SENSEX 77439.99 (-0.18)
Nifty 50 23472.3 (-0.26)
Nifty Bank 50220.9 (0.08)
Nifty IT 41493.05 (-2.12)
Nifty Midcap 100 53939.35 (-0.19)
Nifty Next 50 67438.85 (0.04)
Nifty Pharma 21654.3 (-0.45)
Nifty Smallcap 100 17499.75 (-0.58)
NIKKEI 225 38242.66 (-1.04)
HANG SENG 19655.58 (1.18)
S&P 5924 (0.26)