.0 of Jabalpur-Bhopal Road (NH-46) and
end at km 21.0 of Bhopal-Dewas Road (SH-28) with a Design length of 40.90 km in the State
of Madhya Pradesh on Hybrid Annuity Mode (HAM)" awarded to the Company vide Letter of
Award dated January 16, 2024 by M.P Road Development Corporation Ltd. (MPRDC).
For the execution of the said project new SPV has been incorporated
namely "WESTERN BHOPAL BYPASS PRIVATE LIMITED"
"Construction of Four Lane Elevated Corridor/Flyover from Maharani
Laxmibai Pratima to A.B. Road (N.H. 46) Near Girwai Police Chouki on Swarn Rekha River in
Gwalior City (2nd phase) in the state of Madhya Pradesh on EPC Mode".
In respect of the aforesaid project the Company has received a Letter
of Acceptance from the Madhya Pradesh Public Works Department (M.P.P.W.D.) on February 26,
2024.
The Company is presently executing the following major projects:
A: Highways & Expressways
SN. Sector |
Name of Project |
National 1. Highways |
Four laning from Km.358.500 to Km.414.205, Challakere to
Hariyur section of NH-150A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State
of Karnataka. |
2 National Highways |
Four laning of Meerut-Nazibabad section from Km 11.500 to Km
39.240 & from Km 86.590 to Km 112.545 of NH 119 (New NH-34) in the state of Uttar
Pradesh under Bharatmala Pariyojana on HAM. |
3 National Highways |
Construction of Six lane upgradable to Eight lane of Kanpur
Lucknow Expressway including spur from km. 10.980 to km. 28.500 in the state of Uttar
Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojana (Package- 1). |
National 4 Highways |
Construction of Six lane upgradable to Eight lane of Kanpur
Lucknow Expressway including spur from km. 28.500 to km. 73.744 in the state of Uttar
Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojana (Package- 2). |
5 National Highways |
Improvement and Up-gradation of Existing Road to 4-lane with
Paved Shoulder from Km 175.080 to Km 229.070 End of Hardoi Bypass to End of Hardoi
District of NH-731 (Pkg-III) on Hybrid Annuity Mode under NH(O) in the state of Uttar
Pradesh. |
6 National Highways |
Four Laning of Sonauli - Gorakhpur section of NH-29E from
Design Ch.0+000 to Design Ch.79+540 (from Existing Ch.0+000 to Existing Ch.80+295) on
Hybrid Annuity Mode basis in the state of Uttar Pradesh. |
7 National Highways |
Construction of 6 Lane with Access Controlled Greenfield
Highway from km. 26.000 to km 97.000, MH/KN Border (Badadal) to Maradgi S Andola section
of NH-150C (Package- II of Akkalkot to KN/ TS Border section) on Hybrid Annuity Mode under
Bharatmala Pariyojna. |
8 National Highways |
Four Laning of NH 530B from Mathura Bypass (Start) (Existing
km.266.000 of SH 33 / Design Km.0.000) to Gaju Village (End) (Design Km.32.982) (Design
Length= 32.982 km) in the State of Uttar Pradesh on Hybrid Annuity Mode (Package - 1B). |
9 National Highways |
Four Laning of NH 530B from Gaju Village (Design km 32.982
Mathura-Aligarh District Boundary) to Devinagar Bypass (Existing Km.208.000 of SH
33(NH-530B)-(Design Km.66.000) (Design Length 33.018 km) in Uttar Pradesh on Hybrid
Annuity Mode (Package - 1C). |
10 National Highways |
Construction of 4-Lane Highway from km 49.155 to km 74.700
(Singraur Uphar to Baranpur Kadipur Ichauli) of NH-731a with paved shoulders (I/c Ganga
Bridge) in the state of Uttar Pradesh on Hybrid Annuity Mode (Package - III). |
B: Rural Drinking Water Supply & Irrigation Projects
Drinking 11. Water Supply Phase I |
Construction of Haraulipur Group of Villages Surface &
Ground Water Schemes in Hamirpur district incl. Commissioning and Operation &
Maintenance for 10 Years. |
Drinking 12. Water Supply Phase II |
Survey, Design, Preparation of DPR, Construction,
Commissioning and O&M for 10 Years of various Rural Water Supply Projects in the State
of Uttar Pradesh as per Request for Proposals in Division "Devipatan"
(District-Bahraich), in Division "Bareilly" (Districts Budaun & Philibhit)
and in Division- "Aligarh" (District-Kasganj) in UP under Phase-II. |
Drinking 13. Water Supply Phase III |
Survey, Design, Preparation of DPR, Construction,
Commissioning and O&M for 10 Years of various Rural Water Supply Projects in the State
of Uttar Pradesh as per Request for Proposal in Division- "Bareilly" (District
Budaun); in Division "Ayodhya" (District-Barabanki) and in Division
"Aligarh" (District - Aligarh) under Phase-III. |
14. Irrigation |
Upgradation of Canal System from Pothireddypadu Head
Regulator, from foreshore of Srisailam Reservoir & improvements to existing SRBC/GNSS
Canal |
C: Railway Project
Haryana 15. Orbit Rail Project |
C-23: - Design and Construction of Civil Works (Earthwork,
Bridges, Station Buildings, Retaining Walls and other miscellaneous Works) from km 29.58
to km 49.70 & from km 55.60 to km 61.50 and its connectivity to IR network from New
Patli to Patli station & New Patli to Sultanpur station including modifications/civil
works at Sultanpur Station in connection with laying of New BG Double Railway line of HORC
project. |
5. DIVIDEND
Keeping in the view of the Company's performance, the Board of
Directors have recommend Final Dividend of 30% i.e ' 0.60 per equity share of ' 2.00 each
on, 25,65,39,165 no of equity shares, amounting of ' 15,39,23,499.00 for FY 2023-24.
Pursuant to the Finance Act, 2020, dividend is taxable in the hands of
the shareholders with effective from April 01, 2020 and tax has been deducted at source on
the Dividend at prevailing tax rates inclusive of applicable surcharge and cess based on
information received by the Registrar and Transfer Agent ("RTA") and the Company
from the Depositories.
6. TRANSFER TO RESERVES
The Board of Directors of the Company has not recommended for transfer
of any amount to the General Reserve for the Financial Year ended March 31, 2024.
7. SUBSIDIARIES, JOINT VENTURES AND ASSOCIATE COMPANIES
The Company has one (1) direct subsidiary and twenty- nine (29)
step-down subsidiaries as on March 31, 2024. There are no associates or joint ventures of
the Company. In accordance with Sec 129(3) of the Companies Act, 2013 (Act),a statement
containing the salient features of the financial statement of the subsidiaries in
prescribed format AOC-1 form the part of consolidated financial statement.
During the period under review, The Company has executed a Share
Purchase Agreement dated January 15, 2024 and other related transaction documents, with
inter alia PNC Infra Holdings Limited, Target
SPVs, Highways Infrastructure Trust (Purchaser) and Highway Concessions
One Private Limited (acting as the Investment Manager of the Purchaser), for divestment of
12 highway assets of the Company (12 Target SPVs) wherein, target SPvs defined hereunder:
SN. Target SPV
1. PNC Rajasthan Highways Private Limited
2. PNC Chitradurga Highways Private Limited
3. PNC Aligarh Highways Private Limited
4. PNC Bundelkhand Highways Private Limited
5. PNC Khajuraho Highways Private Limited
6. PNC Triveni Sangam Highways Private Limited
7. PNC Bareilly Nainital Highways Private Limited
8. PNC Challakere (Karnataka) Highways Private Limited
9. PNC Bithur Kanpur Highways Private Limited
10. PNC Unnao Highways Private Limited
11. PNC Gomti Highways Private Limited
12. PNC Meerut Haridwar Highways Private Limited
The Company has a material unlisted Subsidiary as defined under
Regulation 16 of the SEBI Listing Regulations. Accordingly, the corporate governance
requirements as applicable with respect to material unlisted subsidiary has been complied
with.
The Company's Audit Committee reviews the Consolidated Financial
Statements of the Company as well as the Financial Statements of the Subsidiaries,
including the investments made by the Subsidiaries. The Minutes of the Board Meetings,
along with a report of the significant transactions and arrangements of the unlisted
subsidiaries of the Company, as applicable, are placed before the Board of Directors of
the Company.
The Company has formulated a policy for determining Material
Subsidiaries and the Policy is disclosed on the Company's website at the web link:
https://www. pncinfratech.com/pdfs/policy-for-determining- material-subsidiaries-2022.pdf
8. MATERIAL CHANGE AFFECTING THE FINANCIAL POSITION OF THE COMPANY
No material changes that affecting the financial position of the
Company.
9. DIRECTORS' RESPONSIBILITY STATEMENT
Pursuant to Section 134 (5) of the Companies Act, 2013, Your
Directors' confirm that:
(a) in the preparation of the annual accounts, the applicable
accounting standards had been followed along with proper explanation relating to material
departures;
(b) the directors had selected such accounting policies and applied
them consistently and made judgments and estimates that are reasonable and prudent so as
to give a true and fair view of the state of affairs of the Company at the end of the
financial year and of the profit and loss of the Company for that period;
(c) the directors had taken proper and sufficient care for the
maintenance of adequate accounting records in accordance with the provisions of this Act
for safeguarding the assets of the Company and for preventing and detecting fraud and
other irregularities;
(d) the directors had prepared the annual accounts on a going concern
basis;
(e) the directors had laid down internal financial controls which are
followed by the Company and that such financial controls are adequate and are operating
effectively; and
(f) the directors had devised proper systems to ensure compliance with
the provisions of all applicable laws are in place and such systems are adequate and
operating effectively.
10. CORPORATE GOVERNANCE
The Company continues to place greater emphasis on managing its affairs
with diligence, transparency, responsibility and accountability and is committed to
adopting and adhering to best Corporate Governance practices.
The Board considers itself as a trustee of its shareholders and
acknowledges its responsibilities towards them for creation and safeguarding their wealth.
The Company has set itself the objective of expanding its capacities. As a part of its
growth strategy, it is committed to high levels of ethics and integrity in all its
business dealings that avoid conflicts of interest. In order to conduct business with
these principles, the Company has created a corporate structure based on business needs
and maintains a high degree of transparency through regular disclosures with a focus on
adequate control systems.
In compliance with the provisions of SEBI (Listing Obligations and
Disclosure Requirements) Regulations, 2015 ('SEBI Listing Regulations') a separate
report on corporate governance along with a certificate from the M/s DR Associates,
Company Secretaries, on its compliance, forms an integral part of this report .
11. RISK MANAGEMENT
The Company has constituted a Risk Management Committee which has been
entrusted with the responsibility to assist the Board in (a) approving the Company's
Risk Management Framework and (b) Overseeing all the risks that the organization faces
such as strategic, financial, liquidity, security, regulatory, legal, reputational and
other risks that have been identified and assessed to ensure that there is a sound Risk
Management Policy in place to address such concerns / risks. The Risk Management process
covers risk identification, assessment, analysis and mitigation. Incorporating
sustainability in the process also helps to align potential exposures with the risk
appetite and highlight risks associated with chosen strategies.
The Company has adopted a Risk Management Policy in accordance with the
provisions of the Act and Regulation 21 of the SEBI Listing Regulations.
12. CONTRACTS AND ARRANGEMENTS WITH RELATED PARTIES
During FY 2023-24, the Company has entered into transactions with
related parties as defined under Section 2(76) of the Companies Act, 2013 read with the
Companies (Specification of Definitions Details) Rules, 2014, which were in the ordinary
course of business and on arm's length basis and in accordance with the provisions of
the Companies Act, 2013, rules issued there under and in compliance of the "Policy On
Materiality And Dealing With Related Party Transactions" of the Company and in
accordance with Regulation 23 of the SEBI Listing Regulations. During FY 2023-24, the
Company did not enter into materially significant transactions with Promoters, Key
Managerial Personnel or other related parties. Accordingly, the disclosure of Related
Party Transactions as required under Section 134(3) (h) of the Companies Act, 2013 in Form
AOC 2 is not applicable. The details of the related party transactions as required under
IND AS- 24 are set out in Notes to the standalone financial statements forming part of
this Annual Report.
The policy on Related Party Transactions as approved by the Board may
be accessed on the Company's website at the link: https://www.pncinfratech.com/
pdfs/policy-on-materiality-and-dealing-with- relatedparty-transactions-pnc.pdf
13. CORPORATE SOCIAL RESPONSIBILITY (CSR)
As part of the Corporate Social Responsibility initiative, the Company
has spent an amount of ' 1,437.40 Lakhs/-towards the various CSR activities during FY
2023-24. A report on CSR Activities as required under Rule 9 of the Companies (Corporate
Social Responsibility) Rules, 2014, as amended is enclosed herewith as
"Annexure-A".
A synopsis of the report of the independent agency for the CSR
projects, to which impact assessment is applicable in terms of the provisions of Section
135 of the Act read with the CSR Rules, has been provided as part of the said annual
report on CSR. The detailed report is available on the Company's website at https://
www.pncinfratech.com/financials.html
The Company has adopted Corporate Social Responsibility Policy in line
with Schedule-VII of Companies Act 2013 and amendment thereof, containing the activities
to be undertaken by the Company as part of its CSR programs. The CSR Policy is disclosed
on the website of the Company which can be accessed at https://www.pncinfratech.com/pdfs/
csr-policy-2022.pdf.
14. I NTERNAL FINANCIAL CONTROL SYSTEMS AND THEIR ADEQUACY
The details in respect of internal financial control and their adequacy
are included in the Management Discussion and Analysis.
15. POLICY ON DIRECTOR'S APPOINTMENT AND REMUNERATION
The Policy is framed to address the importance of a diverse Board in
harnessing the unique and individual skills and experiences of various Members of the
Board in such a way that it collectively benefits the business and the Company as whole.
As on March 31, 2024, The Board consists of 10 directors, five of whom are executive
directors and five non-executive directors.
The Board Diversity Policy of the Company on director's
appointment and other matters provided under sub section 3 of section 178 of the Companies
Act, 2013 is available at the website of the Company and that can be accessed at
https://www.pncinfratech.com/pdfs/ board-diversity-policy.pdf.
16. DIRECTORS AND KEY MANAGERIAL PERSONNEL
In accordance with the provisions of Section 152 of the Companies Act,
2013 and the Articles of Association of the Company, Mr Yogesh Kumar Jain (DIN: 00086811)
and Mr Anil Kumar Rao (DIN: 01224525), Directors retires by rotation at the ensuing Annual
General Meeting and being eligible offers themselves for re-appointment. The Board
recommends the reappointment of Mr Yogesh Kumar Jain and Mr Anil Kumar Rao for the
consideration of the members of the Company at the ensuing annual general meeting.
During the year under review, Mr Bhupinder Kumar Sawhney has been
resigned from the position of Chief Financial Officer (CFO) of the Company with effect
from May 31, 2023 and Mr Devendra Kumar Agarwal appointed as Chief Financial Officer (CFO)
of the Company with effect from August 30, 2023.
Pursuant to the provision of section 203 of the Companies Act, 2013 the
Key Managerial Personnel of the Company as on March 31,2024 are:-
1. Mr Pradeep Kumar Jain, Chairman & Managing Director
2. Mr Chakresh Kumar Jain, Managing Director
3. Mr Yogesh Kumar Jain, Managing Director
4. Mr Anil Kumar Rao, Whole time Director
5. Mr Talluri Raghupati Rao, Whole time Director
6. Mr Devendra Kumar Agarwal, Chief Financial Officer
7. Mr Tapan Jain, Company Secretary
None of the Directors of the Company is disqualified under Section 164
of the Companies Act, 2013.
Also, during the year, the non-executive directors of the Company had
no pecuniary relationship or transactions with the Company, other than sitting fees,
commission and reimbursement of expenses, if any.
17. DECLARATION BY INDEPENDENT DIRECTORS
In accordance with the Section 149(7) of the Act, each Independent
Director has given a written declaration to the Company at the time of their appointment
and at the first meeting of the Board of Directors in every financial year confirming that
he/she meets the criteria of independence as mentioned under Section 149(6) of the
Companies Act, 2013 and Regulation 16(1) (b) and Regulation 26 of the SEBI Listing
Regulations and there has been no change in the circumstances which may affect their
status as an independent director during the year. The Independent Directors have complied
with the Code for Independent Directors prescribed in Schedule IV to the Companies Act,
2013 along with code of conduct for all members of board in terms of Regulation 17(5) of
SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015.
Further, in the opinion of the Board, all the Independent Directors
also possess the attributes of integrity, expertise and experience as required to be
disclosed under Rule 8(5) (iii) (a) of the Companies (Accounts) Rules, 2014.
Pursuant to Ministry of Corporate Affairs' Notification No. G.S.R.
804(E) dated October 22, 2019, all the Independent Directors have registered themselves in
the databank of Indian Institute of Corporate Affairs (IICA).
18. BOARD EVALUATION AND REMUNERATION
POLICY
Pursuant to the applicable provisions of the Act and the SEBI Listing
Regulations, the Board has carried out an Annual Evaluation of its own performance,
performance of the Directors and the working of its Committees, based on the evaluation
criteria defined by Nomination and Remuneration Policy for performance evaluation process
of the Board, its Committees and Directors. NRC Policy of the Company is available on
Company's website at link https://www.pncinfratech.com/pdfs/ nrc-policy-2023.pdf.
The performance of the Board was evaluated by the Board after seeking
inputs from all the directors on the basis of criteria such as the Board composition and
structure, effectiveness of board processes, information and functioning, etc.
The performance of the Committees was evaluated by the Board after
seeking inputs from the Committee members on the basis of criteria such as the composition
of committees, effectiveness of Committee meetings, etc.
The performance assessment of Non-Independent Directors, Board as a
whole and the Chairman were evaluated at separate meetings of Independent Directors. The
same was also discussed in the meetings of NRC and the Board. Performance evaluation of
Independent Directors was done by the entire Board, excluding the Independent Director
being evaluated.
19. FAMILIARIZATION PROGRAMME FOR BOARD MEMBERS
A formal familiarization programme was conducted about the amendments
in the Companies Act, 2013; Rules prescribed thereunder, SEBI (Listing Obligations and
Disclosure Requirements) Regulations, 2015 and all other applicable laws of the Company.
It is the general practice of the Company to notify the changes in all the applicable laws
from time to time in every Board Meeting conducted.
The Company familiarizes its Independent Directors with their roles,
rights, responsibilities in the Company, nature of the Industry in which the Company
operates, etc., through various programmes. These include orientation program upon
induction of new Director, as well as other initiatives to update the Directors on an
ongoing basis.
Further, the Company also makes periodic presentations at the Board and
Committee meetings on various aspects of the Company's operations including on Health
and Safety, Sustainability, Performance updates of the Company, Industry scenario,
Business Strategy, Internal Control and risks involved and Mitigation Plan.
20. HUMAN RESOURCES
The Company treats its "Human Resources" as one of its most
important assets. The Company continuously invests in attraction, retention and
development of talent on an ongoing basis. The Company believes in the promotion of talent
internally through job rotation and job enlargement.
21. SHARE CAPITAL
During the year under review, the Company has not issued or allotted
any equity shares with or without differential voting rights. The Paid - up Equity Share
Capital of the Company as at March 31,2024 stood at ' 51,30,78,330/-
22. AUDITORS AND AUDITORS' REPORT Statutory Auditors
At the 22nd Annual General Meeting held on 29th September, 2021, the
shareholders approved the appointment of M/s NSBP & Co. (Firm Registration No.
001075N) Chartered Accountants, as Statutory Auditors of the Company until the conclusion
of 27th Annual General Meeting of the Company to be held in the year 2026.
Auditor's Report
The Auditors' have issued an unmodified Report for the year ended
March 31, 2024 which is self explanatory hence, do not call for any comments from the
Management under Section 134 of the Companies Act, 2013.
Cost Auditors
The Board had appointed M/s Rohit Bansal & Associates, Cost
accountant, as Cost Auditor for conducting the audit of Cost Statements and Cost Records
of the Company for the FY 2023-24 and Form CRA-2 for their appointment was duly filed by
the Company with the Ministry of Corporate Affairs. The said Auditors have conducted the
audit of Cost Statements and Cost records for the year ended March 31, 2024 and have
submitted their report, which is self explanatory and do not call for any further
comments.
The Company shall submit the Cost Audit Report with the Ministry of
Corporate Affairs within the stipulated time period.
The Board further re-appointed M/s. Rohit Bansal & Associates, Cost
Accountant, as Cost Auditor to conduct Cost Audit for FY 2024-25 and their remuneration
has also been recommended for the ratification and approval of the Shareholders.
Secretarial Auditors
In terms of Section 204 of the Act, read with the Companies
(Appointment and Remuneration of Managerial Personnel) Rules, 2014, M/s. DR Associates,
Company Secretaries were appointed as Secretarial Auditors for FY 2023-24. The Secretarial
Audit Report for the financial year ended on March 31, 2024 is annexed herewith marked as
"Annexure-B" to this Report. There are no qualifications or adverse remark in
their Report, hence, does not call for any comments/ explanation from the Management.
The Board further re- appointed M/s. DR Associates, Company
Secretaries, as Secretarial Auditors to conduct Secretarial Audit for FY 2024-25.
The Secretarial Audit Report of Material Unlisted Subsidiaries has been
reviewed and there are no qualifications or adverse remark in their Report that forms an
integral part of this report.
23. MANAGEMENT DISCUSSION & ANALYSIS
In terms of the provisions of Regulation 34 of SEBI Listing
Regulations, the Management Discussion and Analysis forms an integral part of this Report
and gives details of the overall industry structure, developments, performance and state
of affairs of the Company' business.
24. DISCLOSURES Audit Committee
The Audit Committee of the Board of Directors of the Company is duly
constituted in accordance with the provisions of Sections 177 of the Act read with Rule 6
of the Companies (Meetings of the Board and its Powers) Rules, 2013 and Regulation 18 of
SEBI Listing Regulations 2015. The details pertaining to the composition of the Audit
Committee are included in the Corporate Governance Report. All the recommendations made by
the Audit Committee were accepted by the Board.
Vigil Mechanism
The Company is committed to highest standards of ethical, moral and
legal business conduct. Accordingly, the Board of Directors has formulated a Whistle
Blower Policy in compliance with the provisions of Section 177 (9) & (10) of the
Companies Act, 2013 and Regulation 22 of the SEBI Listing Regulations. The policy provides
for a framework and process whereby concerns can be raised by its Employees/Directors or
any other person against any kind of discrimination, harassment, victimization or any
other unfair practice being adopted against them through an e-mail, or a letter for this
purpose to the Vigilance Officer /Chairman of the Audit Committee.
The Policy on vigil mechanism and whistle blower policy may be accessed
on the Company's website at the web link: https://www.pncinfratech.com/pdfs/vigil-
mechanism-whistle-blower-policy-pnc-infratech- limited.pdf.
Meetings of the Board
Six meetings of the Board were held during the year. For details of
meetings of the Board, Please refer to the Corporate Governance Report. The maximum
interval between any two meetings did not exceed 120 days.
Particulars of Loans given, Investments made, Guarantees given and
securities provided
The Company is exempted from the applicability of the provisions of
Section 186 of the Companies Act, 2013
(Act) read with Rule 11 of the Companies (Meetings of Board and its
Powers) Rules, 2014 and Companies (Meetings of Board and its Powers) Amendment Rules, 2015
as the Company is engaged in the business of providing infrastructural facilities.
Details of the Loans, guarantees and investments covered under Section
186 of the Companies Act, 2013, if any, are given in the notes to the financial statements
pertaining to the year under review.
Conservation of Energy, Technology Absorption and Foreign Exchange
Earnings and Outgo
The particulars relating to conservation of energy, technology
absorption, foreign exchange earnings and outgo, as required to be disclosed under the
Act, are provided in "Annexure-C" to this Report.
Extract of Annual Return
As per the requirements of Section 92(3) of the Act and Rules framed
thereunder, the extract of the Annual Return for FY 2023-24 is uploaded on the website of
the Company www.pncinfratech.com.
Particulars of Employees and Related Disclosures
The information required pursuant to Section 197 (12) read with Rule 5
(1) & (2) of the Companies (Appointment and Remuneration of Managerial Personnel)
Rules, 2014, in respect of employees of the Company is herewith annexed as
"Annexure-D".
The statement containing particulars of employees as required under
Section 197(12) of the Companies Act, 2013 read with Rule 5(2) and Rule 5(3) of the
Companies (Appointment and Remuneration of Managerial Personnel) Rules, 2014 forms part of
this Board's report. However, as per Section 136(1) of the Act and second proviso of
Rule 5(3) of the Companies (Appointment and Remuneration of Managerial Personnel) Rules,
2014, the Report and Financial Statements are being sent to the Members of the Company
excluding the said statement. Any Member interested in obtaining a copy of the said
statement may write to the Company Secretary at the Registered Office of the Company.
Business Responsibility & Sustainability Report (BRSR)
SEBI Listing Regulations mandate the inclusion of BRSR from FY 2022-23
onwards as part of the Annual Report for top 1000 listed entities based on market
capitalization calculated as on March 31 of every financial year. In compliance of SEBI
listing Regulations, the Company has prepared the Business Responsibility and
Sustainability Reporting (BRSR) for the FY 2023-24 is herewith annexed as
"Annexure-E".
Dividend Distribution Policy
SEBI Listing Regulations also mandates for top 1000 listed entities
based on market capitalization calculated as on March 31 of every financial year to
formulate a dividend distribution policy ('the policy'). In Compliance of the same,
the policy determining the distribution parameters of dividend to its shareholders was
adopted by the Board of Directors. The Policy is available on the Company's website
at https://www.pncinfratech.com/ pdfs/dividend-distribution-policy.pdf.
Investor Education and Protection Fund (IEPF)
Pursuant to applicable provisions of the Act read with the IEPF
Authority (Accounting, Audit, Transfer and Refund) Rules, 2016, details of all unclaimed
amount of Dividend to be furnished through Form No. IEPF 2 each year and to be uploaded on
Company's Website, on the website of IEPF Authority. The amount of Dividend or any
other such amount as referred in sub-section 2 of section 125 of the Act, which is unpaid
or unclaimed for the financial year under review is mentioned in the Corporate Governance
Report of the Company.
In terms of Rule 7(2B) of the Investor Education and Protection Fund
Authority (Accounting, Audit, Transfer and Refund) Rules, 2016) the Company has designated
Mr Tapan Jain, Company Secretary and Compliance Officer, as a Nodal Officer. These details
are also available on website of the Company i.e. www. pncinfratech.com.
Cost Records
In terms of Rule 8(5) of Companies (Accounts) Rules, 2014, the Company
is required to maintain cost records as specified by the Central Government under
sub-section (1) of section 148 of the Companies Act, 2013 read with rule 3 of Companies
(cost records and audit) Rules, 2014 and accordingly such accounts and records are made
and maintained by the Company.
Policy on Prohibition, Prevention and Redressal of Sexual Harassment of
Women at Workplace
The Company has complied with the provisions relating to the
constitution of Internal Complaint Committee and has adopted a policy on prevention,
prohibition and redressal of sexual harassment at workplace under the Sexual Harassment of
Women at Workplace (Prevention, Prohibition and Redressal) Act, 2013 (India) and the Rules
there under.
During the financial year ended March 31, 2024, the Company has not
received any complaint pertaining to sexual harassment.
25. SIGNIFICANT AND MATERIAL ORDERS
There are no significant and material order passed by the Regulators or
Courts or Tribunals impacting the going concern status and Company's operations in
future.
There is neither any regulatory action initiated nor pending under
Company law or any other statutory act during FY 2023-24.
26. COMPLIANCE OF APPLICABLE SECRETARIAL STANDARDS
The Company has complied with Secretarial Standards issued by the
Institute of Company Secretaries of India on meeting of Board of Directors and General
Meetings.
27. General
Your Directors state that no disclosure or reporting is required in
respect of the following items as there were no transactions on these matters during the
year under review:
i. Details relating to deposits covered under Chapter V of the Act;
ii. Voluntary revision of Financial Statements or Board's Report;
iii. Issue of equity shares with differential rights as to dividend,
voting or otherwise;
iv. Managing Directors and Whole time Director received Commission from
the Company within a regulatory limits of the Company Act 2013 but Neither the Managing
Director nor the Wholetime Directors of the Company received any remuneration or
commission from any of its subsidiaries;
v. There was no instance of reporting of fraud by auditors to the Audit
Committee or the Board;
vi. There was no instance of any Employee Stock Options, Equity Share
with differential voting rights as to dividend, voting or otherwise.;
vii. There is no proceeding pending under the Insolvency and Bankruptcy
Code, 2016;
viii. There was no instance of one-time settlement with any Bank or
Financial Institution.
ix. The Company is not in receipt of any loan amount from any Director
of the Company.
28. ACKNOWLEDGEMENT
Your Directors take this opportunity to thank the stakeholders, banks
and financial institutions, clients, vendors, Intermediaries associated with the Company.
Your Directors also place on records their appreciation for the contribution made by
employees at all levels.
Your Directors gratefully acknowledge the ongoing cooperation and
support from various regulatory bodies, NHAI, MPRDC, UPSHA, HSRDC, MES, DSIIDC, UPEIDA,
MORTH, UP PWD, UP SWSM, AP Government, Ministry of Corporate Affairs, BSE Limited,
National Stock Exchange of India Limited, Securities and Exchange Board of India and other
Central and State Government agencies.
For and on behalf of the Board of Directors |
|
|
Sd/- |
|
Chakresh Kumar Jain |
|
(Managing Director) |
|
DIN:-00086768 |
|
Sd/- |
|
Yogesh Kumar Jain |
Place: Agra |
(Managing Director) |
Date: May 24, 2024 |
DIN:-00086811 |