27 Dec, 14:24 - Indian

SENSEX 78765.59 (0.37)

Nifty 50 23837.349609375 (0.37)

Nifty Bank 51301.8984375 (0.26)

Nifty IT 43714.05078125 (0.11)

Nifty Midcap 100 57169.75 (0.08)

Nifty Next 50 68916.296875 (-0.36)

Nifty Pharma 23040.099609375 (1.44)

Nifty Smallcap 100 18794.25 (0.35)

27 Dec, 14:24 - Global

NIKKEI 225 40281.16 (1.80)

HANG SENG 20090.46 (-0.04)

S&P 6083.75 (-0.38)


Hot Pursuit News

You are Here : Home > News > Hot Pursuit News >

(09 Dec 2024, 09:46)

JSW Energy rises as arm bags LoA from NTPC for 400 MW solar power project

JSW Energy advanced 1.20% to Rs 681.25 after the company announced that its wholly owned subsidiary, JSW Neo Energy, has received a letter of award (LoA) from NTPC for the development of a 400 MW ISTS-connected solar power project.


This award is part of NTPC's stariff-based competitive bid for 1,500 MW of ISTS-connected solar projects (NTPC-ISTS-III). With this new addition, JSW Energy’s total locked-in generation capacity has increased to 19.6 GW, of which 4.4 GW is dedicated to solar projects.

JSW Energy aims for a 10 GW operational capacity by FY 2025, currently operating 7.7 GW across thermal, hydro, and renewable energy. The company also has 16.2 GWh of energy storage capacity through battery storage and hydro-pumped storage projects.

The company aims to reach 20 GW of generation capacity and 40 GWh of energy storage capacity before 2030. JSW Energy has set an ambitious target of achieving carbon neutrality by 2050.

JSW Energy is primarily engaged in the business of generation of power, with principal places located at Vijayanagar (Karnataka), Ratnagiri (Maharashtra), Nandyal (Andhra Pradesh), and Salboni (West Bengal).

The company’s consolidated net profit marginally increased to Rs 853.25 crore in Q2 FY25 as against Rs 850.16 crore posted in Q2 FY24. Net sales marginally declined to Rs 3,237.66 crore in Q2 FY25 from Rs 3,259.42 crore reported in Q2 FY24.

More News
More Company News View Company Information