Dear Members,
Your Directors are pleased to present the Thirty Sixth Directors' Report of the Company
for the year ended 31st March, 2024 along with the Audited Statement of
Accounts, Report of Auditors and Comments of the Comptroller and Auditor General of India.
The following financial highlights for the year ended 31st March 2024
briefly encapsulate the performance of your company -
1. FINANCIAL HIGHLIGHTS ('Rs. in crore)
PARTICULARS |
Standalone |
Consolidated |
|
2023-24 |
2022-23 |
2023-24 |
2022-23 |
REVENUE |
|
|
|
|
Revenue from Operations |
2533.59 |
2935.41 |
2579.37 |
2938.35 |
Otherlncome |
299.97 |
363.43 |
297.59 |
344.15 |
Total Revenue |
2833.56 |
3298.84 |
2876.96 |
3282.50 |
EXPENSES |
|
|
|
|
Electricity Purchased for Trading |
39.98 |
0.17 |
39.98 |
0.17 |
Employees' Benefits Expenses |
299.29 |
294.85 |
295.78 |
286.86 |
Finance Cost |
453.84 |
432.23 |
457.28 |
414.88 |
Depreciation and Amortization Expenses |
534.11 |
390.59 |
557.14 |
396.40 |
Other Expenses |
411.11 |
419.24 |
426.57 |
421.15 |
Total Expenses |
1738.33 |
1537.08 |
1776.75 |
1519.46 |
Profit before exceptional items, net movement in regulatory deferral
account balance and tax |
1095.23 |
1761.76 |
1100.21 |
1763.04 |
Exceptional items |
(78.85) |
29.63 |
(78.85) |
29.63 |
Profit before share in net profit of Joint Venture/associates, net
movement in regulatory deferral account balance and tax |
1174.08 |
1732.13 |
1179.06 |
1733.41 |
Share in Profit of Joint Venture/ Associates |
" |
" |
4.19 |
4.25 |
Profit before net movement in regulatory deferral account balance and
tax |
1174.08 |
1732.13 |
1183.85 |
1737.66 |
Tax Expenses: |
|
|
|
|
- Current Tax |
199.50 |
297.00 |
201.75 |
299.09 |
- Tax expense pertaining to earlier years |
2.05 |
15.59 |
2.05 |
15.59 |
- Deferred Tax |
54.42 |
45.79 |
58.30 |
53.38 |
Profit before regulatory deferral account balances |
918.11 |
1373.75 |
921.15 |
1369.60 |
Net movement in regulatory deferral account balances (net off tax) |
(9.71) |
(10.30) |
(971) |
(10.30) |
Profit for the year |
908.40 |
1363.45 |
911.44 |
1359.30 |
Other comprehensive Income/ (Expense) (Net off tax expense) |
(4.51) |
(2.02) |
(4.55) |
(2.03) |
Total Comprehensive Income for the year |
903.89 |
1361.43 |
906.89 |
1357.27 |
2. GENERATION
Gross Energy Generation from various operational plants of the Company, including
subsidiaries during FY2023-24 is as under -
(Million Units (MU)
Plant |
Design Energy |
2023-24 |
2022-23 |
Nathpa Jhakri HPS |
6612 |
6311.804 |
7133.002 |
RampurHPS |
1878.08 |
1778.058 |
1997.454 |
NaitwarMori HPS |
265.5 |
41.515 |
-- |
Hydro Power |
8755.58 |
8131.377 |
9130.456 |
Charanka SPS |
7.6032 |
8.842 |
8.749 |
WadhalSPS |
1.5 |
1.063 |
1.317 |
Parasan SPS |
168.192 |
151.647 |
50.886 |
Gurhah SPS |
159.77 |
35.4296 |
-- |
Gujrai SPS |
106.52 |
9.538 |
-- |
Raghanesda SPS |
252.29 |
3.55 |
-- |
Solar Power |
695.8752 |
210.0696 |
60.952 |
Khirvire WPS |
85.65 |
49.529 |
50.977 |
Sadia WPP |
120.05 |
101.465 |
92.778 |
Wind Power |
205.7 |
150.994 |
143.755 |
Grand Total |
9657.1552 |
8492.4406 |
9335.163 |
Generation Records S Milestones achieved during FY2023-24 include: -
1. NJHPS has achieved highest ever generation of 39.570 MU for the day on 18.07.2023.
2. RHPS has achieved highest ever generation of 10.971 MU for the day on
17.07.2023.
3. Highest ever generation of 50.534 MU achieved from both the Hydro Projects on
18.07.2023.
4. RHPS has achieved highest ever monthly generation of 337.165 MU during August 2023.
5. Highest ever monthly generation of 1590.072 MU recorded from all operational
projects in the month of August 2023.
6. CSPS has achieved highest ever generation of 8.842 MU this year.
3. REVENUE AND PROFITS
The standalone revenue from operation decreased by Rs.'401.82 crore to Rs.'2533.59
crore during the financial year 2023-24 compared to'Rs. 2935.41 crore during the previous
year. The standalone Profit After Tax (PAT) decreased by'Rs.455.05 crore to Rs.'908.40
crore against Rs.'1363.45 crore for the previousyear.
The Subsidiary companies are under construction except for four projects of SJVN Green
Energy Limited (SGEL) of 275 MW and CPTC, (a Joint Venture company) which are in
operation. Consolidation has resulted in increase in profit of consolidated group
byRs.'Rs. 3.04 crore (P.Y. decrease ofRs.'Rs. 4.15 crore) as compared to standalone
financial statements mainly due to profit/income of Subsidiary Companies and inclusion of
proportionate share of profit of CPTC.
4. TRANSFER TO RESERVES
During the year'208.31 crore was transferred to General Reserve of the Company.
5. DIVIDEND
During the year, an interim dividend of Rs.'1.15 per share has been paid in the month
of February 2024. In addition, your Board has recommended
a final dividend of'Rs. 0.65/- per Share. Thus, subject to your approval, a total
dividend of'1.8 per share ('707.37 crore) is proposed to be paid for FY 2023-26
againstRs.'Rs. 1.77 per share ('695.58 crore) paid during the previous year.
6. PROGRESS OF PROJECTS (HYDRO ? THERMAL)
The progress of the projects of the Company and its subsidiaries are as follows: -
A) PROJECTS UNDER CONSTRUCTION
1) Arun-3 HEP (900 MW):
Arun-3 Hydro Electric Project (6x225 MW) is located on River Arun in District
Sankhuwasabha of Eastern Nepal. The Project is run-of-the- river scheme with 6 hours
peaking and is designed to generate 3926 MU energy annually in a 90% dependable year. SJVN
bagged the Project through International Competitive Bidding. Memorandum of Understanding
for the execution of this Project was signed with Government of Nepal (GoN) on 02.03.2008.
The Project was allotted to SJVN on BOOT basis, to be operated by SJVN for 25 years after
the commissioning and thereafter it will be handed overto the Government of Nepal. SJVN
Arun-3 Power Development Company Pvt. Ltd (SAPDC) was registered on 25.06.2013 under
Companies Act of Nepal, 2063 with an aim to plan, promote and execute the Project.
Techno-Economic approval of the Project was accorded by CEA, Government of India (Gol)
on 09.06.2016. Project Development Agreement (PDA) was signed with Investment Board of
Nepal (IBN), GoN on 25.11.2016. As perthe PDA, Project is scheduled to be completed within
5 years reckoned from the financial closure. Financial Closure was achieved on 06.02.2020
for'6,333.68 Crores through consortium of five Indian and two Nepalese banks with SBI as
the lead.
Environment Impact Assessment report of the Project was approved by Ministry of
Science, Technology ? Environment, GoN on 12.08.2015. Private land required forthe
Project has been registered in the name of SAPDC. Lease agreement for diversion of 96.97
ha forest land was signed on 23.08.2017 and for balance 26.25 ha land lease agreement
wassigned on 06.02.2018.
Government of India has accorded investment approval for the Generation component of
the Project at an estimated cost of'Rs. 5,723.72 Crores at May, 2015 price level.
Government of Nepal has issued Generation license on 06.05.2018.
Hon'ble Prime Ministers of India and Nepal jointly laid the foundation stone of this
Project on 11.05.2018. Major works of the Project are divided in four main packages which
have already been awarded and the progress of each of these is discussed as under.
Civil Package- C1 comprising of Civil Works in Dam complex area and 3.7 km Head Race
Tunnel (HRT) was awarded to M/s Jaiprakash Associates Ltd. on 22.09.2017. Work is in
progress at all the fronts. Diversion of River was completed on 01.02.2021. Dam excavation
and concreting is in progress; 99.7% excavation and 26% concreting has been completed.
Construction of Intake structure is in progress. In HRT, 100% heading, 100% benching and
99% overt lining has been completed. Civil Package- C2 comprising of Civil Works in Power
House and 8.1 km Head Race Tunnel (HRT) was awarded on 19.03.2018 to M/s Patel Engineering
Ltd. Allaccess aditsto HRT, PowerHouse, Pressure Shafts, Machine Hall, Transformer Hall
and Butterfly Valve House have been completed. Excavation of Machine Hall, Transformer
Hall, Butterfly Valve House and Collection Gallery have also been completed. Excavation of
Surge Shaft and widening of Pressure Shafts has been completed. Excavation and lining of
HRT is in progress; 99% heading, 72% benching and 67% overt lining has been completed.
Overall, in both C-1 and C-2 packages 99% heading, 81% benching and 63% overt lining of
HRT have been completed.
HM Package- C3 was awarded to M/s OM Metals Infra Projects Ltd. on
11.06.2018. Design and drawings of all major HM components approved. Fabrication of
major components has been completed, supply and erection works are in progress.
EM Package was awarded to M/s BHEL on 30.06.2018. Design and drawings of all major EM
components approved and fabrication and supply of components is in progress. Erection of
DT liner in all units of Machine Hall has been completed and erection of stay ring ?
spiral casing is in progress.
Construction Power: Construction of 33 kV Transmission Line (66 km) for Construction
Power has been completed, line charged and construction power made available at site.
Power Evacuation System of Arun-3 HEP: Power Evacuation system consists of 253 km long
600 kV DC Transmission Line from Diding (Project area) in Nepal through Dhalkebar to
Sitamarhi Substation, India. Nepal portion of 217 km from Arun-3 Power House (Diding) to
Bathnaha (Nepal Border) is being constructed by SAPDC. Government of India accorded
investment approval amounting to'Rs. 1,236.13 Crores at June, 2017 price level on
08.03.2019 for the Nepal portion of Transmission Line to be constructed by SAPDC.
Government of Nepal has issued Transmission license on 12.02.2019.
Indian portion of Transmission Line from Bathnaha-Sitamarhi has been completed by PGCIL
and charging upto border area as anti-theft measure hasalso been done.
MoU has been signed with PGCIL for Project Management consultancy for execution of
Transmission Line stretch in Nepal. Construction work is being carried out through five
packages. Work of two Tower packages, one Substation package is in progress and one
Conductor package has been completed whereas second Conductor package is under
retendering. 60% Tower foundations ? 51% erection of Towers have been completed and
balance work is in progress.
2) Buxar Thermal Power Project (1320 MW):
MOU was signed between SJVN, Bihar State Power Holding Company Limited and Bihar Power
Infrastructure Company for the development of 1320 MW Thermal Power Project at village
Chausa in District Buxar of Bihar on 17.01.2013. SJVN acquired the Project executing
Company Buxar Bijlee Company Private Limited on 06.07.2013. The name of Buxar Bijlee
Company Private Limited was changed to SJVN Thermal Private Limited (STPL), a wholly owned
subsidiary company of SJVN Limited on 17.10.2013.
Investment approval for carrying out pre-construction activities of the Project
amounting to'636.68 Crores was accorded by Gol on 26.05.2015. MoEFfiCC accorded
Environment Clearance on 28.02.2017. 1058.33- acre private land for Project components was
transferred in the name of STPL on 12.12.2017. Consent to Establish (NOC) was granted by
Bihar State Pollution Control Board on 03.09.2019.
CCEA accorded investment approval of Main Plant works on 08.03.2019, amounting to'Rs.
10,639.09 Crores. Foundation stone for the Project was laid by Hon'ble Prime Minister of
India on 09.03.2019.
Main Plant works: Single EPC package was awarded to M/s L?T on 22.06.2019 and
construction activities are in progress. Area grading work in Main Plant area is in
progress, 85% excavation and 86% filling has been completed. Hydro test for Boiler-1 has
been completed ? 73% structure erection for Boiler-1 and 65% structure erection for
Boiler-ll has been completed. Structure erection work and boxing-up of STG-I has been
completed, Structure erection of DM Plant has also been completed and is in progress for
Boiler-1 ? II, ESP-I ? II, STG II and CHP system. Chimney outer shell concreting has
been completed and flue can erection is in progress.
Rail Infrastructure: The DPR for Rail infrastructure was approved by East Central
Railway (ECR), Hazipur on 05.09.2019. For Coal linkage, Amrapali and Magadh coal blocks
have been identified as source by Central Coalfields Ltd. (CCL) and Fuel supply agreement
was signed with Central Coalfields Ltd on 27.07.2021. Work is divided into seven packages
out of which 5 packages (Package-1 to 6 ? Package- 7) have been awarded and tendering
work for Package- 5?6 (which have been clubbed together) is in process. Supply of Rails
(Package-1) and PSC Sleepers (Package-2) has been completed. Railway siding work
(Package-3), Civil works (Package- 6), Signaling ? Transmission work (Package-7) are also
in progress.
Power Evacuation system: Power Purchase Agreement (PPA) for the Project was signed with
Bihar State Electricity Board (later Bihar State
Power Holding Company Limited, BSPHCL) for 85% share of Power at bus bar rate. PPA
(supplementary agreement) signed with BSPHCL on 09.04.2021 for construction of
Transmission Lines for Power evacuation. Grant of Connectivity for Power Transmission from
Buxar TPP was accorded by Bihar State Power Transmission Company Ltd. (BSPTCL) on
11.03.2022. Power evacuation system is divided into 4 Transmission line packages. LoA for
all four lines was issued by BSPTCL and work of all the transmission lines have been
completed and kept in anti-theft charging mode.
3) Luhri HEP STAGE-1 (210 MW):
Luhri Hydro Electric Project Stage-1 is a Run-of-the-River (RoR) scheme with installed
capacity of 210 MW, located on river Satluj, near village Nirath spread over Shimla and
Kullu Districts of Himachal Pradesh. The project will generate 758 MU of electric energy
in a 90% dependable year. MOU for execution of the project was signed with Govt, of
Himachal Pradesh on 25.09.2019.
Investment approval amounting to'Rs. 1810.56 Cr for main works accorded on 20.11.2020
with completion period of 62 months from date of investment approval. Foundation stone
laid by Hon'ble Prime Minister on 27.12.2021. Financial closure of the project has been
achieved on
28.02.2022 and agreement signed with State Bank of India.
Main Civil ? HM works package was awarded on 24.11.2020 to M/s Luhri Hydro Power
Consortium and works at various fronts are in full swing. River has been diverted on
25.06.2022 and 90% dam excavation completed so far. Dam concreting has been started in
parallel with dam excavation. Excavation of power house up to pit for 3 units out 4 has
been completed. Concreting of columns and beams in Service Bay was completed on 10.11.2023
and 1st stage concreting for unit-1 ? 2 is in progress. Permanent steel truss bridge
(84m) to cross river commissioned on 10.09.2023. 93% excavation of Tail race channel
completed. Construction of flood protection wall and TRC walls is also in progress.
EM package was awarded to M/s Voith Hydro Pvt. Ltd. on 16.07.2021. Manufacturing of all
four draft tube liners has been completed and out of which, three DT liners have been
delivered at site. Manufacturing of otherEM Components is in progress.
Power from the project shall be evacuated from 400/ 220 kV common pooling station
proposed to be constructed at Village Ogli by CTU. Accordingly, work for construction of
220 kV transmission line from switchyard to common pooling station (ISTS network) awarded
on
06.07.2022. Detailed survey completed and approval for authorization u/s 164 of
Electricity Act, 2003 accorded by MoP on 01.12.2023. Case for diversion of forest land
submitted on 11.01.2024 accepted by Project screening committee on 22.02.2024 and under
process with State Forest Deptt. Proposal for acquisition of private land is under process
of approval.
4) DHAULASIDH HEP (66 MW):
Dhaulasidh Hydro Electric Project with installed capacity of 66 MW is located on river
Beas, in Hamirpur and Kangra districts of Himachal Pradesh. The Project is a
run-of-the-river scheme and will generate 304 MU of electric energy in a 90% dependable
year. MOU was signed with Govt, of Himachal Pradesh on 25.09.2019.
Investment approval amounting to'Rs. 687.97 Crfor main works accorded on 01.10.2020
with completion period of 54 months from date of commencement of construction works.
Foundation stone laid by Hon'ble Prime Minister on 27.12.2021. Financial closure of the
project was achieved on 18.04.2022 and agreement signed with H.P. State Cooperative bank.
Main Civil ? HM works package was awarded to M/s Rithwik Projects Pvt. Ltd., Hyderabad
on 06.05.2021. River has been diverted on
15.02.2022. Excavation for all the project components i.e. Dam, Power House and Tail
Race Channel has been completed in all respect. Dam concreting is in full swing and 24%
concreting completed. In Power house area, concreting in DT pit, machine hall and service
bay is in progress and 17% completed. Work for construction of flood protection wall is
also in progress.
EM package for main works awarded to M/s Voith Hydro Pvt. Ltd. on
19.01.2022. Erection of draft tube lines has started w.e.f. 11.02.2024. Both the DT
liners have been placed and wielding is in progress. Supply of EoT crane received at site
on 01.12.2023. Fabrication of spiral case and stay ring for unit-1 completed and for
unit-2 is in progress.
Power from the project shall be evacuated from 220 kV network/ substation of HPPTCL
proposed at village Alampur. Payment of Rs. 12.3 Cr. has been deposited with HPPTCL for
construction of 2 bays at proposed switching station. Work for construction of 17.2 km
transmission line from switchyard to HPPTCL network at Alampur awarded on 14.06.2022. Case
for diversion of forest land submitted on
14.06.2023 accepted by Project screening committee on 20.03.2024 and under process with
State Forest Deptt. Signing of agreement with land owners for purchase of Private land is
in progress. Work for tower foundation in private land has already been started.
Further, in addition to 2 main units of 33 MW each, an auxiliary unit of 3.5 MW
capacity to utilize the e-flows is also being planned for which statutory clearance is
under process with GoHP.
5) Sunni Dam HEP (382 MW):
Sunni Dam HEP is a run-of-the-river (RoR) scheme on river Satluj located near Khaira
village in Shimla and Mandi districts of Himachal Pradesh. The Project will generate 1382
MU of energy in a 90% dependable year. Govt, of H.P. re-allotted the project on
"Stand Alone Basis" to SJVN on 29.08.2017. MOU was signed with Govt, of Himachal
Pradesh on 25.09.2019. Ground breaking ceremony of the project was presided over by
Hon'ble Prime Minister on 27.12.2021.
After obtaining all statutory clearances, investment approval amounting to'Rs. 2614.51
Cr accorded by Gol on 12.01.2023 with completion period of 63 months from date of CCEA
approval.
Main Civil ? HM works package was awarded to M/s Rithwik Projects Private Limited on
14.01.2023. Suspension bridge of 113 m span to approach the right bank has been completed
on 31.10.2023. AH the approach roads to the project components have also been completed.
After completion of 510 m long diversion tunnel river diverted on
13.01.2024 within schedule. Excavation for dam abutments in both the banks is in
progress. In the powerhouse area excavation of MAT, adit to powerhouse crown, Adit to Tail
race tunnels and development of bench for potheadyard are in progress.
Construction power for initial requirement has been made available at site, while for
peak requirement, work of 22 kV line from HPSEB's substation at Gumma to dam site through
HPSEB Ltd. is in progress. Construction of permanent steel truss bridge, non-family
accommodation and office building at site is also in progress.
EM package: Tender documents for EM works have been prepared and NIT shall be issued
shortly.
Power from the project shall be evacuated from 400/220 kV ISTS Network /substation
proposed at village Ogli finalised with CTU/CEA. Accordingly, work for construction of
transmission line from powerhouse to common pooling station shall be awarded separately
matching with commissioning of project.
Widening of Sunni Khaira Road up to Ogli substation for transportation of equipment
shall be taken up for which proposal for investment approval has been submitted to CEAon
24.04.2024.
B) PROJECTS UNDER PRE-CONSTRUCTION, SURVEY ? INVESTIGATION STAGES:
1) Lower Arun HEP (669 MW), Nepal:
Lower Arun HEP was allotted to SJVN by Govt, of Nepal on 04.02.2021 with an installed
capacity of 669 MW with an annual generation of 2901 MU. The project is located in the
Sankhuwasabha and Bhojpur districts of Eastern Nepal on river Arun, d/s of existing Arun-3
HEP (900 MW) which is under construction by SAPDC (wholly owned subsidiary of SJVN). The
Project is envisaged to be operated in Tandem with Arun-3 HEP.
Investment approval for Rs.'74.60 Crfor pre-construction activities of the project was
accorded by Gol on 02.03.2022. DPR of the Project has been approved by IBN, GoN on
31.03.2022. Techno-Economic Appraisal of the Project has also been accorded by CEAon
31.10.2022.
Project Development Agreement signed with GoN on 01.06.2023. Investment approval
of'5792.36 Cr. recommended by PIB on 18.05.2023. CCEA approval is in progress. SEIA has
been approved by GoN on
01.11.2023. Tender documents for major works are under finalization.
2) Arun-4 HEP (490 MW), Nepal:
Arun-4 HEP is a run-of-the-river scheme proposed to harness the hydel potential of
river Arun in Nepal with an annual generation of 2758 MU. For the development of the
project in a Joint Venture, a Memorandum of Understanding has been signed between SJVN and
Nepal Electricity Authority (NEA), in the esteemed presence of Hon'ble Prime Ministers of
India S Hon'ble Prime Minister of Nepal at Lumbini, Nepalon16.05.2022.
Project registered with CEA on 08.07.2022. Inception report of the Project has also
been submitted to NEA, GoN on 23.11.2022. Investment approval for pre-construction
activities amounting to'Rs. 41.36 crore has been approved by MoP on 30.12.2022.
Project is in pre-DPR stage. First Consultation meeting held on
04.07.2023. JV Agreement is under finalization with GoN.
3) REOLI-DUGLI HEP (456 MW):
Reoli Dugli HEP is a run-of-the-river project proposed to harness the hydel potential
of river Chenab in the Lahaul-Spiti district of Himachal Pradesh. GoHP allotted the
project to SJVN with capacity of 430 MW on
23.10.2019. Template MoU was signed with GoHP on 06.11.2019. After feasibility studies,
capacity of the project enhanced to 456 MW. Project is in pre- DPR stage. 1st Consultation
Meeting held with CEA on 12.06.2023 and General layout of the project cleared by CWC on
02.02.2024. Geological investigations have been completed and pre- DPR chapters are
under preparation.
Investment approval for pre-construction activities amounting to'Rs. 79.69 Crore has
been approved by MoP on 20.12.2022.
For diversion of forest land, case has been submitted to MoEFSCC on
31.03.2022. Enumeration of trees has been completed and identification of land for
compensatory afforestation is in progress. EIA/EMP report is under finalization and CAT
plan submitted to Forest Department for approval.
4) PURTHI HEP (234 MW):
GoHP allotted the project with capacity of 210 MW in Chenab basin on 09.08.2019 and
Template MoU was signed with GoHP on 25.09.2019. Project is in pre-DPR stage. 1st
consultation meeting was held in CEAon
20.10.2020. After preliminary studies, capacity of project has been enhanced to 234 MW.
Drilling and drift works for geotechnical investigations were awarded, however, same have
been stopped by locals since 04.09.2022. Matter has been taken up with Administration for
resolution of issue and resumption of works.
Investment approval for pre-construction activities amounting to'Rs. 78.25 crore has
been approved by MoP on 14.12.2022.
ToR of the project has been approved by MoEFSCC on 26.03.2021. EIA/ EMP report and CAT
plan are under preparation.
5) BARDANG HEP (166 MW):
Bardang HEP is a R-O-R project to harness the hydel potential of river Chenab in the
Lahaul-Spiti district of Himachal Pradesh. GoHP allotted the project with capacity of 138
MW in Chenab basin on 09.08.2019 and Template MoU signed with GoHP on 25.09.2019.
Project is in pre-DPR stage. 1st consultation meeting held with CEA on
06.11.2020. After preliminary studies, capacity of project has been revised to 166 MW.
Drift works completed on 09.02.2023 and drilling works are in progress. Six pre-DPR
submitted to CEA/CWC out of which five have been cleared.
ToR of the project has been approved by MoEFSCC on 26.03.2021. EIA/ EMP report and CAT
plan are under preparation.
PIB proposal for the investment approval for pre-construction activities amounting
to'Rs. 88.34 Cr submitted to MoP on 27.06.2023 is underapproval.
6) Sach Khas HEP (287 MW):
Sach Khas HEP is a run of the river project proposed to harness the hydel potential of
river Chenab in Chamba district of Himachal Pradesh. GoHP allotted the project with
capacity of 267 MW on 05.01.2021.
Project is in pre-DPRstage. 1st consultation meeting held on 06.01.2022. After
investigation, capacity of project revised to 287 MW. Drilling and drift work for
geotechnical investigations are in progress. 05 pre-DPR chapters have been cleared by
CEA/CWC.
ToR of the project approved by MoEFSCC on 04.03.2022. EIA/EMP report and CAT plan are
under preparation.
PIB proposal for the investment approval for pre-construction activities amounting
to'Rs. 69.67 Cr submitted to MoP on 30.06.2023 is underapproval.
7) Tandi Rashil HEP (268 MW):
Tandi HEP and Rashil HEP were allotted by GoHP with capacity of 104 MW and 130 MW
respectively in Chenab basin on 05.01.2021. After preliminary studies, a single scheme of
268 MW Tandi-Rashil HEP has been proposed and same was approved by GoHP on 02.07.2022.
Project considered byCEAon 25.07.2022.
Topographical survey and geological mapping required for optimization studies could not
be carried out at site due to resistance by locals. Due to delay in investigation works,
proposal for SSI and DPR preparation returned by CEA on 11.09.2023. Matter is being
followed up with Administration to resolve the issues for resumption of works.
8) Tindi SHEP (4.4 MW):
Tindi hydroelectric project is a run-of-the-river scheme located on Harsar Nala, a
tributary of river Chandrabhaga near village Tindi, in District Lahaul S Spiti of Himachal
Pradesh. DPR of the project submitted to GoHP/Himurja on 31.08.2022 for approval.
9) Hydro power projects in Arunachal Pradesh:
i) Etalin HEP (3097 MW):
Project allotted by GoAP on 21.07.2023 and MoA signed with GoAP on
12.08.2023. Transfer of concurrence and extension of validity of DPR upto 31.12.2024
accorded by CEA on 09.11.2023. Revised hydrology approved by CWC on 05.02.2024 and power
potential studies are under examination in CEA.
Revised case for diversion of 1175 ha forest land submitted on
15.02.2024. Compensatory Afforestation land is being identified by State Forest
Department. EC has been recommended on 31.01.2017, however, EC letter will be issued by
MoEFSCC after grant of Forest Clearance Stage-1.
For Land Acquisition, Rs. 1175 Ha. land has been identified and compensation amount
determined.
Cost to Completion submitted to CEA on 12.02.2024 for approval. Draft PIB Memo for
investment approval of main works submitted to MoP on
01.03.2024 is under examination.
Tender documents for major works are under preparation.
ii) Attunli HEP (680MW):
Project allotted by GoAP on 21.07.2023 and MoA signed with GoAP on
12.08.2023. Transfer of concurrence and extension of validity of DPR upto 31.12.2025
accorded by CEA on 09.11.2023. Revised hydrology approved by CWC on 10.04.2024.
FC case for diversion of 261.53 ha forest land submitted on 15.02.2024. Identification
of Compensatory Afforestation land and tree enumeration work is in progress. TOR
recommended for EC on
09.02.2024 and EIA/EMP is under finalization with consultant.
Forland Acquisition, 261.53 Ha. land has been identified.
Cost to Completion submitted to CEA on 18.01.2024 for approval.
iii) Emini (500 MW), Amulin (420 MW) and Mihumdon (400 MW) HEPs: Projects allotted by
GoAP on 21.07.2023 and MoA signed with GoAP on
12.08.2023. To ascertain the commercial viability, NIT for consultancy services for
preparation of PFRs issued on 04.04.2024. Process for the other statutory clearances shall
be initiated after ascertaining commercial viability of the projects.
iv) Oiher projects:
MoP has indicated 9 more projects totaling 1507 MW in Dibang basin to SJVN on
11.05.2023 of the projects. Commercial viability of the projects is being ascertained
before signing of Molls with State Govt.
10) Luhri HEP STAGE-2 (228 MW):
Luhri HEP Stage-2 is a Run-of-the-River (RoR) scheme proposed on river Satluj near
village Nanj, in Shimla, Kullu and Mandi districts of Himachal Pradesh. Govt, of H.P.
re-allotted the project on "Stand Alone Basis to SJVN on 29.08.2017. Investment
approval for carrying out construction activities amounting to'Rs. 72.478 Cr has been
approved by Gol on 16.03.2018. MOU was signed with GoHP on 25.09.2019.
The project is in pre-DPR stage. After preliminary studies, a scheme in tandem
operation with upstream Luhri HEP Stage-1 has been identified with an installed capacity
of 228 MW and layout of the scheme submitted to CWC/CEA.
Observation raised by CWC on change in allotted domain of the project has been taken up
with DoE, GoHP time and again. Due to delay in domain allotment by GoHP, proposal for SSI
and DPR preparation returned by CEA on 11.09.2023. Matter for approval of revised domain
is being followed up with GoHP regularly.
11) DEVSARI HEP (194 MW):
Devsari HEP is a Run-of-the-River (RoR) scheme located on river Pinder, a major
tributary of river Alaknanda in district Chamoli of Uttarakhand. DPR with 252 MW installed
capacity was concurred by CEAon 07.08.2012.
As per revised e-flows notified by MoJS, Gol on 09.10.2018, DPR of the project is being
revised and capacity reworked from 252 MW to 194 MW. Forest Clearance Stage-1 was accorded
by MOEFSCC on 26.02.2018 with conditions. Environmental Clearance was recommended by EAC
on 27.03.2018 subject to certain conditions applicable for FC stage-1. For acquisition of
private land, award has been issued by DM, Chamoli on 10.07.2019 and compensation amount
deposited with District Administration.
However, all SSI works required for revision of DPR are pending and statutory
clearances on hold in compliance with Ministry of Power letter dated 06.07.2021 due to
stay ordered by Hon'ble Supreme Court of India for development of HEPs in Uttarakhand.
Matter has been taken upwith MoP/MoJSand PMO toconsiderthe projectfordevelopment.
12) JAKHOL SANKRI HEP (44 MW):
JakholSankri HEP with proposed installed capacity of 44 MW is located on River Supin, a
tributary of River Tons in Uttarkashi District of Uttarakhand. The project is designed as
run-of-the-river project and will generate 166 MU of annual energy. Investment approval
for carrying out pre-construction activities has been accorded by Gol at an estimated cost
of'84.50 Cr. on 15.09.2017.
TEA of DPR issued by GoUk on 03.06.2019. Environmental clearance was recommended by RO,
MOEFSCC, Dehradun on 26.12.2019. EAC meeting in MoEFSCC, Delhi held on 17.10.2023;
observations raised are being attended. For private land acquisition, RSR plan approved by
Commissioner, Garhwalon 15.06.2021 and land compensation is under finalization. Project
cost/tariff is on higher side. Optimisation studies to make the project commercially
viable are underfinalisation.
13) JANGI THOPAN POWER HEP (804 MW):
Jangi Thopan Powari HEP is located on river Satluj in Distt. Kinnaur of Himachal
Pradesh. The project with installed capacity of 780 MW was allotted by GoHP on 24.11.2018
and MoU signed on 25.09.2019. Investment approval for carrying out pre-construction
activities of project has been accorded by Gol at an estimated cost of'Rs. 93.24 Cr. on
20.05.2021. After preliminary studies, capacity of project has been proposed to be
enhancedto 804 MW.
Drilling and drift works were awarded on 26.02.2021 and 17.03.2021 respectively.
However, SSI works were stopped by locals w.e.f.
04.04.2021. Communication plan to persuade locals was prepared and implemented in the
project affected areas for sensitization of locals about project benefits. Simultaneously,
alternative project scheme/ layout proposing modifications such as possibility of Dam-Toe
Power House, use of TBM for HRT etc. are being explored to address the concerns of local
public.
However, GoHP on 29.12.2023 has now cancelled the allotment of the project to SJVN.
Matter has been taken up with GoHP to withdraw the Cancellation Order. MoP has also
requested GoHP to revoke the decision of termination of MoU.
14) Pumped Storage Projects:
i) Jalvara (2220 MW):
The capacity of Jalvara PSP located in the states of Maharashtra S Karnataka revised to
2220 MW with generation of 4619 MU of annual design energy against allotted capacity of
2000 MW. PFR has been prepared and submitted to CEA on 28.12.2022. Upper reservoir of the
project falls in Karnataka S lower reservoir falls in Maharashtra. Allotment of the
project is under discussion with the respective state governments.
ii) Darzo Lui PSP (2400 MW):
PFR of the project located in Mizoram submitted to CEA on 05.06.2023. Allotment of the
project is under discussion with the Govt, of Mizoram. NOC to carry out investigations for
DPR preparation issued by Govt, of Mizoram on 26.04.2024.
iii) PSPs in Bihar:
Four PSPs have been identified in Bihar. Consultancy works for preparation of PFR of
most suitable PSP awarded to M/s WAPCOS Ltd. on 17.08.2023. Hathiadah-Durgawati PSP with
capacity of 1000 MW is selected as best suitable PSP for preparation of Feasibility
Report.
iv) PSPs in Madhya Pradesh:
SJVN participated in the bidding process for 2 PSPs viz. Omkareshwar PSP (1200 MW) and
Ambapani PSP (740 MW) in the RFP called by Rewa Ultra Mega Solar Ltd. Bidding process
issubjudice.
v) PSPs in Maharashtra:
PSP sites at Varasgaon (1200 MW), Panshet (1600 MW) and Kodali (220 MW) will be
developed through SPV/JV with Mahagenco. Mahagenco Board has accorded approval for
formation of JV with SJVN on
24.02.2024. PFRs shall be prepared to ascertain commercial viability.
vi) PSPs identified in Himachal Pradesh:
PFRs of Sunni PSP (645 MW), Dhurmu PSP (400 MW) and Sadda PSP (180 MW) in Himachal
Pradesh have been prepared. However, tariff of the projects is very high.
7. PROGRESS OF PROJECTS (RENEWABLE ENERGY)
SJVN is fast expanding its foot prints in the field of Renewables and aims for adding 1
to 1.5 GW Capacity on annual basis. In order to give a thrust to its renewable endeavors,
SJVN has registered a Wholly owned Subsidiary namely "SJVN Green Energy Limited"
on 30.03.2022.
The Renewable portfolio at present stands at 7.24 GW which includes Operational (404.5
MW), Construction (2048 MW), Pre-Construction (4790 MW).
A. PROJECTS UNDER OPERATION (404.5 MW)
i) Charanka Solar Power Station
ii) Khirwire Wind Power Station
iii) Sadla Wind Power Project
iv) Parasan Solar Power Station
Parasan Solar Power Station of 75 MW capacity was bagged through Tariff Based
Competitive Bidding conducted by Uttar Pradesh New S Renewable Energy Development Agency
(UPNEDA) on 17.05.2021 and PPA was signed with UPPCLat a tariff of INR 2.68 per unit. The
1st year design energy for the project is 168.34 MU with a CUF 25.6%. The project was
commissioned and came into operation on 22.11.2022. Total energy generation from the plant
for FY 2023-24 was 151.647 MU.
v) Gurhah Solar Power Station
Gurhah Solar Power Station of 75 MW capacity was bagged through
Tariff Based Competitive Bidding conducted by Uttar Pradesh New S Renewable Energy
Development Agency (UPNEDA) on 05.01.2022 and PPA was signed with UPPCL at a tariff of INR
2.98 per unit. The 1st year design energy for the project is 159.77 MU with a CUF 24.3%.
The project was commissioned and came into operation on 29.12.2023. Total energy
generation from the plant for FY2023-24 was 41.033 MU.
vi) Gujrai Solar Power Station
Gujrai Solar Power Station of 50 MW capacity was bagged through Tariff Based
Competitive Bidding conducted by Uttar Pradesh New S Renewable Energy Development Agency
(UPNEDA) on 05.01.2022 and PPA was signed with UPPCL at a tariff of INR 2.98 per unit. The
1st year design energy for the project is 106.52 MU with a CUF 24.3%. The project was
commissioned and came into operation on 22.02.2024. Total energy generation from the plant
for FY2023-24 was 11.35 MU.
vii) Raghanesda Solar Power Station
Raghanesda Solar Power Station of 100 MW capacity was bagged through Tariff Based
Competitive Bidding conducted by Gujarat Urja Vikas Nigam Limited (GUVNL) on 11.10.2021
and PPA was signed with GUVNL at a tariff of INR 2.64 per unit. The 1st year design energy
for the project is 252.29 MU with a CUF 28.8%. The project was commissioned on 29.02.2024
and commercial operation date of project is 02.04.2024. Total energy generation from the
plant was 3.55 MU for FY 2023-24.
B. PROJECTS UNDER CONSTRUCTION (2048 MW)
Presently, SJVN Ltd has twelve (12) solar power projects under construction with total
capacity of 2048 MW located in Gujarat, Rajasthan, Madhya Pradesh, Punjab, Bihar and
Assam. The details of the projects are listed below:
i) 70 MW Bagodara Solar Power Project
Bagodara Solar Power Project of 70 MW capacity was bagged through Tariff Based
Competitive Bidding conducted by Gujarat Urja Vikas Nigam Limited on 26.03.2021. PPA was
signed with GUVNL at tariff of INR 2.21 per unit. The EPC was awarded to M/s Svaryu Energy
Limited (Formerly known as Refex Energy Limited). The project is in construction stage and
is likely to be commissioned by December 2024.
ii) 1000 MW Bikaner Solar Power Project under CPSU Scheme
SJVN during the month of September 2021 bagged 1000 MW Solar Project at a tariff of INR
2.57/Unit (maximum) and a Viability Gap Funding (VGF) of 44.72 Lakh/MWthrough competitive
bidding underthe CPSU Scheme. The Power Utilisation Agreement (PUA) has been signed with
Uttarakhand Power Corporation Limited (UPCL) for 200 MW, Jammu and Kashmir Power
Corporation Limited (JKPCL) for 300 MW and Rajasthan Urja Vikas and IT Services Limited
(RUVITL) for 500 MW. The EPC was awarded to M/s TATA Power Solar System Limited. The
project is in construction stage and 1st Block of 250 MW is likely to be commissioned
September 24 and full capacity is likely to commissioned by March-25.
iii) 100 MW Punjab Solar Project
SJVN through Tariff Based Competitive Bidding conducted by Punjab State Power
Corporation Limited (PSPCL) bagged 100 MWSolar Project in Punjab. PPA has been signed with
PSPCL at a tariff of INR 2.65/Unit. Award has been placed upon M/s BVG India Limited on
21.03.2023. Project is to be commissioned by December, 2024.
iv) 15 MW Nangal FSP
SJVN through Tariff Based Competitive Bidding conducted by Solar Energy Corporation
Limited (SECI) bagged 15 MW Floating Solar Project. PPA has been signed with BBMB at a
tariff of INR 3.26/Unit. Award has been placed to M/s Hartek Solar Pvt. Limited on
24.03.2023 for construction of 15 MW floating SPP in the catchment area of BBMB DAM at
Nangal. Project is likely to commissioned by December, 2024.
v) 90 MW Omkareshwar Floating Solar Project
SJVN through Open Competitive Bidding conducted by Rewa Ultra Mega Solar Ltd. (RUMSL)
bagged 90 MW Floating Solar Project at Indira Dam, Omkareshwar, Madhya Pradesh. PPA signed
with MPPMCL on 04.08.2022 at a tariff of INR 3.26/Unit. Award has been placed to M/s
Larsen SToubro Limited on 29.11.2022. Project isto be commissioned by August, 2024.
vi) 100 MW Bhuj SPP (GUVNL Phase -XIII)
SJVN through Open Competitive Bidding conducted by Gujarat Urja Vikas Nigam Limited
(GUVNL) bagged 100 MW Solar Power Project on
16.04.2022. PPA was signed with GUVNL at tariff of INR 2.29 per unit. The Balance of
Works was awarded to M/s Solar World Energy Solution Private Limited on 28.11.2023. The
project is in construction stage and is likely to be commissioned by March 2025.
vii) 260 MW Gujarat SPP (Phase -XIV)
SJVN through Open Competitive Bidding conducted by Gujarat Urja Vikas Nigam Limited
(GUVNL) bagged 260 MW Solar Power Project on
15.07.2022. PPA was signed with GUVNL at tariff of INR 2.3031 per unit. The Balance of
Works was awarded to M/s Solar World Energy Solution Private Limited on 28.11.2023. The
project is in construction stage and is likely to be commissioned by March 2025.
viii) 200 MW Khavda SPP (Phase -XVII)
SJVN through Open Competitive Bidding conducted by Gujarat Urja Vikas Nigam Limited
(GUVNL) bagged 200 MW Solar Power Project on
16.05.2023. PPA was signed with GUVNL at tariff of INR 2.88 per unit. The Balance of
Works was awarded to M/s Rays Power Infra Private Limited on 08.01.2024. The project is in
construction stage and is likely to be commissioned by March 2025.
ix) 75 MW Jamui Solar Power Project (Phase -I)
SJVN through Open Competitive Bidding conducted by Bihar Renewable Energy Development
Agency bagged 200 MW Solar Power Project on
28.01.2022. PPA was signed with BREDA at tariff of INR 3.11 per unit. The Balance of
Works for 75 MW was awarded to M/s Hartek Power Private Limited on 08.01.2024. The project
is in construction stage and is likely to be commissioned by January 2025.
x) 18 MW BBMB Solar Project
SJVN through Open Competitive Bidding conducted by Punjab Energy Development Agency
(PEDA) bagged 18 MW Solar Power Project on
05.05.2023. PPA was signed with BBMB at tariff of INR 2.63 per unit. The EPC for 18 MW
was awarded to M/s Ganesh Green Bharat Limited on
20.02.2024. The project is in construction stage and is likely to be commissioned by
March 2025.
xi) 50 MW Sonitpur SPP (Assam)
SJVN through Open Competitive Bidding conducted by Assam Power Distribution Company
Limited (APDCL) bagged 50 MW Solar Power Project on 28.08.2023. PPA was signed with APDCL
at tariff of INR 3.92 per unit. The EPC for 50 MW was awarded to M/s Solar World Energy
Solution Private Limited on 20.03.2024. The project is in construction stage and is likely
to be commissioned by May 2025.
xii) 70 MW Dhubri SPP (Assam)
SJVN through Open Competitive Bidding conducted by Assam Power Distribution Company
Limited (APDCL) bagged 70 MW Solar Power Project on 28.08.2023. PPA was signed with APDCL
at tariff of INR 3.92 per unit. The EPC for 70 MW was awarded to M/s Rays Power Infra
Private Limited on 20.02.2024. The project is in construction stage and is likely to be
commissioned by May 2025.
C. PROJECTS UNDER PRE-CONSTRUCTION STAGE (4790 MW)
Following solar projects are under pre construction stage:
Sr. No. Project Name |
State |
Capacity |
1. Jamui Solar Project (Phase -II) |
Bihar |
50 MW |
2. Banka Solar Project |
Bihar |
75 MW |
3. MSEDCL Phase - VII |
Maharashtra |
200 MW |
4. MSEDCL Phase-IX |
Maharashtra |
200 MW |
5. SECI Wind Phase-XIII |
Anywhere in India |
100 MW |
6. RUVNL |
Rajasthan |
100 MW |
7. GUVNL Phase-V(WindPP) |
Gujarat |
100 MW |
8. SECI Wind Phase-XIV |
Anywhere in India |
200 MW |
9. PSPCL ET3 |
Anywhere in India |
1000 MW |
10. PSPCL ET4 |
Punjab |
200 MW |
11. APDCL |
Assam |
200 MW |
12. GUVNL Phase -XXII |
Anywhere in India |
200 MW |
13. GUVNL PhaseXXI (Khavda) |
Gujarat |
500 MW |
14. GUVNL PhaseXXIII (Khavda) |
Gujarat |
200 MW |
15. MSEDCL(PMKUSUM) |
Maharashtra |
1352 MW |
16. HP Solar Projects |
HP |
113 MW |
Total (16 No. of Projects) |
|
4790 MW |
8. BUSINESS DEVELOPMENT PLAN AND FUTURE BUSINESS STRATEGY
SJVN has set for itself ambitious capacity addition targets of 25000 MW by the year
2030 and 50000 MW by 2040. With the increasing renewable energy (Solar, Wind, Hybrid)
penetration in the grid day by day, SJVN since long has been making all the efforts for
allotment of Hydro Power Projects/Pumped hydro Storage Projects Pan India and in
neighboring counties as well.
A. Business opportunities in Hydro and PSPs
1. Hydro-Electric Projects:
As per the Reassessment Study carried out by the Central Electricity Authority (CEA)
during 1978-1987, the assessed hydro power potential in the country is about 145320 MW
(for projects with capacity above 25 MW). Presently, 42104.6 MW (29%) out of 145320 MW has
been developed and 15023.5 MW (10.3%) is under construction. As compared to wind and
solar, hydro power is of much greater value due to several reasons including black start,
regulations and frequency response, spinning reserve, non-spinning reserve and voltage
reserve.
The north-eastern states of India, collectively hold a significant portion of India's
hydroelectric potential. Specially, Arunachal Pradesh, often referred to as the
"Powerhouse of the Northeast" due to its immense hydroelectric potential around
50,000 megawatts (MW) of hydroelectric power, primarily driven bythe Brahmaputra and its
tributaries.
2. Pumped Hydro Storage Projects:
MoP (Gol) indication of identified 55 No's PSPs sites of cumulative capacity of 73,240
MW to seven CPSUs i.e., NHPC; NTPC; SJVN; THDC; NEEPCO; DVC and BBMB MW in various states.
As per CEA report, currently 43 Pumped Hydro Storage (PSPs) are under survey
investigation with an aggregate installed capacity of 55,085 MW. These included projects
situated in states like Uttarakhand, Tamil Nadu, Andhra Pradesh and Maharashtra.
Pumped storage plants can generate power continuously for long duration, depending on
the storage capacity of the reservoir. These should be considered as RE projects and not
like the conventional hydro power projects. These plants have a lifetime of over 40 years,
and they operate with an efficiency of 70-80 per cent. Further, as compared to the
conventional thermal generator, PSP has the ability of quick start- stop as well as higher
ramping capability.
PSPs can cater to the seasonal mismatches in RE and load due to its bulk storage
capability. PSPs having minimal environmental impact, minimum RSRand,
lowercost.shorterconstruction period.
Business Strategy:
I.) To acquire HEPs/PSPs through allotment/MoU with state govts.
ii. ) To acquire HEPs/PSPs through open market competitive bidding
iii. ) To acquire stalled stressed HEPs/PSPs from previous developers ort hrough NCLT.
iv. ) To acquire and execute HEPs/PSPs by forming JVCs with state
bodies/Boards/corporations and private players in PPE mode.
In line with the business strategy, SJVN has signed MoU with GoAP for execution of Five
HEPs (5097 MW) in Dibang river basin. Further, nine projects (cumulative capacity of 1507
MW) are under pipeline forsigning MoU. SJVN has signed MoU with MAHAGENCO (Govt, of
Maharashtra undertaking) for development of 5000 MW renewable energy projects i/c
HEPs/PSPs in state of Maharashtra. SJVN has also signed MoU with Navayga Engineering
Company ltd for development of OJU HEP (1878 MW) on PPE mode in Arunachal Pradesh.
B. RE-RTC Power for different consumers with different demand profile in different part
of country.
RE-RTC (Renewable Energy-Round the Clock) is a form of supply that combine storage
system such as battery energy Storage system or PSP with Solar, Wind or Hydro to meet a
demand at a desired availability and cost. Round the Clock (RTC) supply has gained
prominence in recent years due to various benefit it provides; Reliable supply of Power,
Combination of Solar and wind with complimentary profile, reducing the Green Housing Gas
(GHG) emission etc. The study explores combination of RE sources for RE- RTC to meet the
requirement of different consumers with different demand profile. With Reduction of Cost
of Storage technologies, it is expected that RE-RTC will become cost competitive with
other standalone renewable technologies and the dependence on fossil fuel sources may be
reduced in the future. Overall, achieving RE- RTC is a critical goal for reducing
greenhouse gas emissions and ensuring a sustainable energy future.
Business Strategy:
SJVN Ltd. has entered in all fields of Renewable Energy (RE) generation i.e. Hydro,
Solar and Wind. Therefore, SJVN is capable for supply of RE-RTC for different consumers
with their demand profile based on the market practices.
C. Plan for a joint venture for captive power plants for Refineries, Railways etc.
The shift towards self-reliance in energy is gaining momentum in India. One significant
stride in this direction is the adoption of captive power generation. These power plants,
especially prevalent in industrial hubs like Surat, are not just a symbol of energy
independence but also a testament to innovation and sustainability. Captive power plants
(CPPs) represent a paradigm shift in India's approach to energy generation. By allowing
industries to produce their own electricity, CPPs provide a reliable and cost-effective
alternative to grid power, especially in areas with less supply.
a) The Growth Trend: The captive power generation market in India is experiencing
significant growth, with projections showing an increase by 31.05 GW from 2021 to 2026.
This expansion, at a CAGR of 6.63%, indicates a strong move towards self-reliance in power
generation by industries.
b) Financial Benefits and Incentives
The financial logic behind adopting CPPs is compelling. In areas like Surat, high
industrial power costs drive the adoption of captive power solutions.
Cost-Effectiveness: By generating their own power, industries can substantially reduce
their energy expenses.
Sale of Excess Power: CPPs not only provide energy security but also offer the
potential for revenue generation. Industries can sell surplus power to open-access trading
markets, turning an operational necessity into a financial asset.
Business Strategy:
i) To sign MoU with State Governments for various industrial units.
ii) To sign MoU with Railway/OilCompanies/Private players
iii) By forming JVCs with state bodies/Boards/corporations/PSUs and private players for
installation of plants
9. POWER TRADING BUSINESS AND LICENSE
SJVN ventured into Power Trading Business as part of its business expansion and
diversification plan and has obtained Category-1 license from CERC in January, 2022 for
interstate trading of electricity. Power Trading Business of the company endeavors to
provide efficient and affordable power to its clients. SJVN is registered at DEEP
(Discover of Efficient Electricity Price) e-bidding portal and has trader membership in
Indian Energy Exchange (IEX). SJVN has also developed customized Power Trading Software
ISET (Integrated Solution for Energy Trading) through PWC to automate its power trading
activities. During the
Financial Year 2023-24, Company had traded energy of 78.38 MUs with turnoverof D40.21
Crore.
10. SJVNAS RENEWABLE ENERGY IMPLEMENTING AGENCY (REIA)
In line with the Government of India's ambitious target to achieve 50% of the country's
electricity demands from renewable energy sources by 2030 and reach net zero emissions by
2070, SJVN Limited has been designated as Renewable Energy Implementing Agency (REIA) by
the Ministry of New and Renewable Energy (MNRE) on 24th April, 2023.
As REIA, SJVN has been entrusted with the responsibility to select Renewable Energy
Power Developers (RPDs) through Tendering Process, for setting up and supply of various
forms of renewable energy, including solar power, wind power, wind-solar hybrid power, and
firm and dispatchable RE power. The selection process is conducted through a tariff-based
competitive bidding procedure.
During the Financial Year 2023-24, SJVN was given a target of tendering renewable
energy projects with an aggregate capacity of 10 GW as an intermediary procurer. In
compliance with this target, SJVN floated tenders for the selection of developers for a
cumulative capacity of 9900 MW, out of which letters of awards were issued to successful
developers for a cumulative capacity of 5368 MW. Whereas, a cumulative capacity of 3900 MW
is under the tendering process and is expected to be concluded by June, 2024.
SJVN has also signed Power Sale Agreements (PSAs) with DISCOMsfor the full awarded
capacity of 2368 MW FDRE power, and PSAs for the remaining awarded capacity of 3000 MW are
expected to be signed shortly. During the Financial Year 2024-25, SJVN intends to issue
tenders for the selection of renewable energy power developers for setting up and supply
of various forms of renewable energy with a cumulative capacity of 10 GW.
11. SJVN AS NODAL AGENCY FOR ROOF TOP SOLAR (RTS) SCHEME
SJVN has also been entrusted with the responsibility of functioning as Nodal Agency for
the implementation of the Roof Top Solar (RTS) Scheme on government buildings of eighteen
ministries of the Government of India. Additionally, SJVN has been directed to function as
a Nodal Agencyforthe implementation of solar systems on the roof tops of majority
residential buildings and government buildings in the states of Flimachal Pradesh, Punjab
and Arunachal Pradesh.
With these initiatives, SJVN is committed to playing a significant role in India's
transition to a low-carbon economy and achieving the country's ambitious renewable energy
targets.
12. SUBSIDIARIES AND JOINT VENTURE COMPANIES A) SUBSIDIARY COMPANIES:
Company has four wholly owned subsidiary companies as on
31.03.2024. The details of the subsidiaries are as under
1. SJVN Thermal Pvi. Ltd.
SJVN Thermal Pvt. Ltd (STPL) (earlier, Buxar Bijlee Company Private Limited) has been
acquired as 100% subsidiary company of SJVN Ltd on 04.07.2013. The Company has taken up
the development of 1320 MW Coal-based Thermal Power Project located near village Chausa in
District Buxar of Bihar.
2. SJVN Arun-3 Power Development Company Pvt. Ltd.
SJVN Arun-3 Power Development Company Pvt. Ltd. (SAPDC) was incorporated in Nepal as a
wholly owned subsidiary company of SJVN Ltd on 25.04.2013. The company has been formed to
execute the 900 MW Arun-3 Hydro Electric Project in Nepal. This project is situated on
river Arun in Sankhuwasabha District of Nepal.
3. SJVN Green Energy Limited (SGEL)
SJVN Green Energy Limited (SGEL) has been incorporated as a wholly owned subsidiary
company of SJVN Ltd on 30.03.2022 with its registered office at Shimla, Himachal Pradesh.
SGEL shall work in the verticals of power generation from renewable sources such as Solar,
Wind S Hybrid Projects, Battery Energy Storage system, Biomass, small Hydro and Green
Hydrogen based business ventures.
4. SJVN Lower Arun Power Development Company Private Limited (SLAPDC)
SJVN Lower Arun Power Development Company Private Limited (SLAPDC) was incorporated in
Nepal as a wholly owned subsidiary company of SJVN Ltd on 26.05.2023. The company has been
formed to execute the 669 MW Lower Arun Hydro Electric Project in Nepal.
B) JOINT VENTURES:
1. Cross Border Power Transmission Company Limited
Cross Border Power Transmission Company Limited (CPTC) is a joint venture of SJVN Ltd.
with ILSFS Energy Development Company Ltd. (IEDCL), Power Grid Corporation of India Ltd.
(PGCIL) and Nepal Electricity Authority (NEA) for implementation of Indian portion of the
transmission line from Nepal. Equity contributions by SJVN, PGCIL, IEDCL S NEA are 26%,
26%, 38% S10% respectively in the Joint Venture Company.
2. SGEL Assam Renewable Energy Limited
SJVN Green Energy Limited has incorporated a Joint Venture Company with Assam Power
Distribution Company Limited named "SGEL Assam Renewable Energy Limited" on
18.04.2024. SJVN Green Energy Limited holds 51% equity in SGEL Assam Renewable Energy
Limited.
Status of JV between SJVN and MAHAGENCO: Govt, of India has accorded approval for the
formation of JV for the development of 5000 MW RE Projects in the state of Maharashtra
with Maharashtra State Power Generation Company (MAHAGENCO) with equity participation of
51% on 30.01.2024. The formation of a Joint Venture company is under process.
13. ENVIRONMENT
SJVN is aware of its obligation to conserve and protect the environment. SJVN strictly
adheres to all policies and guidelines of the Ministry of Environment, Forest and Climate
Change (MoEFSCC) concerning identification and mitigation of environmental impacts of
projects, which are a part of the Comprehensive Environmental Impact Assessment (CEIA)
Study of projects, carried out through reputed organizations/NABET accredited-consultants.
AH environmental aspects are suitably addressed in the CEIA study. Accordingly, Management
Plans are prepared and suitable measures are adopted to negate any adverse impact on the
environment and ecology during construction and operation stages of project cycle. In
order to achieve these objectives, SJVN has a dedicated Corporate Environment Department
at CHQ besides Environment officers posted at various projects.
SJVN has also been in consonance with "Mission Life" launched by MoEFSCC and
is striving to achieve its aims. SJVN commits to saving energy and water, reducing waste,
e-waste, plastic waste and avoiding single-use plastics, and encouraging employees for
adopting healthy lifestyles.
SJVN has consistently complied with applicable environmental legislations and norms,
has always mitigated environmental risks and has adopted the best environmental practices.
In recognition to these efforts, SJVN has been awarded with the prestigious
"Greentech Environment Award 2023" in the category of "Environmental
Excellence".
SJVN has three hydro power stations under operation, viz 1500 MW Nathpa Jhakri HPS
(NJHPS) and 412 MW Rampur HPS (RHPS) in Himachal Pradesh and 60 MW Naitwar Mori HPS in
Uttrakhand, wherein management measures such as Catchment Area Treatment (CAT),
Compensatory Afforestation (CA), Muck Management, Restoration of muck disposal sites,
quarry sites and construction areas, Green belt development, Fisheries Management,
Reservoir rim treatment, etc. were successfully undertaken. Regular environmental
monitoring is done at SJVN projects and six-monthly compliance reports of Environment
Clearance are sent to MoEFSCC and other concerned authorities.
SJVN has three hydroelectric projects, which are in construction stage
in Himachal Pradesh - 210 MW Luhri Stage-1 HEP, 382 MW Sunni Dam HEP on River SatLuj
and 66 MW Dhaulasidh HEP on river Beas in Himachal Pradesh.
At Luhri Siage-I HEP, Environment Management Plan(EMP) amounting to'Rs. 168.60 crore
along with a Corporate Environment Responsibility (CER) plan amounting to'8.6 crore are
being implemented.
The project has also been certified for ISO 9001:2015, IS/IS016001:2015 S IS/ISO
65001:2018 (QEHSS) by Bureau of Indian Standards.
Various Environment Management measures taken at project sites are as follows:
i. A playground at Government Primary School, Koel has been developed under CER by
funding an amount of'5 lakhs.
ii. For PHCs of Neether, Koel, Nirath and Shamathala, First Aid/ Medical equipment
amounting'Rs. 6.9 lakhs have been provided for medicaltreatment of locals.
iii. Environment Lab has also been set up at project site.
At Dhaulasidh HEP, EMP amounting to'Rs. 36.16 crore is being implemented. Environment
Management System (ISO 16001:2015) is also being implemented. Other measures are as
follows:
i. For Fisheries Management Plan (FMP), an amount of'Rs. 70 Lakh was deposited to HP
Fisheries Department, of which'Rs. 19.5 Lakh has been utilized
ii. Early Warning system for floods has been installed.
iii. 2 STPs in the project site and 1 STP near office building have been installed.
iv. This year 111 nos. solar lights have been installed in Hamirpur, Bilaspur, Kangra
and Chamba districts.
SunniDamHEPisin early stages of construction. An amount of'305.66 crore has been kept
for implementation of various measures proposed in Environment Management Plan.
60 MW Naitwar Mori Hydroelectric Project, on Tons river in Uttarkashi District of
Uttarakhand has been commissioned in December2023.
'65.50 crores has been spent against a financial provision of'Rs. 32.68 crore on
implementation of environmental management measures, which was appreciated by the
Government officials during Multidisciplinary Committee (MDC) meeting. Some of the
initiatives are below:
i. For implementation of CAT plan, Rs'12.96 crore have been deposited out of which'Rs.
1.61 crore have been utilized.
ii. CA over 80.00 ha of civil soyam and forest land has been carried out,'Rs. 76.67
lakhs have been spent.
iii.'Rs. 63 lakhs has been deposited for Biodiversity Conservation and Management Plan
prepared by State Forest Department, of which'Rs. 28.2 lakh has been spent.
iv. Under Fisheries Management Plan (FMP), a fish pass for migratory fish species has
been completed. Central Inland Fisheries Research Institute, Barrakpore, West Bengal has
vetted the design parameters for effective and sustainable fish pass.
v. Muck management is being implemented as per the MoEFSCC guidelines.
vi. To avoid landslides and soil erosion, Reservoir Rim Treatment Plan is being
implemented.
vii. Environmental parameters are being monitored by Pollution Control Research
Institute, BHEL at Haridwar. Data shows reported values below the prescribed permissible
limits.
viii. Rain water harvesting system along with a 60 KLD STP has been setup at project
colony.
ix. Bio composterfi Plasticwaste bailing machine have been procured for treatment of
solid waste of project affected villages and project colony.
x. AAC bricks having fly ash content about 68% were used in the
construction of township and office buildings, resulting in recycling of Waste product.
xi. For energy conservation, energy efficient BEE 5 Star rating electrical appliances
have been procured.
xii. Environment Management System (ISO 16001:2015) is being implemented.
At NJHPS, an "In House Paper to Pencil Making Plant" for recycling of waste
paper has been established to show the commitment and concern towards sustainable
development.
At RHPS, the initiatives taken for environmental considerations are as under
i. A roof top solar power plant with total capacity 60kWp has also been installed,
commissioned in 2019. Total green energy generation for FY 2023-26 was 79067 Units with
CUF=15%.
ii. A new 1000 KG/day capacity automatic organic waste converter has been installed,
supplementing the existing 25 KG/day capacity converter. Compost pits are also being used
for making organic compost.
iii. The Direct On-Line (DOL) starters for pump-motor sets were replaced with VFD cum
motor control panels in three units. This transition cuts annual energy consumption of the
pump-motor sets by 25%, enhancing unit and plant efficiency.
SJVN Corporate Headquarters (CHQ) is designed and constructed with green building
concept equipped with STP of 90 KLD per day capacity for wastewater recycling, rain water
harvesting system with capacity of 50 kL, natural lighting with provision of sky light
glasses, centralized HVAC system, intelligent/automatic sensor-controlled illumination
system for conservation of electricity, etc. Owing to these efforts, CHQ Building has
obtained four-star GRIHA rating. Various aspects are as follows:
i. 160 kWP On-Grid Solar Power Plant has been installed.
ii. Water Solar Heating System of 5000 Ltr. Capacity has been installed.
iii. A recycling plant is installed to convert kitchen waste into compost.
iv. AAC blocks are being used in construction of Auditorium Block and Guest House.
v. Bio-Diversity Park has been developed near CHQ in association with Municipal
Corporation, Shimla.
vi. Energy Audit of CHQ was conducted in FY 2021-22 and recommendations like
improvement of power-use, LED lights automation system, etc. are being implemented.
SJVN celebrated World Environment Day on 5th June 2023 and organized "Swachhta
Pakhwara" in October 2023. Pledge for environment protection/conservation and talks
on environmental aspects were delivered. In addition, Slogan-writing, Drawing,
Photography, awareness programs, etc. were also organized and environmental awareness
films were screened. Large scale plantation programs were also undertaken to raise
awareness about environmental issues and inculcating a sense of responsibility and
stewardship towards our planet.
14. CSRAND SUSTAINABILITY
An annual report of Corporate Social Responsibility, highlighting the Company's CSR
Policy, details of expenditure on CSR and overview of projects/ programs/ activities
undertaken by the Company during FY 2023-26 and Impact Assessment in format prescribed
under Companies (CSR Policy) Rules 2016 is annexed as Annexure-V and forms an integral
part of this Directors' Report.
15. REHABILITATION AND RESETTLEMENT
SJVN, being conscious of its responsibilities towards society, is committed to execute
and operating power projects in a socially responsible manner by adopting generous
Rehabilitation S Resettlement measures for the benefit of Project Affected Families (PAFs)
by investing in the socio-economic development of communities
to continually minimize potential negative impacts as well as to establish the
sustainable positive impact of projects on them.
Well before any project is taken up for execution, Social Impact Assessment (SIA) study
is carried out to ensure that the potential socio-economic benefits accrued from the
project outweigh the likely social costs and adverse social impact. Public consultation
meetings with the stakeholders are held by the project authorities to make local
communities aware of developmental facilities to be created in the fields of health,
education, sanitation, drinking water, approach roads and other community assets of the
project and their benefits to the society. Subsequently, the R&R plan is devised based
on conclusive findings derived from the socio-economic survey carried out by an
independent expert agency. The RSR plan thus devised and approved essentially prescribes
mitigation measures for the reconstruction and regeneration of economies of the PAFs.
During the implementation stage of the RSR plan, regular monitoring of RSR activities is
conducted through an external independent agency to ensure the timely extension
of RSR benefits to the PAFs. Subsequently on completion and implementation of the RSR
plan, social impact evaluation is carried out by an independent external agency to assess
various tangible and intangible benefits accrued in the area of socio-economic
development. To have constant interaction with local people, a Project Information Centre
is set up at project level.
SJVN has implemented/ implementing RSR plans in 07 Power Stations/ Projects:
1. Nathpa Jhakri Hydro PowerStation (NJHPS.1500 MW)
2. RampurHydro PowerStation (RHPS, 412 MW)
3. Naitwar Mori Hydro PowerStation (NMHPS, 60 MW)
4. Luhri Hydro Electric Project Stage-1 (LHEP Stage-1,210 MW)
5. Sunni Dam Hydro Electric Project (SDHEP, 382 MW)
6. Dhaulasidh Hydro Electric Project (DSHEP, 66 MW)
7. BuxarThermal Power Project (BTPP, 1320 MW)
The details of R&R benefits extended to PAFs in above Power Station/ Power project
are given under table-1
TABLE-1
Sr. No. |
Project |
State |
District |
No. of Project Families |
% of PAFs covered under R&R benefits |
R&R monetary benefits to PAFs. (' in Cr.) |
LADF payable Amount (' in Cr.) |
LADF amount released so far (' in Cr.) |
Remarks |
1 |
NJHPS |
Himachal Pradesh |
Shimla & Kinnaur |
480 |
100% |
17.9 |
NA |
NA |
Projects has been commissioned and RSR activities has been concluded |
2 |
RHPS |
Himachal Pradesh |
Kullu & Shimla |
139 |
100% |
61.17 |
55.26 |
55.26 |
Projects has been commissioned and RSR activities has been concluded |
3 |
LHEP-1 |
Himachal Pradesh |
Shimla and Kullu |
1102 |
95.73% |
44.78 |
28.69 |
Nil |
(LADF to be released after signing of Implementation Agreement. The
matter is sub- judice with GoHP). |
4 |
SDHEP |
Himachal Pradesh |
Shimla & Mandi |
2274 |
5.67% |
7.26 |
39.22 |
Nil |
LADF of'Rs. 39.22 Cr. is to be released just after the signing of
Implementation Agreement with GoHP. |
5 |
DSHEP |
Himachal Pradesh |
Hamirpur |
5 |
60% |
00.62 |
10.34 |
Nil |
|
6 |
NMHPS |
Uttarakhand |
Uttarkashi |
94 |
100% |
8.26 |
Nil |
Nil |
LADF scheme has recently notified by Uttarakhand Govt. & same is
being taken-up with District Administration, Uttarkashi for implementation. |
7 |
STPL |
Buxar |
Bihar |
Under process However, 2500 approx |
Under process |
Under process |
Nil |
Nil |
|
Besides above 07 power project, the followings projects are under survey and
investigation stage and their RSR status is as under:
1. Jakhol Sankri Hydro Electric Project Uttarakhand (JSHEP, 44 MW):
Land acquisition as per RFCTLARR Act, 2013 is under process. The RSR plan for Project
Affected Families (PAFs) has been prepared in line with RFCTLARR Act, 2013 and approved by
Govt of Uttarakhand.
2. Devsari Hydro Electric Project Uttarakhand (DHEP, 252 MW):, land acquisition process
under RFCTLARR Act, 2013 is in progress. The RSR plan for Project Affected Families (PAFs)
is prepared in line with RFCTLARR Act, 2013 and is approved by the Govt, of Uttarakhand.
3. Etalin Hydroelectric Project, Arunachal Pradesh ( Etalin HEP, 3097 MW)
:The Govt, of Arunachal Pradesh has conveyed RSR plan for EHEP. The Dy. Commissioner,
Anini has also submitted Land compensation Estimate to Govt, of Arunachal Pradesh. Final
award Notification is under process.
4. Attunli Hydroelectric Project, Arunachal Pradesh (Attunli HEP, 680 MW): SIA report
under Section (4) of RFCTLARR Act, 2013 is in advance stage of approval by the Govt, of
AP.
5. Emni Hydroelectric Project (Emni HEP, 500 MW), Amulin Hydroelectric Project (Amulin
HEP, 420 MW) and Mihundon Hydroelectric Project (Mihundon HEP, 400 MW) Arunachal Pradesh:
The projects are under survey & investigation stage.
TABLE-2
Sr. No. |
Name of project |
State |
District |
No. of Project affected Families |
% of PAFs covered under R?R Benefits |
R?R Monetary benefits paid to PAFs in'Rs. Cr |
LADF payable amount in Cr |
LADF Amt. Released so far'Rs. in Cr. |
Remarks |
i |
EtaLin HEP |
Arunachal Pradesh |
Dibang Valley |
265 |
57.74 |
Nil |
64.31 Cr. |
Nil |
|
2. |
Attunli HEP |
ArunachalPradesh |
Dibang Valley |
92* |
Under Process |
Nil |
Under process |
Nil |
*As per SIA report. |
3 |
Emni HEP, Amulin HEP and Mihundon HEP HEP |
Arunachal Pradesh |
Dibang Valley |
Under S?l stage. |
Social Impaci Evaluation (SIA): TheSociallmpact Evaluation (SIA) studies of R?R
implementation of projects are carried out by the specialization agencies. Social impact
assessment reports reveal that RSR implementation in the project affected areas has
substantially enhanced the socio-economic standard of the local population on various
development parameters like economy, health, education etc. The World Bank Mission has
monitored the RSR activities carried out in NJHPS and RHPS and reorganized SJVN RSR
activities as under-
'The success of the resettlement activities undertaken in these projects are quite rare
for India, and can be considered as one of the best examples of resettlement
implementation in bank assisted projects in India. It should be considered as an example
for other projects.'
16. RESEARCH AND DEVELOPMENT
SJVN has been continuously striving for excellence in its core area of power generation
by showing commitment towards research and development, innovation, technology
up-gradation, and product development.
Specific areas in which RSD/Innovations have been carried out during FY2023-24are:
1. To reduce the downtime of machines, The Bottom Removal of Kaplan Turbine ? its
components is under adoption at LHEP-1 Project.
2. Topographical plan developed using high resolution satellite imageryforChenab
projects.
3. Pilot Hydrogen generation project of capacity 20 NM3/hr Green Hydrogen and 25 kW of
Green Power is under construction at NJHPS, Jhakri.
4. SJVN has established partnerships/collaborations with several academic institutions,
for the fiscal year 2023-24, as detailed below.
a. IIT Madras: Development of Alternative material for improved Silt and Cavitation
erosion resistance coatings of hydro turbine components.
b. IIT Delhi: Ongoing studies on High performance concrete for high sluice spillways of
dams and barrages.
c. IIT Roorkee: Development of prototype Hydrokinetic Turbine based on lab scaled
model.
d. IIT Mandi: Studies completed for the optimum height of lift for mass concreting in
concrete dam structures.
Apart from above R?D, 28 no. innovative/ technological upgradation measures were also
taken at Project sites ? Corporate Headquarter of SJVN to enhance the operational
efficiency of the company. The total expenditure by SJVN for RSD/ Innovations initiative
works for the FY 202324 was I NR 17.62 Cr. (including taxes).
17. HUMAN RESOURCES
The total Manpower on the rolls of SJVN (Direct Recruits/Absorbed Employees and Fixed
Term Appointees) as on 31.03.2024 was 1718 and the strength of HPSEB/HP Govt. Employees on
deputation on the above date was 39.
(i) Representation of Women employees:
Group |
Total Employees as on 31.03.2024 |
Number of Women Employees |
Percentage overall staff Strength |
SJVN (Direct + Absorbed+FTAs) |
1718 |
186 |
10.82 |
Deputationist from HPSEB/GOHP |
39 |
3 |
7.692 |
Total |
1757 |
189 |
10.75 |
(ii) Representation of Physically Challenged Employees:
Group |
Total Employees as on 31.03.2024 |
Physically Challenged Employees |
Percentage of Physically Challenged Employees |
VH |
HH |
OH |
Total |
SJVN (Direct + Absorbed+FTAs) |
1718 |
7 |
9 |
21 |
37 |
2.153 |
(iii) Representation of SC/ST ? OBC employees:
Group |
Total Employees as on 31.03.2024 |
Representation |
SC |
SC% |
ST |
ST% |
OBC |
OBC% |
SJVN (Direct + Absorbed + FTAs) |
1718 |
366 |
21.3 |
111 |
6.46 |
316 |
18.39 |
Committing towards continuous growth and development, SJVN gives utmost importance to
the enrichment of employee skills and knowledge. During the Financial Year 2023-24, 6
Online Programmes, 67 In-House Programmes and 119 External Programmes were conducted.
The trainings were imparted through organizations of national repute like IIMs, NTs,
NPTIs, CIGRE, Indian Institute of Corporate Affairs (IICA), AJNIFM, ISEG, THDC, NAHRD,
ESCI, ASCI, CBIP, DPE, INCOLD, SCOPE, Indian Institute of Remote Sensing, Engineering
Council of India, BHEL, National Water Academy, DVC, Capacity Building Commission, DoPfiT,
etc.
The Training Programmes were conducted on topics like, Corporate Governance, Awareness
Session on ABMS (ISO 37001), Contract Management including decision of LD imposition,
ORACLE Primavera P6 Professional Training, Vigilance Awareness to enhance Managerial
Effectiveness, Preparation on Estimate for small/ major services/ works/ supplies/ misc.
proposals, Manual Metal Arc Welding, Capacity Building Programme on Vigilance Awareness,
International Symposium on Tunneling, Solar Power Plant designing with PVSYST and PVSOL
Software, Audit, Accounting ? Financial Management, Public Procurement - Emphasis on
Goods, Services ? Consultancy, Adopting Best Life Style Practices for better Management,
Management Development Programme, Engineering Geological Mapping, PowerTrading
fiTransmission, Welding ? Inspection, Phased Array Ultrasonic Testing - Level II,
Enterprise Risk Management, Role of Engineers in Accelerating Economic Growth, 0?M of
Thermal Power Plant and Visit to Thermal Power Plant, Advanced practices for
Geo-Engineering Challenges, EHV- Gas Insulated Switchgear, FDP on Battery Storage, Green
Hydrogen and New Energies, Basic Safety Working at Height, First Air, Manual Handling,
Fire Awareness based on GWO Standards, etc. to mention a few.
To inculcate SJVN Core Values among employees and motivate them, a series of
specialized Training Programmes namely'Rs. S3 Shivir - Saksham SarthakShreshth1
were organized for all SJVN Executives during Financial Year2023-24.
MotivationalTalk(s) - 2 No. Programmes were organized through renowned Motivational
Speaker(s) namely, Mr. Anurag Rishi and Mr. Harshvardhan Jain, which were also relayed
through Facebook live for employees posted at various SJVN's Projects /Offices located
across in India/Nepal/Bhutan.
Training Programme on occasion of International Women's Day 2024 was organized at
Shimla on 8th March, 2024, wherein Ms. Geeta Phogat was invited as Motivational Speaker.
The Programme was attended by SJVN's women employees posted at various projects /offices
located across.
18. INDUSTRIAL RELATIONS
Regular Meetings are held with the representatives of the various Associations / Unions
to sort out the local issues as well as policy related matters. Recreational, Cultural and
Sports functions on different occasions were also held, thus, resulting in better
employee- employer relations and cordial industrial relations were maintained
duringtheyear.
19. STATUTORY AND OTHER INFORMATIONS
The information required to be furnished as per the Companies Act 2013, SEBI (Listing
Obligations S Disclosure Requirements) Regulations, 2015, Government Guidelines, and Code
of Corporate Governance of your Company, on the following matters is placed at respective
annexures and form integral part of Directors Report:-
a. Management Discussion and Analysis - Annexure - I
b. Report on Corporate Governance - Annexure - II
c. Certificate from Practicing Company Secretary on Corporate Governance- Annexure -
III
d. Information on Conservation of Energy, Technology Absorption and Foreign Exchange
earnings and out go - Annexure - IV
e. Annual Report on Corporate Social Responsibility SSustainability - Annexure - V
f. Business Responsibility and Sustainability Report - Annexure - VI
g. Certificate regarding Non-Disqualification of Directors - Annexure - VII
h. Secretarial Audit Report - Annexure - VIII
20. DIRECTORS' RESPONSIBILITY STATEMENT
The Directors' state that:
in the preparation of the annual accounts for the year ended March 31, 2024, the
applicable Accounting Standards read with requirements set out under Schedule III to the
Act, have been followed along with proper explanation relating to material departures, if
any
the Directors have selected such accounting policies and applied them
consistently except as disclosed in the Notes on Accounts and made judgment and estimates
that are reasonable and prudent so as to give a true and fair view of the state of affairs
of the Company as at March 31, 2024 and of the profit of the Company for the year ended on
that date;
the Directors have taken proper and sufficient care for the maintenance of
adequate accounting records in accordance with the provisions of the Act for safeguarding
the assets of the Company and for preventing and detecting fraud and other irregularities;
the Directors have prepared the annual accounts on a'Rs. going concern' basis;
the Directors have laid down internal financial controls to be followed by the
company and that such internal financial controls are adequate and are operating
effectively; and
the Directors have devised proper systems to ensure compliance with the
provisions of all applicable laws and that such systems are adequate and operating
effectively.
21. DECLARATION OF INDEPENDENCE BY INDEPENDENT DIRECTORS
Your Company has received declarations from all the Independent Directors confirming
that they meet the criteria of independence as provided under Section 149(6) of the
Companies Act, 2013 and under Regulation 16(1)(b) of Securities and Exchange Board of
India (Listing Obligations and Disclosure Requirements) Regulations, 2015.
22. SECRETARIAL STANDARDS
The Company has complied with the applicable Secretarial Standards during the Financial
Year ended 31.03.2024.
23. SEXUAL HARASSMENT PREVENTION
SJVN has implemented the Sexual Harassment of Women at Workplace (Prevention,
Prohibition and Redressal) Act, 2013 in its entirety.
Internal Complaints' Committees as per the provisions of the act have been constituted
at Corporate Office and Projects sites of SJVN.
Summary of Sexual harassment issues raised, attended and dispensed during the year
2023-24 has been disclosed in Report on Corporate Governance.
24. RISK MANAGEMENT FRAMEWORK
The Company has implemented Risk Management Policy and the details of the same is
included in Report of Corporate Governance. SJVN has also implemented Risk Management
Framework as per ISO 31000:2018 consisting of thefollowing: -
1. Risk Identification and Assessment: SJVN conducts thorough risk identification and
assessment processes across its projects, and departments. This includes evaluating both
internal factors (such as operational risks, financial risks, and compliance risks) and
external factors (such as market risks, regulatory risks, and environmental risks).
2. Risk Mitigation Plan: Once risks are identified, SJVN develops risk mitigation plan
for each risk. These plans involve implementing preventive measures, establishing control
mechanisms, and implementing best practices to minimize the likelihood and impact of
risks. For opportunities, SJVN devises action plans to maximize their potential benefits
and value.
3. Regular Risk Review and Reporting: SJVN conducts periodic reviews of risks and
opportunities to ensure their relevance and effectiveness. Frequency of Project level Risk
steering committee meeting is quarterly basis and for corporate level Risk steering
committee meeting is half yearly basis. The Risk Management committee of SJVN board
conveneson biannual basis.
4. Preventive Actions and Continuous Improvement: SJVN emphasizes the implementation of
preventive actions to address potential risks probatively. This involves conducting risk
assessments, identifying control gaps, and implementing measures to strengthen controls
and reduce the likelihood of risks occurring. The organization also fosters a culture of
continuous improvement, regularly evaluating and enhancing risk management practices.
5. Training and Awareness: SJVN provides training and awareness programs to its
employees to enhance risk management capabilities. This ensures that employees across the
organization understand their roles and responsibilities in managing risks and
capitalizing on opportunities.
25. SECRETARIAL AUDIT
The Board appointed Shri Santosh Kumar Pradhan, Practicing Company Secretary, to
conduct Secretarial Audit for the Financial Year 2023-24. The Report of the Secretarial
Auditors for the year ended 31.03.2024 is placed at Annexure-VIII. Reply of Board to
observations of Secretarial Auditor is placed at Annexure-IX.
In compliance to Regulation 24A of SEBI Listing Regulations, Secretarial Audit Report
of SJVN Thermal Private Limited (STPL), which is a material unlisted subsidiary of SJVN,
is also given along with Secretarial Audit Report of the Company.
26. STATUTORY AUDIT
M/s APT ? Co. LLP, Chartered Accountants, were appointed by Comptroller ? Auditor
General as Statutory Auditors of the Company for the financial year 2023-24.
The Report of the Statutory Auditors to the Members on the Standalone and Consolidated
Accounts for the year ended 31.03.2024 is placed at Annexure-X and Annexure-XI
respectively. Reply of Board to observations of Statutory Auditor on Internal Financial
Control on the Standalone and Consolidated Accounts are placed at Annexure-XII and
Annexure-XIII respectively. Observations/ Comments of the Comptroller and Auditor General
(C?AG) of India on the Standalone and Consolidated Accounts for the year ended 31.03.2024
and Board's replies thereon are placed at Annexure-XIV and Annexure-XV respectively.
27. ANNUAL RETURN
The Draft Annual Return in Form MGT-7 as required under Section 92(3) of the Companies
Act, 2013 can be accessed at Investor Relation Section on SJVN website www.sjvn.nic.in.
28. COST RECORDS AND AUDIT
Pursuant to the Central Government directions to audit Cost Accounting Records as
maintained by the Company, your Company appointed M/s A.J.S. ? Associates, Cost
Accountants, as Cost Auditor for the financial year 2023-24. The Cost Audit Report for the
year ended 31st March 2023 was filed with MCAon12.10.2023.
29 INTERNAL FINANCIAL CONTROL SYSTEM
Internal controls are the mechanisms, rules, and procedures implemented by a company to
ensure the integrity of financial and accounting information, promote accountability and
prevent fraud. Financial controls are processes, policies, and procedures that are
implementedto manage finances.
The company has adequate internal control system and the transactions/processes are
guided by delegation of powers, policies, rules, guidelines and manuals framed in
compliance with relevant laws and regulations. The organizational structure is well
defined in terms of structured authority/responsibility involved at each particular
hierarchy/level.
The company has sufficient internal control over financial reporting to ensure
assurance regarding the reliability of financial reporting and in the preparation of
financial statements for external purposes in accordance with generally accepted
accounting principles.
In order to ensure adequacy of internal control system, internal audit is conducted by
the independent Chartered Accountants firms in close co-ordination with company's own
internal Audit Department. The internal Audit process includes review and evaluation of
effectiveness of existing processes, controls and compliances. It also ensures adherence
to rules, procedures, policies and systems and mitigation of the operational risks
perceived for each area under audit.
It is also informed that significant Audit observations and Action Taken reports are
placed before the Audit Committee headed by Independent Directors. The recommendation and
directions of the Audit Committee are carried out and complied with.
30. RELATED PARTY TRANSACTIONS ? POLICY
In compliance with the provisions of Regulation 23 of SEBI (Listing Obligations and
Disclosure Requirements) Regulations, 2015 and Section 188 of Companies Act 2013, the
company has formulated a Policy on Materiality of Related Party Transactions and dealing
with Related PartyTransaction, duly approved bythe Board of Directors.
AH contracts/ arrangements/ transactions entered by the company during the financial
year with related parties were in the ordinary course of business and on arm's length
basis. During the year, the company had not entered into any contract/ arrangement/
transaction with related parties, which could be considered material in accordance with
the policy of the company on materiality of related party transactions or provisions of
SEBI (LODR) Regulations, 2015. Your attention is drawn to the Financial Statements, which
sets out the Related Party Disclosures under Note no. 2.44.
The Policy on Materiality of Related Party Transactions and dealing with Related Party
Transaction has been disclosed on website of the Company and may be accessed at https://sivnindia.com/UploadFiles/Page/1053829670
PageDocumeni policv%20on%20maierialiiv%20of%20relaied%20pariv%20iransaciions
%20and%20on%20dealing%20with%20related%20party%20transaction s 13.06.2024.pdf.
31. CONSOLIDATED FINANCIAL STATEMENTS
In accordance with the Indian Accounting Standard (Ind ASJ-110 on Consolidated
Financial Statements read with Ind AS-111 on Joint Agreements and Ind AS-112 on Disclosure
of Interest in other entities, the Audited Consolidated Financial Statements are provided
in the Annual Report. Directors Report / Financial Statements in respect of following
Subsidiary Companies are also included in this Annual Report: -
a) SJVN Thermal Private Limited.
b) SJVN Green Energy Limited.
c) SJVN Arun-3 Power Development Company Private Limited, Nepal.
d) SJVN Lower Arun Power Development Company, Nepal Statement containing salient
features of the financial statements of Subsidiaries/ Joint Ventures of SJVN Ltd. pursuant
to first proviso to sub-section (3) of Section 129 read with Rule 5 of Companies
(Accounts) Rules, 2014, in form AOC-I forms part of the Consolidate Financial Statements.
32. DETAILS OF DIRECTORS OR KMPAPPOINTED/ RESIGNED
During the FY 2023-24, the following changes took place in the composition of the Board
of Directors or KMP of the Company -
a. Shri S.P Bansal, Director (Civil), who was suspended by Ministry of Power,
Government of India Order No.C-13011/52/2022-V?S dated 28th July, 2022 ceased
as Director (Civil) consequent to attaining the age of superannuation on 31st
July, 2023.
b. Shri RajeevSharma, Secretary (MPP ? Power) ceased as Part Time Official Director
(GoFIP Nominee) pursuant to relieving him from the post of Secretary (Ayush, YSS, P?S,
MPP ? Power and NCES) to the GoFIP, Shimla. w.e.f. 31a0ctober2023.
c. Shri Bharat Khera, Principal Secretary (MPP ? Power and NCES), Government of
Himachal Pradesh appointed as a Part Time Official Director - Government of Himachal
Pradesh Nominee on the Board of Directors of the Company w.e.f. 26th December,
2023.
d. Shri Nand Lai Sharma, Chairman and Managing Director ceased as Director of the
Company consequent to superannuation w.e.f. 31st January, 2024.
e. Shri Bharat Khera, Government of Himachal Pradesh, ceased as Part Time Official
Director (GoHP Nominee) on withdrawal of Nomination by appointing authority w.e.f. 03rd
February, 2024.
The following changes took place during the current financial year 2024-25
till the date of the Director's Report:
a. Smt. Geeta Kapur, Director (Personnel) who was also holding additional charge of
Chairman and Managing Director pursuant to Ministry of Power order dated 31.01.2024,
ceased as Director of the Company w.e.f. 30th April 2024 on account of
superannuation.
b. Shri Ajay Tewari, Additional Secretary, Ministry of Power has ceased as Part Time
Official Director- Gol Nominee w.e.f. 31st May, 2024.
c. Shri Mohammad Afzal, Joint Secretary (Hydro), Ministry of Power, Government of India
has been appointed as Part Time Official Director- Gol Nominee w.e.f. 12th
July, 2024.
d. Shri Arindam Chaudhary, Special Secretary Power, Government of Himachal Pradesh has
been appointed as Part Time Official Director- GoHP Nominee w.e.f. 12th July,
2024.
None of the Directors are inter-se related to each other.
The Board Meetings held during the FinancialYear 2023-24 and the attendance of the
Directors therein is mentioned in the Report on Corporate Governance.
33. BOARD LEVEL COMMITTEES
The composition of the Statutory Committees constituted as per the Companies Act 2013
and the SEBI Listing Regulations and the meetings held therein are mentioned in the
Corporate Governance Report.
34. KEY MANAGERIAL PERSONNEL
In compliance with Section 203 of the Companies Act, 2013, following have been
designated as Key Managerial Personnel:-
1. Shri Sushil Sharma, Chariman ? Managing Director and Director (Projects).
2. Shri Akhileshwar Singh, Director (Finance) ? Chief Financial Officer.
3. Shri Soumendra Das, Company Secretary.
35. IMPLEMENTATION OF OFFICIAL LANGUAGE
In order to ensure the implementation of the Official Language Policy of the Govt, of
India, all possible efforts have been made by the company to achieve the targets as
specified by the Department of Official Language. Under section 3.3(1) of Official
Language Act cent percent documents were issued bilingually Sail the letters received in
Hindi were replied to in Hindi. Company's website is in bilingual form and it is updated
from timetotime.
To encourage executives and non-executives to do their entire work in Hindi, number of
incentive schemes are under implementation namely Payment of increment of three months
during the year, fordoing his/her whole office workinHindiandduringthe year and under this
scheme a total 209 Employees/Officers were awarded cash prizes amounting to
?14,01,540/-(Approx.).
12 Hindi workshops/seminars have been organised and 353 no. of executives and
non-executives have been trained. Organising of Hindi quiz competitions on
national/important occasions and other competitions (i.e. Nibhand (Essay writing), Kahani,
Noting-drafting, Shabdarth gyan, Sulekh, Hindi Vyakaran Rajbhasha Niti ? Shodhpatra
competition) is a regular feature and besides this number of competitions were also
organised during "Hindi fortnight". In these competitions 236 no. of employees
were awarded cash prizes amounting to ?4,52,800.
During the year under review, with the aim of propagating Hindi in the schools,
colleges, institutes and universities located in the projects including Corporate Office,
Shimla, various Hindi competitions were organized and awards amounting to about
?2,40,500/- were given to 115 students.
To popularise Hindi in a big way a'Rs. Akhil Bhartiya Kavi Sammelan1 was
organised on 20.03.2024 at Corporate Headquarter, Shimla.
Half yearly meetings of the Town Official Language Implementation Committee, Shimla
(Office-2) constituted for the CPSUs ? Banks etc. were held on 24.07.2023 ? 26.12.2023.
Similarly, Rajbhasha Sangosthi has been organised on 20.03.2024 for TOLIC, Shimla
(Office-2) employees and the awards of TOLIC Rajbhasha Shield were given to the members of
TOLIC, Shimla (Office-2) on 26.12.2023 forthe best performance in Official Language Hindi.
To give impetus to the multi-facet talent of employees an in-house biannual Hindi
magazine "Himshakti" and on Annual basis issues of TOLIC in-house magazine'Rs.
Himsamvad' was published and circulated. Out of total expenditure on purchase of books,
90.31% of amount was spent on purchase of Hindi books.
36. AWARDS ? ACHIEVEMENTS
1. 11th April, 2023 : SJVN won two prestigious awards at 14th
CIDC Vishwakarma Awards 2023. The'Rs. Achievement Award for Creating Social Development
and Impact has been conferred in recognition to the exceptional organizational efforts in
the field of Corporate Social Responsibility.
2. 15th July, 2023 i First prize in prestigiousSwachhta Pakhwada Award 2023
by Ministry of Power, Govt, of India.
3. 11th August, 2023 : SJVN awarded prestigious Developer of the Year
Platinum Award in Solar Sector under PSU category by EQ International.
4. 17th August, 2023 : SJVN conferred with first prize of'Rs. NTPC Rajbhasha
Shield 2023.'
5. 22nd August, 2023 : SJVN conferred with'Rs. 2nd Annual
Greentech Quality ? Innovation Award 2023' under the category of Quality Improvement.
6. 25th August, 2023 estigious'RE Developer of Year for Rajasthan Silver
Award' in PSU category during Rajasthan Annual Solar Award 2023.
7. 13th September, 2023 ry Management System certification by Bureau of
Indian Standards.
8. 24th November, 2023 : SJVN conferred with 23rd Annual
Greentech Environment Award 2023 under category of Environment Excellence. SJVN has also
been bestowed with 10th Annual Greentech CSR Award in Healthcare Promotion
Category.
9. 27th December, 2023 : SJVN awarded with prestigious IEI Industry
Excellence Silver Award 2023 by Institution of Engineers India.
10. 12th January, 2024 :SJVN certified as Great Place To Work by Great Place
To Work, India.
11. 18th January, 2024 : SJVN won'Rs. SCOPE Excellence Award in
Institutional Category II' and'Rs. SCOPE Meritorious Award for Corporate Social
Responsibility ? Responsiveness.'
12. 6th February, 2024 : SGEL, renewable arm of SJVN Limited won
prestigious'Rs. Diamond Award for Large Scale Solar Project Developer of Yearin
UttarPradesh in PSU category.
13. 29th February, 2024 : STPL, a wholly owned subsidiary of SJVN conferred
with Certificate of Appreciation for Second Highest percentage in procurement from Women
owned MSEs amongst CPSEs.
37. OTHER MAJOR DEVELOPMENTS
1. 6th April, 2023 : SJVN nominated as fourth Renewable Energy Implementing
Agencies (REIAs) in addition to SECI, NTPC and NHPC.
2. 3rd May, 2023 : SJVN bagged full quoted capacity of 200 MW Grid connected
Solar Power Project in Khavda Solar Park @ D2.88 per unit in e-Reverse auction conducted
by GUVNL.
3. 5th May, 2023 : SJVN bagged 100 MW Grid Connected Wind Power Project at a
tariff of D3.17 per unit in Gujarat.
4. 23rd May, 2023 : SJVN signed Memorandum of Understanding with Government
of Goa for development of Renewable Energy Projects.
5. 2nd June, 2023 : Project Development Agreement (PDA) of 669 MW Lower Arun
Hydro Electric Project in Nepalsigned.
6. 13th June, 2023 : SJVN bagged 200 MW Grid Connected Wind Power Project at
a tariff of D3.24 per unit in e-RA organized by SECI.
7. 15th June, 2023 : SJVN signed Memorandum of Understanding with MAHAGENCO
for development of 5000 MW Renewable Energy Projects in Maharashtra.
8. 19th July, 2023 : SJVN signed Power Purchase Agreements for 300 MW
Renewable Energy Projects with MSEDCL.
9. 21st July, 2023 : SJVN inked an MoU with REC to finance projects of SJVN
and i ts subsidiaries ? joint ventures to the extent of D50.000/- crores.
10. 3rd August, 2023 : SJVN inked Memorandum of Understanding with Sikkim
Urja Limited for trading 180 MW Hydro Power from SUL's 1200 MWTeesta-lll Hydro Electric
Project in Sikkim to Distribution Licensees and Open Access Consumers.
11. 10th August, 2023 idums of Understanding with
ONGC for joint development of renewable energy projects
12. 10thAugust, 2023 ndums of Understanding with
Sambhar Salts Limited, a subsidiary of Hindustan Salts Limited for development of Solar
Projects / Park in phased manner on identified land bank of M/sSSL.
13. 10th August, 2023 :SJVN has 90 MW Floating Solar Project @ ?3.79/unit in
OmkareshwarFloatingSolarPark, Madhya Pradesh.
14. 12th August, 2023 : SJVN signed historic MOA for implementing five Hydro
Projects of 5097 MWin Arunachal Pradesh.
15. 29th August, 2023 : SJVN received Letter of Awards for executing three
solar projects of 320 MW cumulative capacity from Assam Power Development Corporation
Limited.
16. 8th September, 2023 : SJVN signed Power Purchase Agreement for 18
MWSolarPowerwith BBMB.
17. 14th September, 2023 : Sh. Akhileshwar Singh, Director (Finance) SJVN
honoured with Best CFO Award 2023 in Power Sector by Dalai Street Journal.
18. 20th September, 2023 : SJVN signs MOU with PFC for ? 1,18,000 crores
financing of RE SThermal Projects.
19. 12th October, 2023 : SJVN received Letter of Award for 100 MW Solar
Power Project from RUVNL at a tariff of D2.62 per unit.
20. 27th October, 2023 : SJVN signed Memorandum of Understanding with M/s
Ocean Sun, Norway for collaboration in field of New Technologies in Green S Clean Energy
Sector.
21. 16th November, 2023 : SJVN signed Power Purchase Agreement for 200 MW
Grid Connected Wind Power Project with SECI.
22. 4th December, 2023 : SJVN commissioned 60 MW Naitwar Mori Hydro
PowerStation in Uttarakhand.
23. 26th December, 2023 : SJVN secured 100 MW Solar Power Project @
D2.63/Unit through e-RA conducted by GUVNL
24. 30th December, 2023 : SJVN commissioned 75 MW Gurhah Solar Power Plant
located in district JaLaun, Uttar Pradesh.
25. 22nd January, 2024 n of Understanding with
NHAI for providing Technical Consultancy Services.
26. 25th January, 2024 : SJVN Limited secured 100 MW Solar Power Project @
?2.54/Unit through e-RA conducted by GUVNL.
27. 23rd February, 2024 : SJVN Commissioned 50 MW Gujrai Solar Power Station
located in District Kanpur Dehat, Uttar Pradesh.
28. 27th February, 2024 : SJVN commissioned 100 MW Raghanesda Solar
PowerStation located in district Banaskantha, Gujarat.
29. 3rd March, 2024 : SJVN secured 200 MW Solar Project at a tariff of D2.66
perunit in e-RA Conducted by GUVNL.
30. 4th March, 2024 : Hon'ble Prime Minister Sh. Narendra Modi virtually
dedicated to the Nation four Power Stations of SJVN namely 60 MW Naitwar Mori Hydro Power
Station in Uttarakhand, 75 MW Parasan Solar Power Station, 75 MW Gurhah Solar Power
Station and 50 MW GujraiSolarPowerStation in Uttar Pradesh.
He also laid foundation stone of SJVN's projects viz. 382 MW Sunni Dam Hydro Electric
Project and 15 MW Nangal Floating Solar Power Project in Himachal Pradesh and 70 MW Solar
Project in Assam.
31. 7th March, 2024 : SJVN received Letter of Awards for 1352 MW Solar Power
Projects to be developed at various locations in districts of Maharashtra.
32. 10th March, 2024 : SJVN signed Power Usage Agreements for 500 MW Solar
Power and for 100 MW Solar Power with Rajasthan Urja Vikas and IT Services Limited.
38. PARTICULARS OF LOANS GIVEN, INVESTMENTS MADE GUARANTEES GIVEN AND SECURITIES
PROVIDED UNDER SECTION 186 OF COMPANIES ACT, 2013
Particulars of loans given, investments made, guarantees given and securities provided
along with the purpose for which the loan or guarantee or security is proposed to be
utilized by the recipient are as under -
Particulars |
Details |
Loans given |
Refer Note 2.5 and 2.13 to standalone financial statements |
Investments made |
Refer Note 2.4 to standalone financial statements |
Guaranteesgiven |
Refer Note 2.48 |
Securities provided |
Nil |
39. DETAILS OF NON-CONVERTIBLE SECURITIES ISSUED
In FY 2021-22 Company has raised the fund of D1000 Cr. through private placement of
Non-Convertible, Redeemable Debenture at a coupon rate of 6.10% p.a having maturity at
5-year tenor. No new NCD was raised in the FY2023-24.
40. DETAILS OF EXTERNAL COMMERCIAL BORROWINGS (ECB)
SJVN has tied up the USD 500 Million from PNB Dubai/ Gift City in FY
2021-22 and subsequently revised the sanction to USD 300 MN and
same has been disbursed and utilized toward capital expenditure in ongoing projects.
The Total Outstanding Borrowings of PNB-Gift City was?2474.03 Cr as on 31.03.2024
(Previous Year?2431.64 Cr).
SJVN has also tied-up the ECB amounting to JPY15 Billion. The entire ECB will be
utilized to meet out the Capital Expenditure of 100 MW Raganesda Solar Power Project in
the state of Gujarat and 90 MW Omkareshwar Floating Solar Power Project in the state of
Madhya Pradesh.
The Total Outstanding Borrowings of ECB-JBIC was D826.31 as on 31.03.2024
(PreviousYearNil).
The Outstanding foreign currency loan from World Bank for Financing RHPS was 1187.71
ason 31.03.2024 (Previous Year? 1423.92 Cr)
41. GENERAL
Directors of your Company state that no disclosure or reporting is required in respect
of the following items as there were no transactions/ events on these items/ matters
during the year under review:
1. The Company has not accepted any deposits during the year under review.
2. Issue of equity shares with differential rights as to dividend, voting or otherwise.
3. Neither the Managing Director nor the Whole-time Directors of the Company receive
any remuneration or commission from any of its subsidiaries.
4. No significant or material orders were passed by the Regulators or Courts or
Tribunals which impact the going concern status and Company's operations in future.
5. There have been no Material Changes and Commitments affecting the financial position
of the company which have occurred between the end of the financial year 2023-24 and the
date of this report.
6. The company has not made any buyback of shares during the year under review.
7. There have been no changes in the nature of business of the company during the year.
8. No application was made or any proceeding was pending against SJVN Limited under the
Insolvency and Bankruptcy Code, 2016 during the financial year 2023-24.
42. ACKNOWLEDGMENT
The Board of Directors acknowledge with deep appreciation, the cooperation and guidance
extended by various Ministries/Departments of the Government of India, particularly,
Ministry of Power, Ministry of New S Renewable Energy, Ministry of Finance, Ministry of
External Affairs, Ministry of Environment S Forest, Central Electricity Authority, Central
Water Commission, Geological Survey of India, the Government of Nepal, the Government of
Himachal Pradesh, State Governments of Bihar, Uttarakhand, Gujarat, Uttar Pradesh,
Maharashtra, Assam, Arunachal Pradesh, Jharkhand, Rajasthan, Punjab, Madhya Pradesh,
Mizoram and Odisha the State Electricity Boards and the World Bank. Your Directors also
convey their gratitude to the shareholders, various international and Indian banks and
financial institutions for the confidence reposed by them in the Company. The Board also
acknowledges and appreciates the contribution made by Contractors, Vendors, Consultants
and others for achieving the planned goals of the Company.
The Board also places on record its deep appreciation of valued cooperation extended by
the Office of the Comptroller and Auditor General of India and the Auditors. Last but not
least, the Board commends the hard work and dedicated efforts put in by the employees of
the Corporation including the employees on deputation at all levels.
For and on behalf of Board of Directors
|
(Sushil Sharma) |
Date: 13th August, 2024 |
Chairman & Managing Director |
Place: New Delhi |
DIN: 08776440 |