Dear Members,
The Board of Directors of your Company are pleased to share the
highlights of developments and progress of your Company since its last report along with
audited financial statements, Auditors' Report thereon and comments on the financial
statements by the Comptroller and Auditor General (C&AG) of India.
STATE OF COMPANY'S AFFAIRS
Your Board is reporting the affairs of the Company for the FY 2023-24
as under:
Financial Performance
The standalone / consolidated financial highlights for the year ended
31/03/2024 are summarized below:
(Rs In Crore)
|
Standalone |
Consolidated |
|
Year
ended 31** March, 2024 |
Year
ended 31** March, 2023 |
Year
ended 31** March, 2024 |
Year ended 31* March, 2023 |
PROFIT BEFORE TAX |
5,521.41 |
4,2308 |
5,522.54 |
4,255.89 |
Less: Current Tax |
964.21 |
742.94 |
964.21 |
742.94 |
Deferred Tax |
961.27 |
857.55 |
961.27 |
857.55 |
PROFIT FOR THE YEAR |
3,595.93 |
2,638.39 |
3,597.06 |
2,655.40 |
Add: Other Comprehensive Income |
(5.02) |
(1.05) |
(4.99) |
(1.21) |
TOTAL COMPREHENSIVE INCOME FOR
I IIK YEAR |
3,590.91 |
2,637.34 |
3,592.07 |
2,654.19 |
TOTAL COMPREHENSIVE INCOME
ATTRIBUTABLE TO OWNERS OF THE COMPANY |
3,590.91 |
2,637.34 |
3,592.07 |
2,654.19 |
Add: Opening Balance in Profit
and Loss Account |
8,950.86 |
6,313.52 |
8,980.72 |
6,326.53 |
SUB-TOTAL |
12,541.77 |
8,950.86 |
12,572.79 |
8,980.72 |
LESS: APPROPRIATION |
|
|
|
|
Payment of Dividend on Equity
Shares |
175.26 |
- |
175.26 |
- |
CLOSING BALANCE (INCLUDING OTHER
COMPREHENSIVE INCOME) |
12366.51 |
8,950.86 |
12397.53 |
8,980.72 |
Your Company achieved a turnover of Rs 1,05,190 Crore during the
financial year 2023-24 as against Rs 1,24,686 Crore during the financial year 2022-23. The
Company earned profit of Rs 3,596 Crore (pro t after tax) during the financial year
2023-24 against profit of Rs 2,638 Crore during the Financial Year 2022-23. The Gross Re
ning Margin (GRM) for financial year 2023-24 was US $ 10.36 bbl as against US $ 9.88 bbl
during the financial year 2022-23.
Impacts of Russia-Ukraine War on Financial performance
The Company has assessed the possible effect from Russia-Ukraine War
and ascertained that, there is no impact on the carrying amounts of Property, Plant and
Equipment, Inventories, Receivables and Other Current Assets.
CREDIT RATING
ICRA Limited has reaf rmed the long-term rating of "[ICRA]
AAA" (pronounced as ICRA "Triple A rating with stable outlook") and the
short-term rating of "[ICRA] A1"+ (pronounced as ICRA "A one plus") on
the Rs26,488 Crore bank facilities and also reaf rmed rating of
"[ICRA] AAA" (pronounced as ICRA "Triple A rating with stable
outlook") for the Rs2,060 Crore Non-Convertible Debenture (NCD) Program
of Mangalore Re nery and Petrochemicals Limited. ICRA Limited has also reaf rmed the
rating of "[ICRA] AAA" (pronounced as ICRA "Triple A rating with stable
outlook") on the Issuer Rating.
CRISIL Ratings Limited has reaf rmed "CRISIL AAA/Stable"
(pronounced as "CRISIL triple A rating with stable outlook") for the Rs2,060
Crore Non-Convertible Debenture, its Corporate Credit Rating "CRISIL
AAA/Stable" (pronounced as "CRISIL triple A rating with stable outlook"),
"CRISIL A1+"(pronounced as CRISIL A one plus rating) for short-term bank loan
facility of Rs1,000 Crore and "CRISIL A1+" (pronounced as "CRISIL A
one plus rating") for the Rs 5,000 Crore Commercial Paper (CP) / Short Term
Debt (STD) programme on Mangalore Re nery and Petrochemicals Limited.
CARE Ratings Limited has reaf rmed "CARE AAA/Stable"
(pronounced as "Triple A rating with stable outlook") for the Rs5,000 Crore
Non-Convertible Debenture and the short-term rating of "CARE A1+" (pronounced as
"A one plus") for the Rs5,000 Crore Commercial Paper (CP) / Short Term
Debt (STD) program of Mangalore Re nery and Petrochemicals Limited.
India Ratings and Research Private Limited has reaf rmed Long-Term
Issuer Rating at "IND AAA" (pronounced
as triple A with stable outlook), "IND AAA/Stable"
(pronounced as "triple A rating with stable outlook") for the
Rs5,000 Crore Non-Convertible Debenture program and foreign
currency loan ratings of "IND AAA /Stable" (pronounced as "triple A rating
with stable outlook") for US$305.8 Million programme of Mangalore Re nery and
Petrochemicals Limited.
OPERATIONAL PERFORMANCE FOR FY 2023-24
Some of the major Highlights for the year 2023-24 are as under:
O Mandatory M & I Shutdown of Phase III Re nery units and
Hydrocracker Unit 1 completed and all the units are safely re-started.
O Re nery achieved throughput of 4.416 MMT (Million Metric Tons) during
Q1 of FY 2023-24, which was highest ever first quarter throughput for any year. (Previous
best was 4.325 MMT during Q1 of FY 2022-23)
O Re nery achieved throughput of 4.512 MMT (Million Metric Tons) during
Q4 of FY 2023-24, which was highest ever quarterly throughput during any year (Previous
best was 4.42 MMT during Q4 of FY 2015-16)
O Parallel unloading of crude from two Jetties was carried out using
available infrastructures during monsoon for maximizing throughput.
O Company has imported 20 TMT (Thousand Metric Tons) of opportunity
HSFO for the first time as intermediate feed stock to increase the utilization of
secondary processing units.
O Long term contract was signed with M/S BPCL for supply of RLNG for
using as feed and fuel to re nery and Aromatic Complex.
O During summer of current financial year, re nery sustained
un-interrupted operation, without river water using desalination/ treated municipal waste
water.
O For ensuring safety, integrity and availability of the units,
Aromatic complex was operated on Para-xylene mode for a period of around 17 days.
New Crude processed
O New Crude Namely Siberian Light Crude (Russia), KG D6 Crude (Ruby
FPSO, India) & KG DWN 98/2 Crude (India) were processed for the first time.
Production, Sales and Dispatches
O First parcel of Mineral Turpentine Oil (MTO) was delivered to the
customer during the month of March, 2024.
O Ever Highest PP production recorded in the month of March, 2024 i.e.
43,729 MT, (Previous best was 43,267 MT in October, 2021).
O Ever Highest MS-BS VI production of 195 TMT (Thousand Metric Tons)
was recorded in the month of August, 2023 (Previous best was 174 TMT in June, 2023).
O Ever Highest BS-VI MS dispatch of 215 TMT (Thousand Metric Tons) was
recorded in the month of November, 2023 (Previous best was 188.27 TMT, in July, 2023).
O Ever Highest Reformate production of 104.23 TMT (Thousand Metric
Tons) was recorded from Aromatic complex, in the month of January, 2024 (Previous best was
104.10 in December, 2023).
O Ever Highest Reformate Dispatch of 130.432 TMT (Thousand Metric Tons)
was recorded from Aromatic Complex, in the month of February, 2024 (Previous Highest was
102.20 TMT in the Month of July, 2023).
O Ever Highest ATF production of 222.70 TMT (Thousand Metric Tons) was
recorded in the Month of January, 2024 (Previous Best was 209 TMT in October, 2022).
O Ever Highest ATF dispatch of 227.515 TMT (Thousand Metric Tons) was
recorded in the month of February, 2024. (Previous highest was 222 TMT in March, 2023).
O Ever Highest ATF production of 2.09 MMT (Million Metric Tons) on
Year-on-Year basis was recorded during the year (Previous best was 1.92 MMT in FY
2022-23).
O Ever Highest loading of Coke through Rakes during any month (21
no's), during the month of December, 2023.
th st
O Dispatched 500 Rake of Pet coke from its railway siding on 21
October, 2023.
MARKETING AND BUSINESS DEVELOPMENT
O Your company continues to maintain major share of the direct sales
segment of petroleum products market in Karnataka and adjoining States. Your Company
maintained leadership position in its marketing zone for all
direct sales products such as Bitumen, Diesel, Sulphur, Petcoke, ATF
(thru' JV), Polypropylene, Xylol (Xylenes), Benzene etc. The total direct sales volume of
all products in the domestic market during FY 2023-24 has been 2.6 MMT with a sales value
of Rs15,408 Crores as against 2.3 MMT with a sales value of Rs13,428 Crores in FY 2022-23.
The Company has successfully commissioned 100 retail outlet during FY
2023-24.
As of 31 March, 2024, your company has significantly expanded its
retail operations in the states of Karnataka and Kerala, bringing the total number of
operational retail outlets to 101. In alignment with the geographical expansion strategy,
your company has, for the first time released advertisements, for award of MRPL HiQ
Retail Outlet Dealership in the state of Tamil Nadu along with the
states of Karnataka and Kerala.
In scal year 2024-25, your company plans to extend its retail marketing
footprint to the states of Andhra Pradesh and Telangana with release of advertisements for
the award of dealership in these states during FY 2024-25.
O Your company recorded Polypropylene sale of 384 TMT during FY 2023-24
against production of 389 TMT. MRPL has been continuously expanding its polymer footprints
in the country through small volume MSME
customers to uplift from Depots / CS locations by establishing MRPL
Depots in core demand areas. MRPL
also introduced 65 MFI nucleated grade as a commercial grade for thin
walled Injection Molding application.
O Your Company's joint venture Shell MRPL Aviation Fuel and Services
Limited has steadily acquired business for sale of Aviation Turbine Fuel (ATF) at Indian
airports in South India. The company achieved a turnover of
Rs 2,087.4 Crores during FY 2023-24 as against turnover of Rs 1,619.56
Crores in the previous FY 2022-23.
RECOGNITIONS
1. MRPL received the award for "Best Innovation in Re nery for
2022-23" by MoPNG from Honourable Minister MoPNG during the Energy Technology Meet
held in Mumbai.
2. MRPL becomes India's first re nery to achieve AS9100: D certi cation
for aerospace standards in aviation turbine fuel production.
3. GeM (Government E Market place) has selected MRPL as the winner in
the 'GeM Star Buyers' category in the Kreta- Vikreta Gaurav Samman Samaroh.
4. The company has been recognized as the "Global Water Management
and Conservation Company of the Year 2023" by the Global Energy and Environment
Foundation.
5. Dun & Bradstreet conferred MRPL the award for being the Best
Miniratna in the Manufacturing, Processing and Generation category.
6. The company has been conferred with a Platinum award, Grow Care
India Sustainability Award 2023 & Occupational Health & Safety Award 2023.
7. The company has been awarded in 12 categories during the annual
conference of the Public Relations Council of India held in New Delhi.
8. The company has bagged 3 awards incorporated by the Public Relations
Society of India during its National Conference held in New Delhi in the categories of
Social Media for PR & Branding, Best CSR Project for Child care & Best Skill
Development Program.
9. The company has won the first prize for outstanding contribution to
the implementation of the Of cial Language policy of GoI & Promotion of Hindi in
official work for the year 2022-23.
10.The company has received prestigious EEF Global Water Management
Company of the year award 2023 from
Shri Kaushal Kishore, Minister for Housing and Urban Affairs of India
on 25 August, 2023, at New Delhi. 11.The company has awarded the prestigious Greentech EHS
Award 2023 for its commitment to sustainability and environmental stewardship. The
Greentech Award is given to businesses that demonstrate a commitment to reducing their
environmental impact and promoting sustainability.
12.WIPS-MRPL clinched Second Place among Mini Ratna CPSEs for their
outstanding efforts in empowering
women within the organization.
PROCUREMENT OF GOODS AND SERVICES FROM MSMEs
In line with Public Procurement Policy, 2012 issued by Ministry of
Micro, Small and Medium Enterprises, your Company has achieved 34.20%, i.e., Rs 903.12
Crores procurement of Goods and Services from Micro, Small and Medium Enterprises for the
year 2023-24 against the target of 25%.
In line with the Govt. guidelines, your Company has enhanced the
procurement value through GeM portal during the year 2023-24 and achieved the procurement
of Rs1,179.62 Crores which is 44.67% of the Total Procurement value of non-feed stock
material during the year.
PROJECTS
CCR-1 Revamp
CCR-1 converts heavy naphtha feedstock into high octane reformate for
gasoline blending and produces hydrogen for hydro-treating / hydrocracking. Revamp of
Regenerator section of CCR-1 was carried out to increase Regenerator Coke burn capacity
thereby resulting in overall capacity increase from 75m3/hr to 80m3/hr. The project is
completed and commissioned in May, 2023.
PFCC LPG + Propylene Amine Scrubber
While processing feed with high Sulphur content in Petrochemical
Fluidized Catalytic Cracking (PFCC), higher Hydrogen Sul de (H2S) is expected in LPG and
Propylene stream. Current system to meet H2S in LPG and Propylene product is caustic wash.
Amine Scrubber System reduces dependency on caustic wash to a large extent. The system
removes H2S in the LPG and Propylene streams and minimizes the spent caustic generation in
existing Caustic Treatment System. The project is completed and the plant has been
commissioned in February, 2024.
Scaling up of Desalination Plant from 30 MLD to 40 MLD
MRPL has set up 30 MLD capacity Desalination plant on the shore of
Arabian Sea at Thannirbavi in the New Mangalore Port Authority land to ensure continuous
operation of Re nery during summer / weak monsoons to eliminate the risk of Nethravathi
River being the only source of fresh water. Further scaling up of Desalination plant
capacity from 30 MLD to 40 MLD was taken up. The project is completed and commissioned in
February, 2024.
PFCC Regenerator Stack Wet Scrubber System
The project is conceived to reduce SPM emission in ue gas of PFCC as a
pollution control measure. Petrochemical Fluidized Catalytic Cracking (PFCC) unit
processes unconverted oil from Hydrocracker units, straight run low sulphur vacuum gas oil
and hydro treated heavy Coker gas oil and converts into value added products such as
propylene, LPG and gasoline. The regenerator stack wet scrubber system ensures meeting
emission norms even under adverse situations. Mechanical Completion of the project is
expected in third quarter of FY 2024-25.
Marketing Terminal at Devangonthi
Marketing Terminal at Devangonthi, Bengaluru is being set up to cater
to requirements of petroleum products primarily in the state of Karnataka. The terminal
would receive finished petroleum products (MS, HSD and ATF) through the existing PMHBL
pipeline from MRPL. There will be dosing facility of Ethanol with MS and Bio-diesel with
HSD and tank truck loading facility. This terminal will enable the supply of petroleum
products to the retail outlets, customers & aviation stations in the region.
Construction activities are in nal stages and the Terminal is expected to be commissioned
in second quarter of FY 2024-25.
New Bitumen Blowing Train as a part of extension of existing Bitumen
Blowing Unit
The project envisages setting up of additional Bitumen Blowing train
with a capacity of 144 KTPA as a part of extension of existing Bitumen Blowing Unit to
cater to the simultaneous demand of VG-30 and VG-40 grades of bitumen to leverage market
demand. M/s. Engineers India Limited is the Engineering, Procurement and Construction
Management Consultant for the project. Mechanical Completion of the project is expected in
first quarter of FY 2024-25.
Power System Upgradation Project
The project envisages enhancement of Grid Connectivity and Re nery
System upgradation which includes implementation of Grid connectivity at 220/33kV level to
Re nery and Grid connectivity at 110/33kV to Aromatics Complex. Re nery Electrical system
upgradation, Steam turbo-generators and cooling water system modi cations along with other
enabling activities are part of the scope of this project. Mechanical Completion of the
project is scheduled in third quarter of FY 2025-26.
Iso ButyI Benzene (IBB) Pilot cum Demo Plant
This is MRPL's R&D project. Iso Butyl Benzene(IBB) is an Active
Pharmaceutical Intermediate (API) and a key input for pain killers and is also used in
perfume industry. MRPL has collaborated with CSIR-National Chemical Laboratory (CSIR-NCL)
for developing IBB process technology. MRPL has also got the patent for this process
technology. It is planned to set up a Pilot cum Demo plant of 200 TPA capacity. This
product, IBB shall be manufactured with the captive feedstock available within MRPL.
Mechanical completion of the project is expected to be in the first quarter of FY 2025-26.
Green Hydrogen
As per India's Green Hydrogen Policy, Green Hydrogen has been defined
as Hydrogen produced by way of electrolysis of water using Renewable Energy and the
Hydrogen produced from biomass. As part of the National Green Hydrogen Mission, Re neries
among others, are identified by the Govt. for Green Hydrogen adoption. Company has
initiated setting up 500 TPA Green Hydrogen production unit within the re nery premises.
Green Hydrogen produced from the new unit, would be blended with Hydrogen produced
presently in the Re nery for captive use.
At present, Hydrogen requirement for Hydro-processing units of the MRPL
is met by Hydrogen produced from Steam Methane Reforming (SMR) units. MRPL intends to
produce Green Hydrogen on continuous basis with Renewable Energy Power using water
electrolysis method and the Green Hydrogen produced would be blended with Hydrogen
produced presently in the Re nery for captive use.
Bio ATF
The Bio ATF project has been approved to be setup within the re nery
premises. The project envisages a 20 kl/day Demo Bio-ATF Plant to produce Bio-ATF from
Used Cooking Oil (UCO)/ Tree Born Oil (TBO) and Palm stearin/ Palm Fatty Acid Distillate
(PFAD) for blending with aviation fuel based on technology developed by CSIR- Indian
Institute of Petroleum (CSIR-IIP) and Engineers India Limited in MRPL.
Pipelines and Jetty Infrastructure
A project has been approved to lay a new Fuel Oil pipeline to the New
Mangalore Port Authority (NMPA) port and also provide Jetty infrastructure to interconnect
the Jetty 13 with Jetty 10 & 11 in NMPA along with modi cations to the pipelines from
our Aromatic complex.
DEVELOPMENT OF INFORMATION TECHNOLOGY, SOFTWARE, HARDWARE ETC.
The significance of technology in business continues to expand, with
information technology (IT) playing a pivotal role. Ef cient business planning, real-time
monitoring, customer support and sustainable growth now heavily rely on IT. With the view
to support organizational demands and for effectively utilizing Information technology,
MRPL has been undertaking several digital transformation initiatives.
Migration of SAP system to S/4 HANA:
MRPL has migrated its SAP system to the latest version of S/4 HANA. S/4
HANA is a future-ready Enterprise Resource Planning (ERP) software with built-in analytics
for real time insights and faster decision making. It can be easily integrated with latest
technologies like AI, Machine learning etc. This upgrade will provide real-time data
processing, enabling the organisation to make faster and more informed decisions. The new
system also comes with advanced analytical features, which will help MRPL to identify
trends, improve business processes and make data-driven decisions.
Cyber Security:
Maintaining robust IT security has become imperative due to escalating
cyber threats. MRPL has implemented various measures to safeguard its IT infrastructure,
including establishing an Information Security Management System (ISMS) and obtaining ISO
27001 certi cation. Regular cyber-security exercises and awareness trainings are conducted
to continuously improve and update the company's security posture. Additionally, MRPL has
established a 24/7 Security Operations Center to monitor security events in real-time.
SECRETARIAL STANDARDS
The Secretarial Auditor has certified that your Company has complied
with the applicable Secretarial Standards, i.e. SS-1 and SS-2, relating to 'Meetings of
the Board of Directors' and 'General Meetings', respectively, during the financial year
2023-24.
HEALTH, SAFETY & ENVIRONMENT PERFORMANCE
Occupational Health
1. Health
? MRPL recognizes that a healthy workforce is critical to our success,
and our healthcare facilities aim to provide a conductive and safe environment for our
employees and their families. MRPL has established three Occupational Health Centers and a
Hospital within the premises to provide quality healthcare services to our stakeholders.
MRPL Hospital is equipped with 24X7 ambulance services, emergency
medical aids, essential medicines and antidotes, qualified paramedics, and
Specialist/Super Specialist consultation services on a weekly, fortnightly and monthly
basis. The Hospital has a team of experienced medical professionals, including physicians
and specialists, who provide prompt and reliable medical care to our stakeholders in case
of emergencies.
? To promote health awareness, our company conducted several programs
in 2023-24. First Aid and Basic Life Support training programs were organized for
employees and medical staff to equip them with the skills necessary to respond to
emergencies. Additionally, MRPL organized "World Health Day" on which various
health related competitions like Health quiz, First Aid Demo Competition, Health talk,
Walkathon for employees, their family members and for contract workmen and free Cancer
screening camp for Women Employees.
? Conducted awareness programs on "Prevention of renal Stone and
kidney Failure", Do's and don'ts on snake bite, awareness session and enacted skit
regarding prevention of osteoarthritis of knee, COPD awareness session, Prevention of
Honey Bee Bite and snake bite. Panel discussion on Women health for employees, medical
staffs and secondary workforce to raise awareness about these critical health issues. Our
aim is to prioritize the well-being of our stakeholders and foster a culture of health and
safety within the organization. We believe that investing in the health and safety of
employees and their families is essential for achieving business goals and creating
long-term value for stakeholder.
? Various medical camps that were organized for the wellbeing of
stakeholder in the FY 2023-24 are as below: 1. Sight Saver camps 300 bene ciaries 2. Blood
Donation camp 115 bene ciaries 3. TB symptoms Screening at township 1445 people 4. Cancer
screening camp for women employees.
2. Safety
? There were no major re incidents at Re nery and Aromatics Complex
during FY 2023-24.
? MRPL successfully handled massive shutdown of entire Phase-III Re
nery and Aromatics involving huge manpower without any incidents.
? Technological advancement, such as the use of drone, arti cial
intelligence in safety observations, Mast Climbing Working Platform (MCWP) for safe
painting of stacks were introduced during the shutdown.
? Onsite mock drill was conducted at MRPL in the presence of District
Disaster Management Authorities.
? External Safety Audits (for FY 2023-24) was carried out by M/s OISD
& M/s Consultivo at Re nery complex, and by M/s QSS at Aromatic complex.
3. Environment Management
? Consent for Establishment (CFE) for Modernizations Project, which
incorporates pollution abatement projects was received from KSPCB.
? World Environment Day (WED) 2023 was celebrated on the eve of
14/06/2023 advocating the necessity of Mission LIFE.
? Environmental Clearance (EC) exemption was received for Bio-ATF
Project from MOEF&CC on 21/07/2023.
? Desalination plant was scaled-up from 30 MLD to 40 MLD to ensure
reduction of the consumption of fresh water from Netravati River and continuous operation
of Re nery during summer/weak monsoons.
? Extended Producer Responsibility (EPR) obligations for plastic waste
management have been met.
? An in-house developed and patented a photo catalytic technology for
mitigating the smell issue, a commercial scale plant has been successfully installed in
the Re nery premises. The technology development, design and installation of commercial
plant (De-odorizing unit) has been carried out in-house by MRPL innovation centre.
? A robust waste management system, which includes recycling, reusing,
and responsible disposal of hazardous waste is in place. Hazardous waste is co-processed
through cement industries where it is used as alternate source of energy. Spent catalyst
is recycled through SPCB authorized recyclers and precious metals are recovered.
? Your Company has achieved zero disposal of Non-Recyclable/
Non-Reusable Hazardous waste through Treatment, Storage and Disposal Facility (TSDF).
? Online waste management system for effective waste management has
been implemented.
? Tertiary Treated Municipal Sewage water from Mangalore city was
utilized in MRPL.
? Desalinated water has been maximized to reduce dependency on fresh
water intakes.
4. Sustainability Initiatives
With climate change becoming an increasingly pressing issue, businesses
have a critical role to play in promoting sustainable development. As a responsible and
forward-thinking company, MRPL has recognized this responsibility and have made
sustainability a key priority in our operations. Some of the key sustainability
initiatives we have undertaken in the past year :
? Renewable Energy: Company has continued to produce renewable
energy sources like solar power to reduce our carbon footprint. In addition, we have
implemented energy-ef cient technologies and practices to reduce our energy consumption.
During FY 2023-24, total solar energy generated by MRPL is 7890 MWh and total solar energy
consumed by the company is 16,241 MWh (including the solar energy imported).
? Energy ef ciency: Company has taken up different energy ef
ciency improvement measures and has achieved a total fuel savings of 35,387 SRFT.
· Water conservation: Company has implemented many
water-saving measures like investing in water treatment and recycling technologies to
reduce fresh water footprint. Ef uent recycle and re-use in the re nery has been
maximized. 38,82,528 M3 of desalinated water from plant was utilized in the re nery
complex. In addition to the desalination plant, MRPL is utilizing Mangalore city treated
sewage water to reduce our fresh river water consumption. In FY 2023-24, total Mangalore
city treated sewage water utilized in the re nery is 60,12,092 M3.
? Afforestation initiatives: MRPL has taken several greenbelt
development and compensatory afforestation initiatives to increase its green cover. MRPL
has developed 50 acres of Greenbelt in Pilikula Biodiversity Park with approximately 4000
numbers of different western ghat plant species. MRPL has developed green belt in 25 acres
at Bengre near Thannirbhavi sea shore in co-ordination with Karnataka Forest Department.
? About 36MT of Vermi-compost was harvested from the 3 Vermicompost
facilities and utilized during FY 2023-24.
? Through plantation initiatives, MRPL planted 6,500 saplings of wide
varieties covering endangered, native and fruit bearing trees in the re nery area during
FY 2023-24.
? MRPL has actively engaged with local communities to promote
sustainability awareness and educate them on the importance of responsible environmental
practices. We have also supported environmental initiatives and programs to promote
sustainable development. Some of these activities include providing drinking water
facilities, solar street lights and infrastructure to schools in nearby villages. We have
conducted various community awareness programs in nearby villages to raise awareness on
environmental issues, mainly related to domestic waste management, plastic waste and the
importance of tree plantation among the local community and school children. Additionally,
we have undertaken social welfare projects, such as the "Apath-bandhu" program
to create awareness on emergency and first aid care and the "Nishabda" program
to raise awareness about hearing loss.
CORPORATE SOCIAL RESPONSIBILITY AND SUSTAINABILITY DEVELOPMENT
Corporate Social Responsibility:
MRPL is committed to operate its business in an economically, socially
and environmentally responsible manner, while recognizing the interests of all its
stakeholders and bringing them maximum value. Consequentially, MRPL's social welfare and
community development initiatives revolve around the key areas of education, health care
& sanitation and overall development of basic infrastructure in and around its
operational area, which is Dakshina Kannada district, and it is also extended to other
districts of the State as well. The CSR projects are aligned with Schedule VII of the
Companies Act, 2013.
The company has Corporate Social Responsibility and Sustainable
Development Policy that guides its CSR initiatives. The policy has been amended from time
to time and the noteworthy changes are inclusion of Swachh Bharat initiatives in
allocation of funds for the CSR projects, annual report format etc. The implementation
methodology for CSR initiatives was also revised and delegation of power for approving the
CSR projects. The CSR
& SD Committee continues to evaluate the existing CSR strategy and
bring about necessary changes in its implementation methods.
Major CSR Initiatives:
O Development of Public Park at Karkala.
O Construction of Community Hall at Huvina Hadagali, Vijayanagara Dist.
O Construction of Indoor Stadium at Gonikoppal High School Ground,
Kodagu Dist.
O Providing Napkin Burning Machine (Incinerator) at Govt. High Schools
in Dakshina Kannada.
O Providing Drinking Water facility at Govt Schools in Dakshina
Kannada. O Millets distribution for HIV inmates and Senior Citizens in Dakshina Kannada.
O Providing water puri er and seating arrangement to passengers in
KSRTC Bus Station, Mangaluru. O Arti cial Limb camp to the bene ciaries.
The CSR budget of MRPL for FY 2023-24 was Rs 35.36 Crore and the entire
amount has been committed to various CSR initiatives in FY 2023-24. MRPL has identified
education, healthcare, infrastructure and environment as focus areas for its CSR
engagement for supporting the community. The result of these initiatives is not only a
positive change in the community but also an image of the Company as a responsible
business entity.
Mangalore Re nery & Petrochemicals Limited (MRPL) has been
undertaking Corporate Social Responsibility (CSR) activities under the name of
"Samrakshan". This captures the spirit and commitment of MRPL's CSR initiative,
which is to "protect, preserve and promote the social, cultural and environmental
heritage and wealth in and around the area of our business and to usher in sustainable
development". MRPL is promoting sustainable and equitable development through a
well-orchestrated CSR program. MRPL takes up the CSR programmes under ve focus areas,
namely: 1. Shiksha Samrakshan 2. Arogya Samrakshan 3. Bahujan Samrakshan 4. Prakrithi
Samrakshan 5. Sanskrithi Samrakshan The CSR & SD Policy may be accessed on the
Company's website at
https://admin.mrpl.co.in/img/UploadedFiles/CSR/Files/English/20867d5f4dbc41eabe39bcb065b87a4f.pdf.
The Annual report on CSR activities for FY 2023-24 is annexed herewith as "Annexure-A".
ANNUAL REPORT OF CONSOLIDATED FINANCIAL STATEMENT
st
The Audited Consolidated financial statements for the year ended 31
March, 2024 of the Company form part of the Annual Report in accordance with Section 129
of the Companies Act, 2013 and Ind AS 110 on "Consolidated Financial Statements"
read with Ind AS 28 on "Investments in Associates and Joint Ventures". In
accordance with section 136 of the Companies Act, 2013, the audited financial statements,
including the consolidated financial statements and related information of the Company are
available on the Company's website. These documents will also be available for inspection
during business hours at the registered office of the Company at Mangalore.
INDIAN ACCOUNTING STANDARDS (IND AS) IFRS CONVERGED STANDARDS
The Ministry of Corporate Affairs (MCA) on February 16, 2015, notified
that Indian Accounting Standards (Ind AS) are applicable to certain classes of companies
from April 1, 2016 with a transition date of April 1, 2015. Ind AS has replaced the
previous Indian GAAP prescribed under Section 133 of the Companies Act, 2013 ("the
Act") read with Rule 7 of the Companies (Accounts) Rules, 2014.
TRANSFER TO RESERVES
The Board of Directors have decided to retain the entire amount of
profit for Financial Year 2023-24 in the Statement of Pro t & Loss as at March 31,
2024, hence no amount has been transferred to General Reserve during FY 2023-24.
DIVIDEND
The Board has recommended nal dividend of Rs 2/- per equity share of Rs
10/- each fully paid-up i.e. @20% for the FY 2023-24 in addition to the Interim Dividend
of Rs 1/- per equity share of Rs 10/- each fully paid-up i.e., 10%. With this, the total
dividend for FY 2023-24 is Rs 3/- per share i.e., 30%. The Final Dividend will be paid
within 30 days of approval by the shareholders in the ensuing Annual General Meeting
(AGM). The Dividend Distribution Policy, in terms of Regulation 43A of the Securities and
Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations,
2015 ("SEBI Listing Regulations"), is available on the Company's website:
https://mrpl.co.in/sites/default/
les/Statutory%20Disclosures/Dividend%20Distribution%20Policy_1482132372.pdf
DEPOSITS
Your Company has not accepted / remained unpaid or unclaimed / default
in payment of any deposits and also there is no non-compliance w.r.t any deposits during
the Financial Year pursuant to Section 73 and Chapter V of the Companies Act, 2013 and
Rules there under.
PARTICULARS OF LOANS, GUARANTEES AND INVESTMENTS
There have been no loans / guarantees given or securities provided
during FY 2023-24 under the provisions of Section 185 / 186 of the Companies Act, 2013.
The details of investments covered under the provisions of Section 186 of the Act are
given in notes to financial statements provided in this Annual Report.
SHARE CAPITAL
The Company has not issued any shares during FY 2023-24. The Issued,
Subscribed and Paid up Equity Share Capital of your Company as on 31/03/2024 was about Rs
1,753 Crore. The Company has not issued any equity shares with differential rights as to
dividend, voting or otherwise and also sweat equity shares to employees of the Company
under any scheme during the FY 2023-24.
DISCLOSURE OF ACCOUNTING TREATMENT
In the preparation of Annual Financial Statements for the year ended
March 31, 2024, the applicable Ind AS have been followed. So, there is no treatment
different from that prescribed in Indian Accounting Standards.
DETAILS IN RESPECT OF FRAUDS REPORTED BY AUDITORS UNDER SUB-SECTION
(12) OF SECTION 143 OF COMPANIES ACT, 2013 OTHER THAN THOSE WHICH ARE REPORTABLE TO THE
CENTRAL GOVERNMENT
There have been no instances of fraud to be reported in terms of
Section 143(12) of the Companies Act, 2013.
MATERIAL CHANGES AND COMMITMENTS AFFECTING FINANCIAL POSITION BETWEEN
THE END OF FINANCIAL YEAR AND DATE OF REPORT
No material changes or commitments have occurred after close of the
year till date of review of nancials by Audit Committee and subsequent approval of same by
Board of Directors of the Company which affect the financial position of the Company.
HUMAN RESOURCES
Compensation & Welfare Benefits:
Your company strives to be a model employer and corporate citizen. The
pay and benefits of Management employees of the Company are guided by relevant DPE
guidelines. For non-management, a long term settlement is arrived through collective
bargaining with recognized Unions, and compensation packages are worked out accordingly.
The Company provides comprehensive welfare facilities to its employees to take care of
their health, ef ciency, economic betterment etc. and to enable them to give their best at
the workplace. These welfare benefits of the company are being revised from time to time
in line with the industry practice so as to enable employees to get enhanced benefits.
Employee Relations:
Your Company holds its employees in the highest esteem and accordingly
follows the best in class HR practices, reviews them periodically and strives to further
improve upon that. As a result, the employee relations continue to be cordial and
harmonious. As in the past years, this year too, MRPL is happy to report that not a single
man-hour was lost on account of any industrial disturbance during the financial year
2023-24.
MRPL believes in maintaining healthy, harmonious and productive
Industrial Relations. Standing Orders (Non-Management Employees) and CDA Rules (applicable
for Management employees) de ne the model behavioural requirement of the relevant employee
groups and recourse in case of deviations. The Company adheres to all relevant statutory
requirements and abides by guidelines / requirements of the relevant local authorities
wherever it is working. The Company works towards ensuring safe working conditions and
ensures that wages and welfare facilities to contract labour employed with contractors of
MRPL are in accordance with the statutory provisions.
Recruitment:
During the financial year 2023-24, Company has recruited 80 employees
comprising of 11 Scheduled Caste (SC) employees and 7 Scheduled Tribe (ST) employees and
12 women employees.
Employee Grievance Redressal:
In MRPL, a structured Grievance Redressal Mechanism is in place to
address employee grievances. The mechanism allows employees to escalate their grievances
to the committee and the committee make all its efforts for timely and justi able
redressal of issues & concerns. Further, Collectives and Of cers associations are
engaged at every stage to discuss and negotiate policy issues and address concerns.
Diversity and Inclusion :
MRPL believes in diverse & inclusive work environment for all
regardless of who they are or what they do for the business, feel equally involved in and
supported in all areas of the workplace. At MRPL, Diversity and Inclusion (D&I) go
beyond policies, programmes or headcounts. The Company has zero tolerance for
discrimination of any kind. It believes that Diversity and Inclusion at the workplace
contribute immensely towards reinforcing employee trust and commitment and creating an
agile workforce. The Company policies effectively encourage growth for the women
employees.
MRPL offers requisite facilities and infrastructure to enable Persons
with Disabilities (PwD) to continually create impact in the organisation.
|
|
Employee Diversity |
|
|
|
|
|
Gender |
|
Age Group |
Company |
Employee Category |
Total Strength as on
31.03.2024 |
Male |
Female |
Below 30 yrs |
31 to 40 yrs |
41 to 50 yrs |
51 to 60 yrs |
|
Executives |
1184 |
1114 |
70 |
173 |
326 |
384 |
301 |
|
Non-Executives |
1364 |
1205 |
159 |
188 |
762 |
301 |
113 |
MRPL |
|
|
|
|
|
|
|
|
|
Total |
2548 |
2319 |
229 |
361 |
1088 |
685 |
414 |
|
Percentage % |
9% |
14% |
43% |
27% |
16% |
Reporting on SC / ST / PWD :
Presidential Directives and other Guidelines issued by Department of
Public Enterprises, Ministry of Petroleum & Natural Gas, Ministry of Social Justice
and Empowerment from time to time with regard to reservation in services for Scheduled
Castes, Scheduled Tribes, other backward castes and persons with disabilities have been
complied with. An adequate monitoring mechanism has been put in place for sustained and
effective compliance. Liaison of cers are appointed to ensure implementation of the
Government Directives. Reservation Rosters are maintained as per the directives and are
regularly inspected by the Liaison Of cer of the Company as well as the of cials from
MoP&NG to ensure proper compliance of the Directives. MRPL also
complies with provisions under "The Persons with Disabilities (Equal Opportunities,
Protection of Rights and Full Participation) Act, 1995 relating to providing employment
opportunities for Persons with Disabilities (PWDs). As on 31/03/2024, there are 46
permanent employees with disabilities on the role of MRPL.
Training & Development:
During the Year 2023-24, the Company devoted 6630 Man-days for
training, development and learning, which amounts to 3.60 average Man-days per employee
for Management staff and 1.74 Man-days per employee for Non-Management staff.
Training 7Man-days |
Average Man - days Per
Employee for Management staff |
Average Man-days Per
Employee for Non-Management staff |
6630 |
3.60 |
1.74 |
In accordance with para-29 of the Presidential Directive, statistics
relating to representation of SCs / STs in the prescribed performa, SC/ST/OBC Report I and
SC/ST/OBC Report II are attached as 'Annexure B' to the report.
WOMEN EMPOWERMENT
Prevention of Sexual Harassment at Workplace (POSH) Framework:
The provisions of the Sexual Harassment of Women at Workplace
(Prevention, Prohibition and Redressal) Act, 2013, have been implemented across the
Company with clear objective of providing protection to women against sexual harassment at
the workplace and for the prevention and redressal of complaints of sexual harassment.
Internal Committee (IC) has been set up in the Company headed by senior-level women
employee to deal with sexual harassment complaints, if any.
MRPL conducts regular workshops especially for women employees to bring
awareness about their rights and facilities at workplace and emphasising the provisions of
the Act. Gender sensitisation programmes for the male employees are also conducted
regularly. Newly recruited employees in the Company are made aware of the provisions of
the Act and the measures adopted by the Company to prevent such incidents. There have been
no cases reported to the internal committee for the FY 2023-24. Annual Return pertaining
to Sexual Harassment of Women at workplace is attached at 'Annexure C'.
OFFICIAL LANGUAGE
MRPL is implementing the Of cial Language Policy in letter and spirit
as per the Annual Programme prescribed by the Department of Of cial Language under the
Ministry of Home Affairs, Govt. of India. To propagate and promote Hindi Language among
the employees, Hindi Workshops, Hindi Hasya Kavi Sammelan, Hindi Fortnight, Vishwa Hindi
Diwas and National Level Hindi Seminars were organized on a regular basis. Further,to
promote the usage of the Hindi Language in the Company, an in-house Hindi Journal
"MRPL PRATIBIMB" is published annually. MRPL conducted an All-India Level Hindi
Essay Competition for all Oil PSUs with a significant number of participants. Hindi
Language Trainings were conducted regularly for employees to qualify in Prabodh, Praveen
& Pragya Examinations. MRPL co-sponsored the National Level Hindi conference held by
MoPNG, Govt. of India at Ooty for the employees of Oil PSUs. To connect with employees,
MRPL organised Yakshagana, a local folk art in Hindi Language. MRPL Mumbai and Bengaluru
of ces were inspected by the Committee of Parliament on Of cial Language and the Committee
expressed their contentment and appreciated the way in which the Of cial Language is being
implemented in MRPL. MRPL participated in Town Of cial Language Implementation Committee
(TOLIC) level Hindi competitions and won 10 prizes and stood First at the TOLIC level
competitions. In recognition, your
Company has been awarded the First prize for outstanding performance in
the eld of Of cial Language implementation by TOLIC, Mangaluru.
RIGHT TO INFORMATION ACT, 2005
Your company has put in place an elaborate mechanism to deal with
matters related to the Right to Information Act, 2005. The company has designated one
Nodal Of cer based at Registered Office at Mangalore and one First Appellate Authority
(FAA), one Central Public Information Of cers (CPIO) and Two Assistant Public Information
Of cers (APIOs). RTI manual is hosted on the website of the Company as per Section 4(2) of
the RTI Act. Your company has aligned with the online RTI portal launched by DoPT and all
the applications/appeals received through the portal have been disposed of through the
portal.
The Quarterly Reports / Annual Reports have been submitted through the
online portal of Central Information Commission www.cic.gov.in within the prescribed time
limit. The data on RTI applications received and disposed off by your company is available
online at www.mrpl.co.in/Content/RTI.
SECURITY MEASURES
Security of complex is in accordance with Oil Sector Infrastructure
Protection Plan (OSIPP) and the Security Audit recommendations given by MHA from time to
time.
Physical Protection of the Re nery is entrusted to Central Industrial
Security Force (CISF). They are fully equipped with adequate gadgets and weapons to handle
all kinds of security threats to the Re nery. The Re nery has a state-of-the-art
electronic surveillance system with an integrated CCTV cum Electronic Intrusion Detection
system which is monitored from a Central Command & Control Centre.
Security is on top of the agenda of your Company and to ensure
preparedness, periodic mock drills are conducted. To promote awareness of security issues
among all stakeholders, Security Awareness Weeks are organized periodically. An
up-gradation project of all gates of re nery is being undertaken by building Security
Plaza to include state-of-the- art technologies in automation of access control system,
vehicle checking and Security. The proposed project includes widening of the roads with
lanes for each category of vehicles, parking arrangements and providing all weather
protection to security personnel to perform their duties. With this project, MRPL will
have aesthetic gates forti ed with technology to ensure security of the Re nery.
VIGILANCE FUNCTION
Your company has developed a structured mechanism of vigilance
functions. Its practices are focused towards creation of value to stakeholders. The
practices involve multi-layer checks and balances to improve transparency. Vigilance
awareness and preventive vigilance activities were continuously carried out during the
year. Your company has adopted a complaint handling procedure in accordance with CVC
regulations, in which all complaints received from various sources are documented and
investigated by vigilance. Your company has achieved high compliance level with regard to
e-procurement, e-tender and e-payment. Vigilance function focus on regular study of
systems and procedures for continuous improvement and enhanced ef ciency. Company is
always looking forward to implement Technology based Innovation to ensure greater
transparency and accountability. In line with instructions of CVC, your company had
conducted Vigilance Awareness programs for spreading awareness on Integrity. Awareness
session on Public Procurement, Ethics and Governance, Cyber Hygiene, Role of IO/PO etc.
have also been conducted by nominated of cers of concerned departments. Total 344
employees have attended these sessions. To popularize the PIDPI resolution i.e. Public
Interest Disclosure and Protection of Informer, brochures have been distributed on the
do's & don'ts while ling the complaint under PIDPI, and measures to protect the
identity of complainants etc. Team vigilance conducted interactive class room sessions on
PIDPI Resolution and various topics of Preventive Vigilance at 14 locations across the Re
nery & Aromatic complex, Delhi & Bangalore of ces, CISF and Shell Aviation of ces.
Total 534 employees have attended these awareness sessions.
As a part of Vigilance Awareness Week, number of competitions like
poster making, slogan writing, online quiz, essay writing etc. were conducted for MRPL
employees and dependents, Secondary workforce, CISF employees and their dependents. More
than 500 entries were received for these competitions.
Online Vendor Meet and Dealers Meet covering MRPL's Retail outlet
dealers was organized as a part of Vigilance Awareness week. More than 300 vendors and
almost all operational retail outlet dealers (75 number) participated in the program.
India's National Broadcaster All India Radio (AIR) is still one of the very powerful and
credible media to spread the awareness. Radio Jingles in Hindi and Kannada on PIDPI
Resolution and its importance was broadcasted daily 4 times, on FM band 103.1 All India
Radio Mangalore during Vigilance Awareness Campaign.
Young students are our main focus group to create awareness on
Corruption and its bad effect to the society and nation. Awareness sessions were conducted
at Jawahar Navodaya Vidyalaya (JNV) of Dakshina Kannada & Udupi District. JNVs, under
the Ministry of Human Resource Development, Department of Secondary and Higher Education,
Government of India, are set up by Central Govt for the students of rural areas. JNVs are
established as residential schools to provide good quality modern education including a
strong component of culture inculcation of values, awareness of the environment, adventure
activities and physical education to the talented children predominantly from the rural
areas. Essay and elocution competition on the theme of Vigilance Awareness Week were
conducted by the school. Around 440 students at JNV Dakshina Kannada and an equal number
of students at JNV, Udupi have attended the program. All the students and teachers took
the Integrity pledge. MRPL in association with Manel Srinivasa Nayak Institute of
Management (MSNIM) conducted ve competitions i.e. essay, quiz, elocution, street-play and
poster making. A total of 4000 students participated in various events covering 31
colleges of Dakshina Kannada and Udupi districts. In association with DPS-MRPL, a
walkathon was organized in MRPL
Township on 26 October, 2023, Essay and elocution competitions were
organized for students of DPS School covering all 225 students of 8 , 9 and 10 class.
Short lm on ill-effects of corruption was shown to students of class 3 to 10 covering
approx. 800 students.
During Vigilance Awareness Week, banners were displayed at all the
prominent locations in the Re nery, Retail outlets, Township, schools and colleges. MRPL
of ces at Mumbai, Bangalore and Delhi, OMPL & Shell MRPL during the Vigilance
awareness week. The marketing installation and retail outlets of MRPL also took part
actively in the observance of vigilance awareness week. During the FY 2023-24, total 4
PIDPI complaints were received and investigation reports submitted in all 4 PIDPI
complaints. Further, 17 complaints were received from other sources (Non-PIDPI) out of
which 12 complaints were disposed-off. Investigation is in progress for 5 (Non-PIDPI)
complaints as on 31/03/2024.
Different vigilance awareness activities were designed to cover all
walks of life. Integrity pledge and outreach programs were the prime focus. The social
media platform is used effectively in creating awareness among all the stakeholders.
Chief Vigilance Of cer (CVO) acts as an advisor to the Head of the
Organization in all matters pertaining to Vigilance. More emphasis is being given on
Preventive vigilance initiatives and systemic improvement with the effective use of
technology.
WHISTLE BLOWER POLICY
The Whistle Blower Policy is formulated to provide a vigil mechanism
for Directors and Employees to raise genuine concerns about unethical behaviour, actual or
suspected fraud or violation of the Company's code of conduct or ethics policy. The Policy
provides necessary safeguards for protection of Directors and Employees who avail the
vigil mechanism from reprisals or victimization, for whistle blowing in good faith and to
provide opportunity to Directors and Employees for Direct access to the Chairperson of the
Audit Committee in exceptional cases. The policy is available on the Company's website.
During the year, no complaint was received under Whistle Blower
Policy.
CONSERVATION OF ENERGY, TECHNOLOGY ABSORPTION AND FOREIGN EXCHANGE
EARNINGS & OUTGO
Information required to be disclosed pursuant to Section 134(3)(m) of
the Companies Act, 2013 read with Rule 8(3) of the Companies (Accounts) Rules, 2014 with
respect to Conservation of Energy, Technology Absorption and Foreign Exchange Earnings
& Outgo are furnished in 'Annexure- D' which forms part of this Report.
MANAGERIAL REMUNERATION AND PARTICULARS OF EMPLOYEES
MRPL being a Government Company, is exempted from the provisions of
Section 197(12) of the Companies Act, 2013 and relevant Rules in view of the Noti cation
dated 05/06/2015 issued by Ministry of Corporate Affairs (MCA). The Functional Directors
of the Company are appointed by the Administrative Ministry i.e., MoP&NG within the
framework of DPE guidelines.
ANNUAL RETURN
Pursuant to Section 92(3) read with Section 134(3)(a) of the Companies
Act, 2013 the Annual Return as on 31/03/2024 is available on the Company's website:
https://www.mrpl.co.in/sites/default/
les/Share%20Holders/DRAFT_ANNUAL_RETURN_FY_2023-24.pdf
RELATED PARTY TRANSACTIONS & PARTICULARS OF CONTRACTS/ARRANGEMENTS
WITH RELATED PARTY
All transactions entered with related parties during the FY 2023-24
were on arm's length basis and in ordinary course of business. Further, there were no
material related party transactions during the year with the Promoters, Directors or Key
Managerial Personnel and no related party transactions were made which could have had a
potential conflict with interests of the Company at large. The Company's major related
party transactions are generally with its Holding Company, Joint Venture Company and
associates. All the contracts/arrangements/transactions entered into with related parties
were on arm's length basis, intended to further the Company's interest. The Company has
adopted a Related Party policy and procedure, which is available at Company's website.
The particulars of every contract or arrangements entered into by the
Company with Related Parties referred in Section 188(1) of the Companies Act, 2013, is
attached in the prescribed Form No. AOC 2 as 'Annexure-E'. MCA vide Noti cation
dated 05/06/2015, has exempted the applicability of proviso 1 and 2 of Section 188(1) of
the Companies Act, 2013 for transactions entered into between two Government Companies.
DIRECTORS & KEY MANAGERIAL PERSONNEL
Changes in the Board of Directors and Key Managerial Personnel during
the financial year 2023-24 :
MRPL being a Central Public Sector Enterprise (CPSE), Directors on the
Board of the Company are appointed by the Administrative Ministry i.e., Ministry of
Petroleum and Natural Gas (MoP&NG), Government of India and therefore the provisions
of Section 134(3) of the Companies Act, 2013, regarding policy on Directors' appointment
and remuneration shall not apply in view of the MCA noti cation dated 05/06/2015.
? Shri Vivek Chandrakant Tongaonkar has been appointed as Additional
Director and Director (Finance) on the Board of MRPL w.e.f. 02/05/2023.
? Shri Rohit Mathur (Govt. Nominee) ceased to be a Director w.e.f
16/05/2023 upon withdrawal of nomination by MoP&NG.
? Shri Dheeraj Kumar Ojha (Govt. Nominee) has been appointed as
Additional Director on the Board of MRPL w.e.f 16/05/2023.
? Shri Vivek Chandrakant Tongaonkar (Additional Director and
Director-Finance) has been appointed as Chief Financial Of cer (CFO) in place of Shri
Yogish Nayak S w.e.f. 24/05/2023.
? Shri M Venkatesh (Managing Director and CEO) has vacated the office
of Managing Director w.e.f 01/06/2023 on completion of his tenure of ve years as Managing
Director.
? Shri Sanjay Varma, Director (Re nery) was assigned the additional
charge of Managing Director w.e.f 01/06/2023.
? Shri Sanjay Varma (Director- Re nery and Managing Director-
Additional Charge) was appointed as Chief Executive Of cer (CEO) w.e.f 03/07/2023.
? Shri Asheesh Joshi (Govt. Nominee) ceased to be Director w.e.f.
18/10/2023 upon withdrawal of nomination by MoP&NG.
? Shri Rajinder Kumar (Govt. Nominee) has been appointed as Additional
Director on the Board of MRPL w.e.f 18/10/2023.
? Smt. Pomila Jaspal (ONGC- Nominee) has vacated the office of Director
of MRPL w.e.f. 01/02/2024 on attaining the age of superannuation from the services of ONGC
as Director (Finance).
? Shri Mundkur Shyamprasad Kamath has been appointed as Additional
Director designated as Managing Director on the Board of MRPL w.e.f 28/02/2024.
? Shri Sanjay Varma (Director- Re nery, Managing Director- Additional
Charge, CEO) has vacated the office of Managing Director- Additional Charge and CEO of
MRPL w.e.f. 28/02/2024.
? Shri Pankaj Kumar (ONGC-Nominee) has been appointed as Additional
Director on the Board of MRPL w.e.f. 05/03/2024.
? Shri Mundkur Shyamprasad Kamath (Managing Director) has been
appointed as Chief Executive Of cer (CEO) w.e.f. 22/03/2024.
? Smt. Cheruvally Nivedida Subramanian (Independent Director) has
vacated the office of Director of MRPL w.e.f. 25/03/2024.
? Shri Premachandra Rao G has been appointed as the Company Secretary
and Compliance Of cer w.e.f. 31/10/2023.
? Shri K.B. Shyam Kumar (Company Secretary and Compliance Of cer)
ceased to be the Company Secretary and Compliance Of cer w.e.f. 31/10/2023.
The Board places on record its appreciation for the valuable services
rendered by the outgoing Directors during their respective tenures.
Changes in the Board of Directors after 31/03/2024
? Shri Sanjay Varma (DIN: 05155972), Director (Re nery) vacated the
office of Director of the Company w.e.f. 01/07/2024, on attaining the age of
superannuation from the services of MRPL.
? Shri Mundkur Shyamprasad Kamath (DIN: 10092758), Managing Director,
has been assigned the additional charge of Director (Re nery) for a period of three months
w.e.f. 01/07/2024, or till appointment of regular incumbent to the post, or until further
orders, whichever is the earliest.
? Shri Vivek Chandrakant Tongaonkar (DIN: 10143854), Director (Finance)
& CFO has vacated the office of Director of the Company w.e.f. 02/07/2024, consequent
upon his appointment as Director (Finance) on the Board of ONGC.
? Shri Mundkur Shyamprasad Kamath (DIN: 10092758), Managing Director,
has been assigned the additional charge of Director (Finance) for a period of three months
w.e.f. 02/07/2024, or till appointment of regular
incumbent to the post, or until further orders, whichever is the
earliest.
Changes in the Key Managerial Personnel after 31/03/2024 :
? Shri Vivek Chandrakant Tongaonkar (DIN: 10143854), Director (Finance)
& CFO has vacated the office of Director of the Company w.e.f. 02/07/2024, consequent
upon his appointment as Director (Finance) on the Board of ONGC.
? Shri Yogish Nayak S, GGM I/C - Finance, has been appointed as the
Chief Financial Of cer (CFO) of the company w.e.f. 22/07/2024.
FORMAL ANNUAL EVALUATION
Being a Government Company, policy on directors' appointment and
remuneration is not applicable and also evaluation of their performance is exempted under
the Companies Act, 2013.
DIRECTORS' RESPONSIBILITY STATEMENT
Pursuant to provisions of Section 134 of the Companies Act, 2013, the
Board of Directors of your Company has made the following statement for FY 2023-24: a) In
the preparation of the Annual Financial Statements for the year ended March 31, 2024, the
applicable Ind AS have been followed along with proper explanation relating to material
departures; b) The Directors have selected such accounting policies and applied them
consistently and made judgments and estimates that are reasonable and prudent so as to
give a true and fair view of the state of affairs of the Company at the end of the
financial year and of the profit of the Company for that period; c) The Directors have
taken proper and sufficient care for the maintenance of adequate accounting records in
accordance with the provisions of the Companies Act, 2013 for safeguarding the assets of
the Company and for preventing and detecting fraud and other irregularities; d) The
Directors have prepared the Annual Financial Statements on a going concern basis; e) The
Directors have laid down internal financial controls to be followed by the Company and
that such internal financial controls are adequate and were operating effectively; and f)
The Directors have devised proper systems to ensure compliance with the provisions of all
applicable laws and that such systems are adequate and operating effectively.
NUMBER OF BOARD MEETINGS
The Board of Directors of your Company had eight (8) Meetings during
the FY 2023-24. The maximum interval between any two meetings did not exceed 120 days as
prescribed in the Companies Act, 2013. Details of the Board Meetings held, have been
furnished in the Corporate Governance Report which forms part of this Report.
AUDIT COMMITTEE
The Audit Committee has been constituted as per the terms of reference
prescribed under Section 177 of the Companies Act, 2013, read with Rule 6 of the Companies
(Meetings of the Board and its Powers) Rules, 2014, Regulation 18 of SEBI Listing
Regulation, 2015 and Guidelines on Corporate Governance for Central Public Sector
Enterprise issued by Department of Public Enterprise, Government of India. There have been
no instances where the recommendations of the Audit Committee were not accepted by the
Board of Directors. The details of Audit Committee are disclosed in the Corporate
Governance Report which forms part of this Report.
NOMINATION & REMUNERATION COMMITTEE (NRC)
MRPL being a Central Public Sector Enterprise (CPSE), Directors on the
Board of the Company are appointed by the Administrative Ministry i.e., Ministry of
Petroleum and Natural Gas (MoP&NG), Government of India. Accordingly, the Company has
not adopted any Nomination & Remuneration policy.
Pursuant to Section 178 of the Companies Act, 2013, Regulation 19 of
SEBI (LODR) Regulations, 2015 and DPE guidelines on Corporate Governance for CPSE, your
Company has constituted a Nomination & Remuneration Committee. The details of the
Nomination & Remuneration Committee are disclosed in Corporate Governance Report which
forms part of this report.
MRPL is a 'Schedule-A' Category-1 Miniratna Central Public Sector
Enterprise (CPSE). The appointment, terms, conditions and remuneration of Managing
Director and Functional Directors (Whole-time Directors) are xed by the Department of
Public Enterprises (DPE), Govt. of India.
RISK MANAGEMENT POLICY
In line with the requirements of SEBI (Listing Obligations &
Disclosure Requirements) Regulations, 2015, your Company has developed and rolled out a
comprehensive Enterprise-wide Risk Management (ERM) Policy throughout the organization.
The Audit Committee periodically reviews the risk assessment and mitigation actions in
MRPL.
SIGNIFICANT AND MATERIAL ORDERS PASSED BY THE REGULATORS/COURTS
There are no significant and material orders passed by the Regulators/
Courts/ Tribunals that would impact the going concern status of the Company and its future
operations.
CORPORATE GOVERNANCE
The Companies Act, 2013 and SEBI (LODR) Regulations, 2015 have
strengthened the governance regime in the country. Your Company is in compliance with the
governance requirements provided under the Companies Act, 2013, SEBI Listing Regulations,
2015 and has complied with all the mandatory provisions of Companies Act, 2013 and Rules
made there under, SEBI Listing Regulation, 2015 relating to the Corporate Governance
requirements and mandatory guidelines on Corporate Governance for CPSEs issued by DPE,
Government of India. The Corporate Governance Report for the FY 2023-24 forms part of this
Report.
Pursuant to Schedule V of the SEBI Listing Regulations, 2015, the
compliance certificate from Practicing Company Secretary regarding compliance of
conditions of Corporate Governance also forms part of the Annual Report. The Secretarial
Auditors have made observations on non-availability of requisite number of Independent
Directors on the Board of the Company from 01/04/2023 to 31/03/2024 and Independent Woman
Director from 25/03/2024 due to the resignation of the lone independent woman director on
ground of con icting commitments. The matter for appointment of requisite number of
Independent Directors including Independent Woman Director is being pursued with
MoP&NG and the same is under active consideration of MoP&NG. Accordingly, Company
did not meet composition of Audit Committee, Nomination and Remuneration Committee,
Stakeholders Relationship Committee and Corporate Social Responsibility Committee from
25/03/2024 to 31/03/2024. The committees were reconstituted on 03/04/2024 and your Company
complies with the requirement of composition of the Committees. Pursuant to requirements
of the Companies Act, 2013 and SEBI Listing Regulations, 2015, following policies/codes
have been formulated and available on the Company's website at www.mrpl.co.in.
Policy Details |
Path |
a. Code of Conduct for Board
Members and Senior Management Personnel; |
https://admin.mrpl.co.in/img/UploadedFiles/StatutoryDisclosure/Files/English/7c811
268609547e78fc6a9c74e9368ee.pdf |
b. Whistle Blower Policy; |
https://www.mrpl.co.in/sites/default/
les/Whistle%20Blower%20Policy%20- 27.12.2018_0.pdf |
c. Related Party Transactions
Policy and Procedures; |
https://mrpl.co.in/sites/default/
les/Statutory%20Disclosures/RELATED%20PARTY %20%20TRANSACTION%20POLICY_1482132378.pdf |
d. CSR & SD Policy; |
https://admin.mrpl.co.in/img/UploadedFiles/CSR/Files/English/e73b310d6fd04c0aa5
01b7a59a053713.pdf https://www.mrpl.co.in/sites/default/
les/Material%20subsidiary%20policy- |
e. Material Subsidiary Policy; |
27.12.2018_0.pdf |
f. The Code of Internal
Procedures and Conduct for prohibition of Insider Trading in Dealing with the securities
of MRPL; |
https://admin.mrpl.co.in/img/UploadedFiles/StatutoryDisclosure/Files/English/05b56
a5b278241e9824384499f5ebaef.PDF |
g. Policy on Materiality for
disclosure of events to the Stock Exchanges; |
https://mrpl.co.in/sites/default/
les/Statutory%20Disclosures/Policy%20on%20Discl
osure%20of%20Material%20Events%20and%20Informationfirevised_1482129748.p df |
h. Policy on preservation of Documents; |
https://mrpl.co.in/sites/default/
les/Statutory%20Disclosures/POLICY%20FOR%20 |
|
PRESERVATION%20OF%20DOCUMENTS_1480744935-3_1482130344.pdf |
i. Training Policy for Board
of Directors; |
https://mrpl.co.in/sites/default/
les/Statutory%20Disclosures/TRAINING%20POLIC
Y%20FOR%20BOARD%20OF%20DIRECTORS%281%29_1436511967_1443174 117.pdf |
j. Dividend Distribution
Policy. |
https://mrpl.co.in/sites/default/
les/Statutory%20Disclosures/Dividend%20Distributi on%20Policy_1482132372.pdf |
INVESTOR EDUCATION AND PROTECTION FUND (IEPF)
Pursuant to the applicable provisions of the Companies Act, 2013, read
with the IEPF Authority (Accounting, Audit, Transfer and Refund) Rules, 2016 ("the
IEPF rules"), all unpaid or unclaimed dividends are required to be transferred by the
Company to the IEPF, established by the Government of India, after the completion of seven
years. Further, according to the Rules, the shares on which dividend has not been paid or
claimed by the shareholders for seven consecutive years or more shall also be transferred
to the demat account of the IEPF Authority. During the financial year, no amounts of
unclaimed dividend and corresponding shares were due for transfer to IEPF. The details are
provided in the Shareholder Information Section of this Annual Report and are also
available on the website of the Company www.mrpl.co.in.
BUSINESS RESPONSIBILITY AND SUSTAINABILITY REPORT
SEBI Listing Regulations, 2015 mandated inclusion of Business
Responsibility and Sustainability Report (BRSR) as part of the Annual Report for top 1,000
listed entities based on market capitalization. In compliance with the Regulation, BRSR
for the FY 2023-24 forms part of this Report.
MANAGEMENT DISCUSSION AND ANALYSIS
In terms of Regulation 34 of the SEBI Listing Regulations, 2015, the
Management Discussion and Analysis (MDA) Report for the FY 2023-24 forms part of this
Report.
INTERNAL FINANCIAL CONTROL
Your Company has a well-established and efficient internal financial
control system to ensure an adequate and effective internal control environment that
provides assurance on ef ciency of conducting business including adherence to Company's
policies, safeguarding of its assets, the prevention and detection of frauds and errors,
the accuracy and completeness of accounting records and the timely preparation of reliable
financial information.
The Company has an in-house Internal Audit Department commensurate with
its size of operations. Audit observations are periodically reviewed by the Audit
Committee of the Board and necessary directions are issued whenever required. The
highlights on Internal Control system are disclosed in the Management Discussion Analysis
Report which forms part of this report.
As regards Financial Reporting controls, the internal auditor veri es
the adequacy and effectiveness of controls. Your Company has also obtained a certificate
from the Joint Statutory Auditors under Section 143(3)(i) of the Companies Act, 2013,
towards the existence of adequate Internal Financial control system over Financial
reporting and its operating effectiveness as at 31 March, 2024.
AUDITORS
Joint Statutory Auditors :
M/s YCRJ & Associates, Chartered Accountants, Mangalore and M/s BSJ
& Associates, Chartered Accountants, Kannur were the Joint Statutory Auditors of the
Company for the FY 2023-24. They have audited the Financial Statements for FY 2023-24 and
submitted their report which forms part of this report. There is no qualification in the
Auditors Report on the financial statements of the Company. Notes to the Accounts referred
to in the Auditors Report are self-explanatory and therefore do not call for any comments.
Total statutory audit fees (Standalone & Consolidated) paid to the Joint Statutory
Auditors along with other certi cation fees and reimbursement of expenses for the
financial year 2023-24 was Rs 10.04 Million.
Secretarial Auditors
Your Company engaged M/s Ullas Kumar Melinamogaru & Associates,
Practising Company Secretaries, Mangaluru for conducting Annual Secretarial Audit for FY
2023-24 pursuant to Section 204 of the Companies Act, 2013. M/s Ullas Kumar Melinamogaru
& Associates, Practising Company Secretaries, Mangaluru have issued Secretarial Audit
Report for the FY 2023-24 which forms part of this report as 'Annexure-F'. The
Auditors have made observations on the composition of the Board during FY 2023-24 with
regard to requisite number of Independent Directors and Woman Independent Director on the
Board of the Company and composition of Committees from 25/03/2024 to
31/03/2024. The matter for appointment of requisite number of
Independent Directors including Woman Independent Director on the Board of MRPL is being
pursued with MoP&NG and the same is under active consideration of MoP&NG. Further,
the Committees were reconstituted on 03/04/2024 and the Company has complied with
composition of committee.
Cost Auditors :
Pursuant to Section 148 of the Companies Act, 2013 read with the
Companies (Cost Records and Audit) Amendment Rules, 2014, the Cost Accounts maintained by
the Company for the FY 2023-24 are being audited by Cost Auditors M/s Musib & Co. Cost
Accountant, Mumbai.
COMMENTS OF C&AG ON THE JOINT STATUTORY AUDITORS' REPORT ON THE
CONSOLIDATED AND STANDALONE FINANCIAL STATEMENTS FOR THE FY 2023-24
The Comments of Comptroller & Auditor General of India (C&AG)
forms part of this report and are attached as 'Annexure-G'. You would be pleased to
know that there are no comments from C&AG on the Auditor's Report or on the Financial
Statements for the year 2023-24.
CERTIFICATE OF NON-DISQUALIFICATION OF DIRECTORS
M/s Ullas Kumar Melinamogaru & Associates, Practicing Company
Secretaries (PCS), have issued a certificate of Non-Disquali cation of Directors dated
June 18, 2024 as required under Schedule V, Para C, clause (10)(i) of the Listing
Regulations 2015, confirming that none of the directors on the Board of the Company has
been debarred or disqualified from being appointed or continuing as director of Companies
by the SEBI / Ministry of Corporate Affairs or any such statutory authority.
DECLARATION BY INDEPENDENT DIRECTORS
The Company has received the declaration from Independent Directors
confirming that they met the criteria prescribed under the provisions of Companies Act,
2013 and SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015.
ACKNOWLEDGEMENT
Your Board of Directors wish to thank the shareholders for the
continued con dence reposed on their Company. Your Directors sincerely thank the
Government of India (GoI), Ministry of Petroleum and Natural Gas (MoP&NG), Ministry of
Finance (MoF), Ministry of Corporate Affairs (MCA), Department of Public Enterprises
(DPE), Ministry of Environment, Forest and Climate Change (MoEFCC), Ministry of External
Affairs (MEA), Ministry of Shipping (MoS), Ministry of Home Affairs (MHA), other
Ministries and Departments of the Central Government for their valuable support, guidance
and continued co-operation. Your Directors also place on record their appreciation for the
support from Government of Karnataka.
Your Directors gratefully acknowledge support and direction provided by
the parent Company, Oil and Natural Gas Corporation Limited (ONGC) and the support of
Hindustan Petroleum Corporation Limited (HPCL) as Promoters of the Company. Your Directors
acknowledge the continuous cooperation and support received from New Mangalore Port Trust,
Financial Institutions, Banks and all other stakeholders. Your Directors recognize the
patronage extended by the valued customers for the products of the Company and promise to
provide them the best satisfaction. The Board would like to express its sincere
appreciation for the dedicated efforts made and valuable services rendered by all the
employees collectively and concertedly as a team i.e., "Team MRPL" towards the
Company's achievements during the FY 2023-24.
|
For and on behalf of the Board |
|
Sd/- |
|
(Arun Kumar Singh) |
Place: New Delhi |
Chairman |
Date: 22/07/2024 |